The actual building
An ex-display package, a private used sale and moving your own office involve different evidence and contracts. Identify the seller and exact specification.
Check the building and sellerCondition and relocation
At the viewing, check the roof edge, cladding and threshold from places you can reach safely. Find out how this particular building can be moved. Compare the price after dismantling, transport, a new base and reconnection.

At a glance
An ex-display package, a private used sale and moving your own office involve different evidence and contracts. Identify the seller and exact specification.
Check the building and sellerA general “relocatable” claim is not a method for dismantling or lifting this model. Collection access and the receiving site both need assessment.
Prepare the two-site briefSeparate included work, priced extras, exclusions and unknowns. Keep your provisional allowances distinct from supplier quotations.
Use the relocation quote sheetFor a second-hand garden office, establish who owns the building, who is selling it and who contracts for each part of the move. Record whether the seller acts as a trader or private individual, and whether you are buying as a consumer or business. A privately advertised room is not the same offer as a dealer’s installed ex-display package; neither label settles its condition.
Save the advert, exact specification, photographs and written terms. Confirm what stays with the room, who removes it, the collection deadline and whether it will remain in use before removal. Compare finished internal dimensions and opening positions with your needs using the size guide; attractive furniture in the viewing photos may not be included.
Its ex-display terms, checked 21 November 2026, say prices normally include VAT, dismantling, local delivery and installation unless stated otherwise. Local delivery is approximately 40 miles from Farnham. Display use continues until removal; lead times can equal or exceed new orders.
Its ex-display guidance, checked the same day, includes delivery and installation within 25 miles of the building’s display location and describes its teams dismantling, transporting and reassembling the room.
These are seller-specific published scopes, not market norms, surveyed quotations or confirmation of any individual building’s availability. Ask about item exceptions, the base, connections and repairs. An ex-display office can contain costly upgrades, so compare the required specification rather than assuming it is the cheapest route.
Stay at safe ground level and use accessible viewing positions. Do not climb on the roof, remove linings or coverings, probe materials destructively or open electrical equipment. Record inaccessible areas as unknown and arrange the relevant competent assessment. A stain is evidence to investigate; it does not identify the moisture source or prove concealed timber sound.
For each entry below, separate what you observed from the seller’s answer and supporting documents. Add dated photographs, the precise location, the unresolved question and who will assess it. If safe access is doubtful, leave that part uninspected. This buyer record is not a structural, damp or electrical survey.
| Record | Evidence / question |
|---|---|
| Seller and contract | Name/contact; trader or private seller; consumer or business purchase; advert and terms saved: ____ |
| Building identity | Maker, model, serial/reference, age, original invoice, drawings and alterations: ____ |
| What is supplied | Dimensions and measurement basis; insulation/finishes; doors, keys, services, fittings and exclusions: ____ |
| Walls and floor | Visible distortion, open joints, staining or damage from safe positions; inaccessible areas: ____ |
| Roof and weathering | Ground-level visible covering, edges, gutters and leak history; hidden areas not assessed: ____ |
| Doors and glazing | Visible cracks/misting, frame condition and safe seller demonstration; unresolved operation/locks: ____ |
| Inside and moisture | Visible marks, odour, ventilation and seller-reported leaks or repairs; cause remains unverified: ____ |
| Service records | Electrical installation/test records; heating, water or drainage documents; alterations and missing evidence: ____ |
| Condition handovers | Dated photos at viewing, collection and arrival; continued use; agreed changes and damage record: ____ |
| Outstanding questions | Observed / seller-stated / document-supported / unknown; evidence reference/date; assessor and next action: ____ |
Agree how material changes between viewing and removal will be recorded and addressed. Keep a collection condition record and compare it with arrival and reassembly records; photographs alone do not allocate contractual responsibility.
A removable garden office building may be designed to separate into components, may require a specifically engineered whole-building move, or may not be suitable for relocation in its present condition. Have this building assessed before you choose between dismantling and lifting it. An advert alone can’t tell you which method it can withstand.
The Green Retreats relocation FAQ describes its rooms as movable but cautions that the chargeable moving cost can make relocation unviable. This is a general manufacturer statement, not approval for a particular used model, lifting method or retained guarantee.
| Check | Collection site | Receiving site |
|---|---|---|
| Address and permission | Address, contact, owner consent and agreed access date: ____ | Address, contact, owner consent and intended use: ____ |
| Ground route | Narrowest clear width/height, turns, steps, slopes and carry distance: ____ | Narrowest clear width/height, turns, steps, slopes and carry distance: ____ |
| Vehicle and work area | Parking/loading restrictions, working space and protection: ____ | Unloading/assembly space, parking restrictions and protection: ____ |
| Possible lifting constraints | Overhead obstacles/services, nearby property and assessment needed: ____ | Overhead obstacles/services, nearby property and assessment needed: ____ |
| Building and base | Current supports, fixings, disconnection and removal/making-good scope: ____ | Model-specific foundation requirements, site assessment and base readiness: ____ |
| Services and permissions | Who isolates services and records safe disconnection; consents: ____ | Power/data/water/drainage scope; relevant planning/building-control questions: ____ |
| Survey and timing | Surveyor/mover, report/date, access assumptions and removal deadline: ____ | Surveyor/installer, report/date, readiness, storage fallback and installation date: ____ |
The access guide helps record clear dimensions, turns and protection; it does not approve a crane or transport method. Check the receiving foundation requirements against this exact model rather than assuming an existing patio or the old supports can be reused.
Moving a room does not carry the old site’s planning position to the new site, and “temporary” or “removable” is not an automatic exemption. Use the permissions route for the receiving property, nation and intended use. No model-specific relocation instructions, actual transport quotation or assessed sites have been supplied for this guide.
