USED GARDEN OFFICE: TWO-SITE RELOCATION QUOTATION SHEET Garden Building Guide · primary sources rechecked 21 November 2026 No actual building, movement method, transport quote or site is approved here. If an advert says ‘relocatable’, ask for written confirmation covering this model and the proposed dismantling or lift. Request written manufacturer advice and competent assessment of BOTH locations. Mark each input MEASURED / SELLER-STATED / DOCUMENT-SUPPORTED / ASSUMED / UNKNOWN. BUILDING AND PROPOSAL Manufacturer / exact model / age / alterations / condition-record reference: ____ Written movement advice / proposed method / permitted installer: _______________ Components requiring replacement / evidence and owner: _________________________ Quote issuer / date / validity / version / survey status: _______________________ VAT basis / assumptions / payment stages: ______________________________________ TWO LOCATIONS Address and permission Collection site: Address, contact, owner consent and agreed access date: ____ Receiving site: Address, contact, owner consent and intended use: ____ Ground route Collection site: Narrowest clear width/height, turns, steps, slopes and carry distance: ____ Receiving site: Narrowest clear width/height, turns, steps, slopes and carry distance: ____ Vehicle and work area Collection site: Parking/loading restrictions, working space and protection: ____ Receiving site: Unloading/assembly space, parking restrictions and protection: ____ Possible lifting constraints Collection site: Overhead obstacles/services, nearby property and assessment needed: ____ Receiving site: Overhead obstacles/services, nearby property and assessment needed: ____ Building and base Collection site: Current supports, fixings, disconnection and removal/making-good scope: ____ Receiving site: Model-specific foundation requirements, site assessment and base readiness: ____ Services and permissions Collection site: Who isolates services and records safe disconnection; consents: ____ Receiving site: Power/data/water/drainage scope; relevant planning/building-control questions: ____ Survey and timing Collection site: Surveyor/mover, report/date, access assumptions and removal deadline: ____ Receiving site: Surveyor/installer, report/date, readiness, storage fallback and installation date: ____ ITEMISED COSTS Use INCLUDED in a named offer / PRICED EXTRA / EXCLUDED / UNKNOWN. Included work points back to its package price; do not add it a second time. Unknown price is not zero. Keep buyer allowances separate from supplier prices. For every line, retain amount, VAT basis, reference/date/validity, owner and gaps. Building and included fittings Supplier quotation: Status ____; £____; VAT basis ____; included in offer/line ____ Buyer allowance: £____; VAT basis ____; reason ____ Evidence and owner: Quote/date/validity ____; responsible party ____; exclusion/question ____ Condition survey / move assessment Supplier quotation: Status ____; £____; VAT basis ____; included in offer/line ____ Buyer allowance: £____; VAT basis ____; reason ____ Evidence and owner: Quote/date/validity ____; responsible party ____; exclusion/question ____ Service isolation / disconnection Supplier quotation: Status ____; £____; VAT basis ____; included in offer/line ____ Buyer allowance: £____; VAT basis ____; reason ____ Evidence and owner: Quote/date/validity ____; responsible party ____; exclusion/question ____ Dismantling / packing / replacement parts Supplier quotation: Status ____; £____; VAT basis ____; included in offer/line ____ Buyer allowance: £____; VAT basis ____; reason ____ Evidence and owner: Quote/date/validity ____; responsible party ____; exclusion/question ____ Lifting / loading / protection Supplier quotation: Status ____; £____; VAT basis ____; included in offer/line ____ Buyer allowance: £____; VAT basis ____; reason ____ Evidence and owner: Quote/date/validity ____; responsible party ____; exclusion/question ____ Transport / transit cover / storage Supplier quotation: Status ____; £____; VAT basis ____; included in offer/line ____ Buyer allowance: £____; VAT basis ____; reason ____ Evidence and owner: Quote/date/validity ____; responsible party ____; exclusion/question ____ Destination foundations / site works Supplier quotation: Status ____; £____; VAT basis ____; included in offer/line ____ Buyer allowance: £____; VAT basis ____; reason ____ Evidence and owner: Quote/date/validity ____; responsible party ____; exclusion/question ____ Reassembly / repairs / weatherproofing Supplier quotation: Status ____; £____; VAT basis ____; included in offer/line ____ Buyer allowance: £____; VAT basis ____; reason ____ Evidence and owner: Quote/date/validity ____; responsible party ____; exclusion/question ____ Reconnection / inspection / testing Supplier quotation: Status ____; £____; VAT basis ____; included in offer/line ____ Buyer allowance: £____; VAT basis ____; reason ____ Evidence and owner: Quote/date/validity ____; responsible party ____; exclusion/question ____ Waste / old-site and new-site making good Supplier quotation: Status ____; £____; VAT basis ____; included in offer/line ____ Buyer allowance: £____; VAT basis ____; reason ____ Evidence and owner: Quote/date/validity ____; responsible party ____; exclusion/question ____ THREE SEPARATE RESULTS 1. Quoted subtotal: building offer plus non-duplicated priced extras on a consistent stated VAT basis: £____. Quote references and dates: ________________ 2. Provisional buyer allowances: £____. Basis and items covered: _______________ 3. Remaining unknowns: unpriced/unapproved items, evidence, owner and deadline: __ Planning total if combining 1 and 2: £____. VAT basis: _________________________ It remains provisional where allowances or unknowns remain. Written changes / payment stages / cancellation or failed-move terms / validity: _____________________________________________________________________________ RESPONSIBILITY AND READINESS Safe isolation/disconnection owner and record: ________________________________ Destination base/site readiness evidence: ____________________________________ Reassembly, repairs and weatherproofing owner: ________________________________ Reconnection/inspection/testing owner and handover records: ____________________ Risk at each handover; transit cover/limits/excess; damage reporting: ___________ Removal deadline / installation date / storage fallback: ______________________ Permissions for receiving property, nation and use: ___________________________ COMPARE THE COMPLETED OFFICE Match usable specification, base, finish, service connections, condition evidence and cover before comparing a used offer with new. Asking-price differences do not demonstrate a saving on completed offices. An old service record does not establish the condition of the new installation. Obtain the appropriate new records. Keep unresolved movement, condition, guarantee and price questions visible. Nothing in this worksheet sends a supplier enquiry or guarantees viability. DATED SOURCE EXAMPLES, NOT MARKET NORMS OR ITEM QUOTATIONS Bourne publishes default VAT/dismantling/local-delivery/installation inclusions, with exceptions and an approximate 40-mile Farnham radius. https://www.bournebuildings.co.uk/ex-display Malvern describes delivery/installation within 25 miles of the display location and teams dismantling, transporting and reassembling. https://www.malverngardenbuildings.co.uk/blog/ex-display-garden-building-sale-goes-live/ Green Retreats says moving costs may make relocation unviable; no exact model, method, cost or guarantee transfer is established by that general statement. https://www.greenretreats.co.uk/faqs/ Sources checked 21 November 2026, refreshing the 20 November research.