Private project planner

Your project brief

Use the measurements you have and leave unknowns blank. The planner turns your answers into a brief in your browser. You choose whether to copy, download or share it.

Sources checked 20 November 2026

A tape measure, a pencil sketch of a garden plot and a blank ruled brief sheet on a worktable.

Describe the project.

All answers are optional. Create a private brief in your browser, then choose what to copy, download or share. Nothing is sent to a supplier.

About your answers, measurements and privacy

Make a private discussion brief. These answers create text in your browser; the planner does not send a supplier enquiry or save them to an account. You decide what to copy, download or share.

All answers are optional. Enter both outside dimensions or leave both empty. A budget is your spending intention, not a calculated price. Use a broad area rather than a full address, and leave personal details out of free text unless you need them in the brief.

Distinguish what you measured, what a supplier drawing states, what you have assumed and what remains unknown. Add that context in the notes. If you arrived from the office-space checker, its required internal rectangle appears separately; it does not fill the outside-size fields or establish that a building fits the site.

What would you like to use it for?
Size and location

Use approximate outside dimensions in metres. This gives a rectangular footprint, not the usable floor area inside. Enter both measurements, or leave both empty.

The planner accepts dimensions from 0.5 to 30 metres, in steps of 0.1 metre.

A full address is not needed for this brief.

The site, base and access

Measure between obstructions. Tell the supplier about steps, bends and restricted height as well as width. Accepted range is 20–1,000 cm.

Services and connections

Tick anything you may want. Leave these blank if you need help deciding. Routes, capacity and installation costs need checking with the supplier and relevant trades.

Budget, timing and priorities

This records your budget rather than estimating a price. Think about the building, base, delivery, installation, services, fit-out and VAT.

How to change, save or share your brief

Create, check, then share

Choose Create my brief. The result records your answers and questions for the supplier, including unresolved measurements and scope. The “Generated on” date comes from your device when you create or update the brief. Keep the survey date and original save date separately, and check whether the information still applies.

The result is read-only. Edit the answers above and choose Update my brief to revise it. Changes mark the previous result out of date and disable its copy and download controls until you regenerate.

Review the regenerated text, then use Copy brief or Download as text. If the browser blocks an action, follow the displayed fallback and copy the text manually. Sharing is your separate decision; this does not request a quotation.

Save answers on this browser

Save project answers stores the current answers and any imported internal-space values. Use Restore saved project when returning, then check the answers and generate a fresh brief. Storage can be unavailable or cleared by the browser.

Delete saved project removes this planner’s saved record from this browser. It leaves the current form, downloaded files, clipboard copies and anything you already shared intact. There is no account backup or automatic expiry; take care on a shared device.

Take a site-survey record into the conversation.

Use the blank sheet below to organise observations and questions. For each entry record measured, supplier-stated, assumed or unknown, the units, evidence date and source. An unmeasured distance or an unpriced connection stays unknown. This is a buyer’s information record, not a structural, electrical or access-handling assessment.

A useful entry is “outside width 3.2 m, assumed for discussion; finished inside width unknown; supplier drawing requested”. That is a fictional note showing how to label uncertainty, not a recommended room size. Keep site sketches and photographs with the record and identify the same reference in your brief.

Site-survey record — add status, units, evidence date and source to every entry.
RecordYour observations and open questions
Record and evidenceVisit date: ______ Recorded by / broad site reference: ______ Drawing or photo reference and revision: ______
Use and occupancyActivities, people, equipment and hours of use: ______ Seasonal use: ______ Changes to discuss: ______
Outside envelopeProposed outside width × depth and overall height, with units: ______ What those dimensions include: ______ Roof projection / maintenance space to check: ______
Required internal spaceFinished usable width × depth and ceiling height: ______ Desk or equipment rectangle and movement space: ______ Supplier drawing / office-checker assumptions: ______
Openings and plotDoor position, clear opening, swing, thresholds and window positions: ______ Boundaries, trees, drains, existing structures and retained access: ______
Ground and baseVisible surface and level changes; existing base facts: ______ What cannot be established by this visit: ______ Who will assess suitability and drainage: ______
Complete delivery routeUnloading point, narrowest clear width and height with units, turns, steps, slopes and total carry: ______ Route photos / sketch: ______ Handling, protection or neighbour permission still to agree: ______
Power, data, water and drainageWanted services and likely endpoints: ______ Route surfaces and measured / assumed distances: ______ Separate power and router-to-desk data questions: ______ Capacity, feasibility and responsible trades still to confirm: ______
Permissions and restrictionsNation / local authority and actual intended use: ______ Known planning, building-control, landowner or title questions: ______ Responsible person and next enquiry: ______
Scope, cost and next actionSupplier inclusions / exclusions and VAT basis: ______ Buyer budget: ______ Unpriced items, evidence needed, responsible person and due date: ______

The text download contains the same prompts and can be edited or printed in your own text editor. “Print this whole guide” opens the browser’s print workflow for this page; it does not create a worksheet-only file.

Which questions are still open?

Pick a guide for something you still need to check, such as the route through the garden or the cost of connecting the room. Then update the brief before sending it to another supplier, so everyone is working from the same scope and assumptions.

Ask each supplier to confirm the same essentials.

  • The itemised scope, VAT basis, exclusions and what can change after a survey.
  • Who checks the ground, delivery route, base and service connections, and who pays for each part.
  • The outside footprint, finished usable dimensions, overall height and remaining access or maintenance space.
  • The actual intended use and who resolves the relevant permission, building-control and other restrictions.
  • The drawing and specification revision, payment stages, timing, quote validity, cancellation terms, warranty and aftercare.

Ask for decisions and exclusions in writing. This brief records the discussion; it does not confirm a price, consent or technical suitability.

Garden room costs: price the complete project.

Separate the building price from groundworks, delivery, connections and the rest of the project.

Check whole-project budget scope

Compare garden room quotes. Keep the missing work visible.

Use the same scope, exclusions, evidence and buyer allowances when comparing suppliers.

Compare itemised quotations

Small garden office sizes: will your desk fit?

Check outside dimensions, finished internal space and what the size label actually measures.

Check dimensions and working space

Garden room electricity and broadband: connect the whole job.

Separate the internal electrical pack, house connection and usable data connection.

Brief the power and data work

Garden office with a toilet: check feasibility first

Investigate layout, water and drainage feasibility before treating a WC as a simple addition.

Check the toilet and drainage scope

Find garden room suppliers and installers by area

Use the completed supplier-finding route to decide who can assess the actual project.

Find suppliers for the project

Garden building tools: prepare, compare and check the evidence.

Find the office-space checker and evidence or comparison worksheets that support this brief.

Choose the next worksheet or tool

Sources and checks

Garden Building Guide reviewed the existing planner interface, text-generation logic, browser storage, internal-space transfer and linked guide scope on 20 November 2026. The site-survey record is an original organisational aid; its example note is fictional. The generated date comes from the visitor’s device when a brief is created, not from a checked survey or supplier record. No price calculation, supplier submission, professional assessment or approval is produced. Feature descriptions concern the planner’s reviewed behaviour, not a claim that the whole website makes no network requests.