Show the designer how the site falls

Garden room groundworks

Mark the slope and the route from the gate on a sketch of your plot. Before anyone fixes the foundation or floor level, agree which measurements the designer needs and what the groundworks price covers.

Sources checked 21 November 2026

A marked garden-room footprint on ground that falls toward the back fence.

Measure slopes and uneven ground

Use one horizontal reference

Put the footprint, house, gate, boundary and proposed threshold on one sketch. Ask the surveyor to note the reference, date, person, units and whether each reading was measured or assumed.

Sketch the proposed footprint and entry. Place its four labelled corners on the drawing and have levels recorded against one clearly identified horizontal reference. Include the date, who measured it and what each observation is measured to. Add the route from the gate, nearby structures and ground toward the boundary. Where ground falls unevenly, ask for extra readings on the approach and alongside the proposed floor and threshold.

In this fictional 4 × 3 m example, A is the highest ground and C is the lowest. A larger reading means the point lies farther below the common reference. Here the highest-to-lowest difference is 0.55 m − 0.20 m = 0.35 m. Agree floor and excavation levels separately after the real survey.

Four points on a 4 by 3 metre fictional rectangle. The northwest point is highest and the southeast point is lowest by 0.35 metres.
Fictional site sketch. Open the level diagram
Fictional example. Distance below the same reference
PointCornerMetres below reference
ANorthwest0.20
BNortheast0.25
CSoutheast0.55
DSouthwest0.50

What does the designer need to know about clay and trees?

Record any evidence of clay or fill, soil or water history, existing walls, nearby foundations, known utilities and trees on or near the plot. Include recently removed trees and, where known, the removal date. Moisture changes associated with vegetation can make some clay soils shrink or swell. Ask the structural or geotechnical designer what investigation is needed and when to involve a tree specialist. Stratford-on-Avon building control’s foundations and trees guidance.

Mark protected trees on the plan. Record who owns each tree if you know, which checks are outstanding and who will follow them up. In England, ask the local planning authority what consent or notice applies to a protected tree or work that may affect its roots. England tree protection guidance.

RADIX’s Scottish lodge case illustrates a named provider using site tests for one set of ground, building and external works. Ask for the investigation and design evidence appropriate to your project.

How will the contractor get spoil off the plot?

What does the groundworker’s quote cover?

Give each bidder the same drawing, measurements and access constraints. Record the actual responsibilities for handling, waste and reinstatement.

Ask the groundworker to explain what they have measured and what the quantity represents. Ask for both the measured volume in place and the loose quantity used to price transport and disposal. A Royal Borough of Kensington and Chelsea excavation study explains how soil can take up more volume after digging and how it varies by material. Ask the groundworker to justify the handling and transport assumptions for this site. Obtain the surveyed load and handling basis, where material can be reused or taken, access for plant, protection needed, restrictions on work and the surfaces they will restore. Compare one proposed site drawing and use open lines for unmeasured scope rather than guessed rates.

Ask who is responsible for the ground and services checks and for planning any intrusive work. HSE excavation guidance for Great Britain.

Carry priced and open items into the quote comparison guide.

Where will the excavated material go?

Mark the working area and route out. Ask who will move the spoil, where it will go and what the price includes.

Open the private project planner

Sources and checks

The diagram and levels are fictional. Use the editable record to request a site survey and written scope. The designer establishes soil conditions, foundation and structural requirements. Tree rules are cited for England and excavation context for Great Britain.

  1. Stratford-on-Avon building control foundations and trees — Effects of vegetation and clay moisture changes, and professional input. Checked 21 November 2026.
  2. England Tree Preservation Orders and conservation areas — Tree and root protection and approvals in England. Checked 21 November 2026.
  3. HSE excavations — Great Britain context for ground conditions, other structures and services. Checked 21 November 2026.
  4. RADIX West Linton lodge case — Provider’s account of bespoke site conditions and testing for a Scottish lodge. Checked 21 November 2026.
  5. Kensington and Chelsea excavation case study, section 4 — UK engineering study explaining why loose spoil volume can differ from excavation measured in place. Checked 21 November 2026.