GARDEN ROOM SURFACE DRAINAGE SURVEY CHECKLIST Project, address and drawing revision: Observer, survey date and photo references: Weather and recent rainfall, including time since rain: OBSERVED OR ESTIMATED Roof outlet, gutters and visible rainwater route: Paving, soil and outside water flowing onto the site: Where does water collect, how long does it stay, and where can you see splash or overflow? Runoff leaving the site and observed effects on neighbours or the highway: Inside and outside symptom, position and when it appears: Observed external levels, approximate datum and boundary: Visible covers, labels and surrounding photos from ground level: Unknown route, outlet or owner: Maintenance access visible from above ground: DESIGNER OR ASSET OWNER TO VERIFY Measured levels and ground evidence: Which cover, pipe, outfall or asset is present and who owns it: Roof, surface and foul water routes where relevant: Professional assessment of the symptom and selected base/threshold detail: Suitability of proposed destination and capacity/sign-off: Possible effects of runoff on neighbours or the highway and design assessment: Approving authority, undertaker and other owner contacts: Approval, consent, agreement and verified evidence reference/date: Route and access for inspection, maintenance and cleaning: Unresolved decision, evidence requested and named owner: