What will it cost?
A building price is only part of the project. Separate the base, access, house connections and finishing. Our worked budget shows the arithmetic, with every allowance labelled.
See the whole-project exampleGarden office buying guide
Start with the desk and chair you’ll actually use. Check they fit inside the finished room, then ask what it will cost to get power to the desk and the building into your garden.

Garden offices at a glance
How many people will work here at the same time? That answer affects the desk layout, the space around the chairs and the size of room to price.
A building price is only part of the project. Separate the base, access, house connections and finishing. Our worked budget shows the arithmetic, with every allowance labelled.
See the whole-project exampleMeasure inside the finished walls. Our example layouts use 2.4 × 2.2m for one person and 3.4 × 2.7m for two. These are test layouts, not minimum sizes.
Try your desk and room dimensionsCheck the property and intended use before ordering. Planning and building regulations are separate questions, and the UK nations have different rules.
Find the appropriate guidanceTest an occupied chair, storage and the door. Use the space checker, then carry your required internal dimensions into a brief for suppliers.
Prepare a comparable briefChoose the building
Ask for the finished internal dimensions and a list of what comes with the building. Two suppliers can use the same name for quite different rooms.
A small outdoor office pod can suit one regular user with modest storage. Test the finished internal plan before accepting a “one-person” label. Tiny pods leave less freedom to move the desk or add a visitor.
See the one-person layoutDraw both workstations with the chairs pulled out. If you’ll also use the room for meetings or a hobby, draw that arrangement too. A larger garden room is useful only if doors, glazing and services leave the right working walls available.
Test two working positionsStart with a survey of structure, base, roof, moisture and services. Adding lining and insulation reduces usable space. Price the complete conversion before assuming it is the cheaper office solution.
Compare the buying routesGive every supplier the same internal measurements and list of work to price. “Pod”, “studio” and “office pack” are marketing labels, not interchangeable specifications.
Supplier prices
Check the base, floor finish and electrics in each offer before comparing prices. These are different buildings and sizes, not a like-for-like price ranking.
Use the two-person example as a request: 3.4 × 2.7m finished internal space, with the stated desk and chair allowances. None of the three starting prices below establishes that exact finished layout. Ask for a dated drawing and an itemised price for your site.
| Compare the same item | Noah pod | Green B1 Lite | Chew Valley compact |
|---|---|---|---|
| Starting offer incl. VAT | £6,359* | £9,485 | £14,400 guide price |
| Advertised dimensions | 2.44 × 1.83m Basis unknown | 2.46 × 2.62m Basis unknown | 2.5 × 2.5m Basis unknown |
| Base / foundations | Extra Price groundworks | Extra Foundation upgrade | Unknown Ask for site scope |
| Floor finish | Included Vinyl | Extra Flooring upgrade | Unknown Specify the finish |
| Internal electrical fit-out | Extra Electrical package | Extra Electrical upgrade | Unknown Request itemisation |
| Connection to the house | Extra Unless expressly quoted | Unknown Confirm separate scope | Extra House cable separate |
| Delivery allowance | Eligible domestic orders within 150 miles of Telford | Within 50 miles of factory, HP18 0XB | Unknown Confirm postcode |
| Published guarantee | 10 years; terms apply | 7 years for B1 Lite | 10 years; terms apply |
| Supplier source | Noah specification | B1 Lite specification | Chew Valley guide |
*Noah’s live page showed £6,359; an extracted version showed £6,976. Treat the figure as indicative until the supplier confirms a current written price. These are different buildings, not a cheapest-to-best ranking.
Noah Garden Rooms
£6,359 starting price, including VAT
Advertised 2.44 × 1.83m. Confirm whether those are finished internal or external dimensions.
Green Retreats
£9,485 starting price, including VAT
Entry model. Select the exact size and request both internal and external drawings before comparing floor area.
Chew Valley Garden Studios
£14,400 guide price, including VAT
Advertised 2.5 × 2.5m. Confirm the finished internal size and a quotation for your actual site.
Prices checked 20 November 2026 and subject to configuration, offer changes and a site-specific quote. Confirm a written current quotation. No unverified discount has been applied.
We selected three named suppliers with published compact-office or entry-range information to expose differences in scope. This is a small illustrative selection, not the whole market or a “best supplier” ranking. We checked supplier pages, not completed buildings, independent thermal tests or customer contracts. Missing detail is labelled as a question rather than assumed included. A structural guarantee is not a promise that every component has the same cover.
