Follow the rainwater after a storm

Garden room surface drainage

After rain, sketch where water from the roof outlet goes. Mark separately how water runs over the paving and soil. Mark where water collects or disappears from view. Give the sketch and photos to the designer to check the outlet and route.

Sources checked 21 November 2026

A garden-room downpipe beside wet paving and a patch of collected rainwater.

Keep runoff away from the base

Photograph the wall base and threshold from outside and inside, noting when damp appears and what the ground was like after rain. Record surface levels, splash, gutter overflows, staining, nearby pipes and wet spots. Use neutral observations such as “damp strip after storms”. Condensation, leaks, splash and ground moisture call for different evidence. Ask the room supplier how the selected floor, edge and moisture details work with the surrounding level and where inspection and maintenance access must remain. Existing damp needs a diagnosis before remedies are chosen.

For England, see the site-preparation and moisture topics in Approved Document C. Ask for the selected base and threshold details.

Where does the water go after it leaves the roof or paving?

Draw separate arrows for roof outlets and overland flow over paving and soil. Identify where the existing rainwater goes and who owns any drain or proposed outfall. Ask the designer what investigations are needed for collection, infiltration or connection, and whether rainwater from the proposed work can be handled without affecting neighbours or the highway. Keep foul drainage separate from this sketch’s ordinary rainwater scope.

Sketch two visible routes

An unscaled overhead sketch shows a solid arrow from a roof outlet and a dashed path arrow toward ponding, with an unidentified cover separate from both.
Fictional surface-water observation sketch. Open the surface-water sketch
Read the unscaled sketch in words
MarkWhat to record
Solid arrowVisible route from the garden-room roof outlet.
Dashed arrowSurface flow from the paving toward a wet low point.
OvalObserved ponding and its weather and date.
Fine dotted boundaryApproximate property line. Check ownership and access.
Outlined coverVisible cover with type and system to verify.
Open outlet recordDesigner confirms destination and owner, plus any needed permission or agreement.

Check applicability with your designer. For work within the scope of the England national SuDS standards, start with collection for non-potable use, then consider infiltration, a surface water body and a surface-water drainage system. A suitable public combined sewer is last in the hierarchy. Foul-only sewers are excluded from these runoff destinations. Ask for the relevant asset owner’s confirmation and authority agreements for the chosen proposal.

Bristol’s local advice says the council gives no SuDS consultation response for its listed minor applications, including householder sheds and garages. The council may comment on surface-water flood risk and evacuation plans. Confirm the applicable checks with the authority and sewerage undertaker for your address.

Approved Document H addresses rainwater in section H3 and foul drainage in H1. Ask the designer which requirements apply to the building and paved areas.

What to show the drainage designer

Give the designer a dated drainage record

Keep your photographs and estimated levels alongside the verified drainage asset, chosen destination and written decisions once you receive them.

Make a dated record of roof outlets, garden slopes, run-on from other areas, ponding after rain and existing covers. Note boundary and ownership questions, route and access for future clearing, inspection and maintenance. Start from ground level after rain. Photograph the downpipe, visible route, any overflow or ponding and the area around an unidentified cover. Mark unknown outlets for the designer and get advice before changing a destination. Ask a competent person to identify drainage assets, propose the system, confirm ground suitability and obtain any permissions before work. For later checks, keep a record of what you first noticed, what the person assessing the drainage found and the maintenance instructions for the chosen system.

Where does rainwater go now?

Sketch the roof outlets, ground levels and possible discharge point. Ask who will check the route and whether it’s suitable.

Open the private project planner

Sources and checks

The example sketch records observations and an open outlet. The statutory guidance and SuDS standards shown here refer to England, with Bristol’s advice cited for its local scope. The actual designer checks routing, condition, capacity and applicable agreements for the selected site.

  1. England national standards for sustainable drainage systems — Runoff destination order and foul-only exclusion in Standard 1. Checked 21 November 2026.
  2. Bristol SuDS planning advice — Local application scope and flood or evacuation comments. Checked 21 November 2026.
  3. Approved Document C — England site preparation, drainage and moisture context. Checked 21 November 2026.
  4. Approved Document H — England context for rainwater and separate foul and surface systems. Checked 21 November 2026.