Ask for an itemised quotation tied to the building, both site assessments and the movement method. Record its date, validity, VAT basis, assumptions, responsible party and payment stages. Mark any figure that’s still an estimate pending a survey. On a quote for assessed work, ask which items still carry conditions.
Use four scope labels: included in a named offer, priced extra, excluded for somebody else to arrange, or unknown. An unknown price is not zero. An included line points back to its package price and must not be added twice. Your allowance is a provisional planning amount, not a supplier price or evidence that work can be done for it.
The text download contains the two-site inputs above, every cost line below and the total/change record. The printed guide contains the same useful fields.
| Cost line | Supplier quotation | Buyer allowance | Evidence and owner |
|---|---|---|---|
| Building and included fittings | Status ____; £____; VAT basis ____; included in offer/line ____ | £____; VAT basis ____; reason ____ | Quote/date/validity ____; responsible party ____; exclusion/question ____ |
| Condition survey / move assessment | Status ____; £____; VAT basis ____; included in offer/line ____ | £____; VAT basis ____; reason ____ | Quote/date/validity ____; responsible party ____; exclusion/question ____ |
| Service isolation / disconnection | Status ____; £____; VAT basis ____; included in offer/line ____ | £____; VAT basis ____; reason ____ | Quote/date/validity ____; responsible party ____; exclusion/question ____ |
| Dismantling / packing / replacement parts | Status ____; £____; VAT basis ____; included in offer/line ____ | £____; VAT basis ____; reason ____ | Quote/date/validity ____; responsible party ____; exclusion/question ____ |
| Lifting / loading / protection | Status ____; £____; VAT basis ____; included in offer/line ____ | £____; VAT basis ____; reason ____ | Quote/date/validity ____; responsible party ____; exclusion/question ____ |
| Transport / transit cover / storage | Status ____; £____; VAT basis ____; included in offer/line ____ | £____; VAT basis ____; reason ____ | Quote/date/validity ____; responsible party ____; exclusion/question ____ |
| Destination foundations / site works | Status ____; £____; VAT basis ____; included in offer/line ____ | £____; VAT basis ____; reason ____ | Quote/date/validity ____; responsible party ____; exclusion/question ____ |
| Reassembly / repairs / weatherproofing | Status ____; £____; VAT basis ____; included in offer/line ____ | £____; VAT basis ____; reason ____ | Quote/date/validity ____; responsible party ____; exclusion/question ____ |
| Reconnection / inspection / testing | Status ____; £____; VAT basis ____; included in offer/line ____ | £____; VAT basis ____; reason ____ | Quote/date/validity ____; responsible party ____; exclusion/question ____ |
| Waste / old-site and new-site making good | Status ____; £____; VAT basis ____; included in offer/line ____ | £____; VAT basis ____; reason ____ | Quote/date/validity ____; responsible party ____; exclusion/question ____ |
Planning total, if you choose to combine the first two: £____, with VAT basis ____. It remains provisional where allowances or unknowns remain. Written changes, payment stages, cancellation/failed-move terms and validity: ____.
Compare a used offer with a new room only after matching usable specification, foundations, finish, connection scope and the evidence for condition and cover. A difference between two asking prices is not a demonstrated saving on completed offices. The whole-project cost guide and quote comparison guide help reconcile those scopes.
Include the new power and data connection separately from equipment already fitted inside the room. Ask who inspects/tests the reinstalled services and supplies the appropriate records; an old installation document does not by itself establish the new installation’s condition.
A guarantee mentioned in an old advert is not proof that cover transfers to you or survives a move. Obtain the actual document and written confirmation for this building, owner, new location and proposed method. Malvern’s published ex-display guidance says terms may vary with age, specification and treatment; it does not establish universal transfer rights.
| Record | Written answer / reference |
|---|---|
| Cover identity | Guarantor, exact building, original document, start/expiry and remaining cover: ____ |
| Transfer and new site | Written eligibility, permission/registration/fee, covered owner/location/use: ____ |
| Move and exclusions | Approved people/method, dismantling/transit/reassembly, new base, repairs and maintenance conditions: ____ |
| Damage and remedy | Who holds risk at each handover; insurance limits/excess; reporting deadlines; claim contact and remedy: ____ |
These fields are also in the condition-and-guarantee download. Agree who records and addresses damage during dismantling, loading, transport, unloading and reassembly, and who delivers the completed weatherproof room. Ask what the proposed insurance actually covers, its limits, excess, exclusions and reporting process; “insured move” is not a description of all those responsibilities.
Government guidance on implied rights explains protections for consumer goods and services, including reasonable care and skill for services, and distinguishes business contracts. Do not interpret “sold as seen” or deposit wording as removing statutory rights where they apply. The same trader–consumer rules do not automatically describe every private sale; obtain advice for the actual seller and contract if rights, deposits or cancellation are disputed.
Before committing, bring together the condition evidence, written movement proposal, both-site assessments, reconciled cost scope and guarantee/damage answers. If one remains unresolved, record the dependency rather than treating the package as confirmed. Keep it with your private project brief and the office buying checklist. You decide which seller, mover or adviser receives it.
The four linked sources were checked on 21 November 2026 for their relocation, delivery and guarantee terms. Published seller terms are dated examples only; no stock, saving, site condition, transport price, model-specific movement instructions or guarantee transfer has been independently confirmed. The two original records organise evidence and commissioning questions; they do not provide a condition survey, removal method, engineering decision or legal opinion. Before making an offer, ask the seller to confirm the condition of this building and the removal, delivery and guarantee terms in writing.