Design, prepare, compare

Garden building tools

Design a room to scale, prepare a project brief or compare a proposal. Keep your dimensions and unanswered questions with each result.

Sources checked 21 November 2026

Three cream records with blank ruled fields, a comparison grid and a clipped notes stack, with a pencil underneath.

Draw your garden room to scale

Enter finished internal dimensions, place furniture and adjust doors and windows. Start with the example, then make it yours.

Turn on JavaScript to design a room here. You can also use the size and site checklists and project brief planner.

What can you put in a supplier brief now?

Put the measurements you have into the planner. If you still need to check the site or delivery route, use the survey sheet and add the answers later.

Private project planner

Bring: your intended use, broad location, outside dimensions if known, site and access notes, wanted services, budget and priorities. All answers are optional. If you enter outside dimensions, supply both width and depth or leave both blank. A full address is not needed.

Leave with: a written brief and questions for suppliers, ready to review, copy or download as text. The budget field records your budget; it does not estimate what the project will cost.

Keep it: use the optional save, restore and delete controls for this browser, or download your own text copy. No account or supplier enquiry is created by generating the brief.

Open the private project planner

Keep three kinds of measurement separate.

  1. Outside building dimensions: the planner uses width and depth for a rectangular footprint. Also record overall height, projections and site clearances as questions; footprint alone does not settle plot fit or permission.
  2. Finished internal dimensions: use the space checker for the room inside the finished walls. Keep its result separate from the external building size.
  3. Delivery route: record the narrowest clear opening, overhead restrictions, turns, steps and carrying distance. A gate measurement alone does not establish that a component can be delivered safely.

Start with the site-envelope checklist, access measurements and foundation survey questions. Then use the planner’s supplier questionnaire to ask about scope, responsibilities, service records and commercial terms. Leave uncertain items as questions rather than choosing a convenient answer.

If you change answers after generating the brief, use Update my brief before copying or downloading again. The planner marks the previous output as out of date. Read the regenerated text before sharing it, especially any assumptions and unanswered questions.

Your garden building project brief.

Turn optional project answers into a reviewable brief with copy, text download and explicit browser-saving controls.

Open the private project planner

Small garden office sizes: will your desk fit?

Separate finished workspace from external footprint and the complete space required on the plot.

Use the size and site checklists

Check desk space or compare the evidence for a quote

Use a tool for the question it actually answers. Keep its assumptions and limits with the result so the next person can assess it.

Office space checker

Inputs: finished internal width and depth, one or two people, desk dimensions, chair and route zones, storage depth and desk orientation.

Output: a diagram, required working rectangle and any shortfall for desks along one wall. Start with an example, then replace it with your own values and select Check these dimensions.

Limits: fixed side/gap allowances are assumptions, not minimum standards. Doors, windows, occupied movement, access needs, escape, structure and comfort still need assessment.

Keeping it: copy or download the space brief; optional Save dimensions, Restore saved dimensions and Delete saved dimensions controls use this browser.

Open the office space checker

Printable project pack

Input: a checked space scenario from the same office tool.

Output: the plan, dimensions, assumptions, site reminders and supplier questions. Select Printable project pack, then Download printable HTML.

Limits: it is a planning exercise, not a certified layout or quotation. Open the HTML file in your browser and use Print or Save as PDF where available; this is a browser workflow, not a server-generated PDF.

Keeping it: check your browser’s download or save prompt. A downloaded file is a separate copy under your control.

Open the checker to create a project pack

Use in my project brief carries the checked internal-space assumptions from the office tool into the planner in the same browser. The planner’s outside width and depth remain separate. Review the imported result and your external measurements before generating the combined brief.

A geometry result is only one input to a useful workplace. The HSE workstation checklist (PDF) considers the actual workstation and environment, including matters that can only be assessed once it is installed. A rectangle that fits the model is not an ergonomic certification.

Use a worksheet when the question needs evidence.

The quote comparison separates supplier figures, exclusions and buyer allowances. The insulation evidence sheet asks what performance claims actually describe, while the services brief separates the room’s internal package from connections and data requirements. Their downloadable text sheets can be edited in your own document; they do not calculate or submit a quote.

Use those records to request a comparable written response. None establishes safe delivery, a suitable foundation, final electrical or drainage design, planning permission or a building-control result.

Compare garden room quotes. Keep the missing work visible.

Compare scope, VAT, exclusions, allowances and the conditions attached to each written offer.

Use the quote-comparison worksheet

Garden room electricity and broadband: connect the whole job.

Prepare equipment, connection, route and responsibility questions for power and data.

Use the services planning worksheet

Which measurements and costs still need checking?

Before relying on an output, ask where each input came from and what remains unresolved. Keep unknown costs visible and update the record when the evidence changes.

A layout drawn to scale can still be wrong if you’ve guessed the room width. Label each important value before using it: measured, assumed, recorded from a dated supplier document, awaiting survey or awaiting quotation. Keep the source and the decision it supports together.