Sources: Noah pod guide, Green Retreats range comparison, B-Range product information and Chew Valley garden rooms. Recheck the selected configuration before paying a deposit.
A worked budget, not a quotation
We configured the B1 Lite at the advertised 2.46 × 2.62m size on 20 November 2026. The selected supplier options total £12,161 including VAT. The source does not establish the finished internal dimensions.
The two site-connection allowances below are fictional VAT-inclusive amounts to demonstrate the arithmetic, not typical trade prices. Replace them with quotations for your site.
| Budget item | Amount | Evidence |
|---|---|---|
| B1 Lite building | £9,485 | Configurator |
| Foundation option | £1,065 | Configurator |
| Fitted laminate floor | £189 | Configurator |
| DIY exterior paint kit | £72 | Configurator; labour excluded |
| Electrical pack with heater | £1,350 | Configurator |
| Configured supplier total | £12,161 | VAT, installation and eligible delivery included |
| House connection & making good | £1,500 | Fictional allowance |
| Data connection | £300 | Fictional allowance |
| Illustrated project subtotal | £13,961 | £12,161 + £1,800 |
The electrical pack includes two surface-mounted double sockets, a panel light, consumer unit and 1.5kW standing oil-filled radiator. We have not added a second heater. Delivery is included within 50 miles of the factory, HP18 0XB. Recheck the B-Range configurator.
Still unpriced: clearance and ground preparation, spoil disposal, difficult access, extra delivery, DIY painting labour, permissions, furniture and any additional survey findings. A foundation option does not establish that all groundworks are covered. This subtotal is not a complete price for your site.
Build your own itemised comparisonExample floor plans
Start with furniture and movement, then find a shell around them. These original layouts use stated assumptions; they are not product floor plans or accessibility standards.
One person
Two people
A 1.2 × 0.6m desk leaves 0.6m either side. In depth: 0.6m desk + 0.9m chair zone + 0.7m remaining strip = 2.2m. That last strip is arithmetic, not an approved circulation width. A door swing or storage can consume it.
Two 1.2 × 0.7m desks, a 0.2m gap and 0.4m at each end fill 3.4m. In depth: 0.7m desks + 1m chair zone + 1m remaining route. Test both occupied chairs together; two video calls may need acoustic separation.
Use tape on the floor and your real chairs. Open drawers, move away from the desk and test the entrance. Ask for external dimensions, finished internal dimensions and the complete site envelope—including eaves, gutters and maintenance space—on one drawing. See the full size and layout guide.
Desk space checker
A quick geometry check for desks along one wall. Use finished internal dimensions. This does not assess doors, structure, accessibility, escape routes or comfort.

Specify the whole room
Ask how the room will stay warm while you work in winter and how you’ll shade and ventilate it in summer. Include the electrical supply in the same discussion.
Request the complete floor, wall and roof build-up and relevant performance evidence. A material name or thickness alone does not compare whole-building heat loss. Ask about joints, windows, doors and condensation control. Double glazing describes a component, not the room’s energy use.
Tell the supplier how many hours you will work and what temperatures you need. Request a heating design suited to the building. Consider external shade, blinds and opening windows before a glass-heavy frontage. Ventilation and summer overheating need their own answers.
Separate internal sockets and lighting from the connection back to the house. Ask a competent electrician to assess the existing supply, route, protection, testing and certification. Record heating and equipment loads. Test broadband at the proposed site and compare wired, wireless or mobile options.
Plan electricity and broadbandPosition screens to manage glare; allow for task lighting and an adjustable workstation. An insulated shell is not automatically soundproof. Ask for evidence relevant to calls, music or outside noise. Include security, blinds, storage and the route from the house in your brief.
Use the HSE workstation checklistAsk for: the floor, wall and roof build-up, including joints and moisture-control details.
Useful answer: a dated specification for the chosen model, with any performance claims tied to the complete assembly.
Follow up: “fully insulated” with no construction detail tells you too little.
Ask for: heating, opening windows, ventilation and shading for your working hours and orientation.
Useful answer: a design addressing winter heat loss and summer sun separately.
Follow up: double glazing alone does not establish a fixed heating bill or solve overheating.
