GARDEN BUILDING INPUT EVIDENCE WORKSHEET Garden Building Guide | 20 November 2026 Filename: garden-building-evidence-worksheet.txt An editable record, not a calculator, quotation, design or approval. Copy the blank record for each measurement, cost or assumption you’re relying on. Mark an amount ‘unknown’ until you have a figure. Separate a supplier’s amount from your own provisional allowance. Record scope, VAT, validity and conditions. BLANK EVIDENCE RECORD LINE: Item and decision What are you recording, and which layout, budget, specification or site decision will use it? Record: LINE: Value and measurement basis Value, units and scope; for dimensions state external, finished internal or clear opening. Write unknown where appropriate. Record: LINE: Evidence status Measured / illustrative assumption / dated supplier source / to be surveyed / to be quoted. Explain any mixed status. Record: LINE: Source and version Person or document, date, revision, location or measurement method; note whether evidence is preliminary or confirmed. Record: LINE: Supplier amount and VAT basis Quoted amount only if supplied, what it includes, VAT basis, validity and conditions. Otherwise write unknown. Record: LINE: Separate buyer allowance Your own provisional budget allowance and basis, if any. Do not present it as a supplier price or merge it with an unknown quote. Record: LINE: Unresolved check and responsibility What still needs survey, design, evidence or quotation; who will obtain it and the next action. Record: LINE: Output and review date Which brief, worksheet or drawing uses this value; date to review it and which outputs need updating after a change. Record: ENTIRELY FICTIONAL EXAMPLE LEDGER All values, measurements, supplier records and dates below are invented. They demonstrate labels, not actual site evidence or a market estimate. EXAMPLE: Clear gate opening: 0.86m Evidence label: Measured — within this fictional example only. Next check: Record where, when and between which obstructions it was measured; seek confirmation for actual components and handling. EXAMPLE: Proposed outside footprint: 3.20 × 2.80m Evidence label: Illustrative assumption — a proposed size, not a surveyed plot. Next check: Check the complete site envelope and the supplier’s dimension basis before selecting the building. EXAMPLE: Finished internal drawing: 2.90 × 2.50m Evidence label: Dated supplier source — fictional Drawing A, revision 1, dated 20 November 2026. Next check: Keep the document and revision. Confirm finished dimensions, openings and the actual layout; this is not a site measurement. EXAMPLE: House-to-room service route Evidence label: To be surveyed — route and site work unknown. Next check: Identify who assesses the endpoints, capacity, route and reinstatement before defining the work. EXAMPLE: House connection price Evidence label: To be quoted — amount unknown. Next check: Keep it unpriced. Do not enter zero or treat an included internal pack as a quote for the house connection. KEEP OUTPUTS CURRENT When evidence changes, update the affected brief, worksheet or drawing. Review regenerated text before sharing it. A sum of known figures remains a subtotal while required work is unpriced. SAVING AND SHARING This ordinary text download does not send its contents to Garden Building Guide or a supplier. Save and edit your own copy, then choose what to share. Deleting saved tool data in a browser does not delete downloaded, copied or already-shared documents.