Entirely fictional ledger: not site measurements, supplier evidence or a market estimate
Example itemEvidence labelWhat still needs checking
Clear gate opening: 0.86mMeasured — within this fictional example only.Record where, when and between which obstructions it was measured; seek confirmation for actual components and handling.
Proposed outside footprint: 3.20 × 2.80mIllustrative assumption — a proposed size, not a surveyed plot.Check the complete site envelope and the supplier’s dimension basis before selecting the building.
Finished internal drawing: 2.90 × 2.50mDated supplier source — fictional Drawing A, revision 1, dated 20 November 2026.Keep the document and revision. Confirm finished dimensions, openings and the actual layout; this is not a site measurement.
House-to-room service routeTo be surveyed — route and site work unknown.Identify who assesses the endpoints, capacity, route and reinstatement before defining the work.
House connection priceTo be quoted — amount unknown.Keep it unpriced. Do not enter zero or treat an included internal pack as a quote for the house connection.

Every measurement, document and date in the example above is invented. The labels demonstrate a record-keeping method. In your project, a measured gate is evidence about that opening, a supplier drawing describes its stated design, and an assumed footprint remains a proposal. Those are different kinds of confidence.

Unknown is not zero.

Keep confirmed supplier amounts, your own allowances and unpriced items in separate columns. A total of known figures is a subtotal while required work remains unpriced. Record VAT, quote validity and survey conditions alongside each figure. Do not turn a budget band or a provisional allowance into a claim that a particular building is affordable.

A worksheet or tool also does not provide permission. GOV.UK distinguishes planning from building-regulations approval; the appropriate route depends on the actual project and nation. Use the permissions guide below to prepare those separate enquiries.

Keep an evidence row with the output it supports.

Use one row per important input, copying the fields below as needed. The text worksheet includes the same fields and the labelled fictional example. It is an ordinary editable document, not another calculator.

File: garden-building-evidence-worksheet.txt.

Repeatable evidence record: complete one for each important input
FieldYour record
Item and decisionWhat are you recording, and which layout, budget, specification or site decision will use it?
Record: ______________________________
Value and measurement basisValue, units and scope; for dimensions state external, finished internal or clear opening. Write unknown where appropriate.
Record: ______________________________
Evidence statusMeasured / illustrative assumption / dated supplier source / to be surveyed / to be quoted. Explain any mixed status.
Record: ______________________________
Source and versionPerson or document, date, revision, location or measurement method; note whether evidence is preliminary or confirmed.
Record: ______________________________
Supplier amount and VAT basisQuoted amount only if supplied, what it includes, VAT basis, validity and conditions. Otherwise write unknown.
Record: ______________________________
Separate buyer allowanceYour own provisional budget allowance and basis, if any. Do not present it as a supplier price or merge it with an unknown quote.
Record: ______________________________
Unresolved check and responsibilityWhat still needs survey, design, evidence or quotation; who will obtain it and the next action.
Record: ______________________________
Output and review dateWhich brief, worksheet or drawing uses this value; date to review it and which outputs need updating after a change.
Record: ______________________________

Saved in the browser, downloaded and shared are different actions.

The planner and space checker offer explicit browser saving; neither requires you to save before using it. Restore the saved information in that browser, review it and regenerate or recheck the output after changes. Storage, copying and downloads depend on browser permissions and settings; follow the message shown if an action fails.

Delete saved project or Delete saved dimensions removes that tool’s saved record from the browser; it leaves the current form unchanged. It does not delete a downloaded file, clipboard contents or a copy you have already shared. Use your device’s controls to manage those copies, and avoid saving personal details on a shared browser.

Generating or transferring these briefs does not send a supplier enquiry. You choose whether to copy, download or share the result. Check what each file contains before sending it, and refresh any output whose measurements, specification or quote assumptions have changed.

Garden room costs: price the complete project.

Build a whole-project cost picture while keeping supplier scope, site-dependent work and unpriced items visible.

Check the complete budget scope

Garden room permissions: choose the nation, then define the use.

Route the actual project to the right national planning, building-control and other enquiries.

Prepare the permissions evidence brief

Sources and checks

Garden Building Guide checked the existing planner, office-space feature and linked worksheet sources on 20 November 2026. Tool descriptions refer to their current inputs, controls and stated limits, not to a full-site network audit or a guarantee that a browser action will succeed. The example ledger is entirely fictional, including its measurements, supplier drawing and date; it is not a measured project, supplier quotation or market estimate. The blank record is an original evidence-organising aid. HSE guidance is referenced for the wider workstation assessment, and the official approval link explains a separate regulatory process. No geometric result, brief or worksheet establishes design suitability, professional approval or a final price.

  1. HSE display-screen workstation checklist — The May 2013 checklist considers the actual workstation and environment; some matters require assessment after installation. The office geometry tool is not an ergonomic certification. Checked 20 November 2026.
  2. GOV.UK building-regulations approval — Planning and building-regulations approval are distinct. A brief, calculation or worksheet is not an authority decision; use the appropriate national route. Checked 20 November 2026.