Ask for: separate internal and house-connection scopes, routes, reinstatement and required testing.
Useful answer: named responsibilities and an itemised specification after checking the site.
Follow up: an “electrical pack” that does not explain the supply from the house. Find a registered electrician.
Ask for: evidence relevant to the noise source and proposed use, including doors and windows.
Useful answer: clear limits and a specification for the whole room.
Follow up: treating ordinary thermal insulation as proof of soundproofing.
For running-cost comparisons, use energy consumed (kWh) × your tariff (£/kWh). For example, an illustrative 1kW heater drawing full power for 4 hours uses 4kWh; at an assumed £0.25/kWh that is £1. Actual heating duty, weather and tariff differ. This is arithmetic, not a forecast for a particular room.
Buying and installation
| Route | When to consider it | What to resolve |
|---|---|---|
| Installed package | You want coordinated design, delivery and assembly. | Who owns foundations, access, connections, damage and final sign-off? “Turnkey” needs an itemised definition. |
| Supply-only kit | You have suitable skills or a separately appointed installer. | Check assembly instructions, tools, lifting, weather protection, lead times and warranty responsibilities before delivery. |
| Bespoke build | The site, access, dimensions or use needs a tailored design. | Agree drawings, performance specification, design responsibility, staged payments and how changes are priced. |
| Conversion or used room | A viable existing shell or relocated building may suit the brief. | Survey condition; price dismantling, transport, reinstatement and services. Confirm whether any warranty transfers. |
Stand inside the closest size, sit at a real workstation and check the lower ceiling height, sill positions, door opening and finishes. Ask whether the display has upgrades. Photograph the specification label with permission and take away a dated drawing.
Check a supplier’s legal identity, service area, written payment stages, cancellation and variation terms, warranty exclusions and aftercare route. Read attributed customer reviews for patterns and ask about comparable completed projects; a star rating does not establish your specification.
Manufacturing lead time and days on site are different. Agree survey, design approval, permissions, groundworks, delivery, assembly, connections, snagging and handover in that order where applicable. Weather and site conditions can change the programme.
Record gate widths, turns, slopes and overhead obstacles. Fully assembled delivery may need lifting access that a panel-built office does not. Read our access measurement guide and foundation checklist.
Maintenance intervals and insurance cover are product- and policy-specific. Ask for the relevant written documents rather than assuming universal cover. Read GOV.UK’s home-business guidance and, as a product-specific example, Noah’s maintenance guidance.
Your supplier brief
Put the desk layout, delivery route and connections in one brief. You can copy or download it from the private planner and choose which suppliers receive it.
Create your project briefBefore you shortlist
The one whose finished layout and complete installed scope meet your brief. Start with your actual desk and chair, add storage and door movement, then compare the external envelope with your plot. Our one-person example is a test layout, not a minimum building size or a product recommendation.
Possibly, but do not infer it from floor area alone. Test two occupied workstations and an exit route. Our side-by-side example needs 3.4 × 2.7m internally with its stated furniture and clearances. Calls, accessibility or meetings may require a different layout or more space.
Not necessarily. Ask separately about sockets and lighting inside, the supply from the house, trenching and reinstatement, testing and certification. Compare a written list, not the package label.
Those components help, but do not settle the question. Compare the full construction, heating provision, ventilation, summer shading and your working hours. Request performance evidence; do not infer a fixed heating bill from insulation branding.
Both change the brief. A toilet introduces water and drainage feasibility; sleeping or separate residential use can change planning and building-control requirements. Establish the intended use with the relevant authority before buying an office model for accommodation.
Do not assume a universal resale premium or a financial return. Compare expected use with purchase, services, energy, maintenance and eventual removal. Seek property-specific valuation evidence if resale value is central to your decision.
Keep planning
Research and editorial method. Garden Building Guide compares linked primary supplier and official sources, records unresolved scope, and keeps calculations and assumptions visible. Prices are dated observations, not site-specific quotations. This is desk research, not a building survey or a product test. Supplier links are independent; no paid placement or approved referral arrangement is included.
Review date: 20 November 2026. Supplier information was checked against published sources; the Tring example is attributed supplier reporting, not a first-hand review. Recheck price and scope before ordering. Layouts and the checker are planning aids; a dimensioned supplier drawing and site-specific checks come next.