Fit-out and connections

Power and broadband

A quote can include sockets and lights while leaving the supply from the house unpriced. Ask who will connect the room and who will provide broadband, then get a price for each part.

Sources checked 20 November 2026

A model house and separate garden office linked by a dashed route with a marked endpoint at each building.

At a glance

Three things an electrical pack cannot tell you.

Is the house connection included?

Check the selected quotation. Internal wiring and sockets can be included while the surveyed house connection remains a separate job.

Split the complete scope

Will it run my equipment?

List devices used together, including heating and any water equipment. Socket count is not a supply-capacity calculation.

Write the equipment brief

Will video calls work?

Specify the desk outcome, router-to-room route, equipment and finished-building test. A data socket alone is not a broadband service.

Agree the data handover

Separate the room’s electrical fit-out from its final connections.

The same checks apply to a small pod, prefab office or larger garden studio. An insulated room with an electrical pack still needs a confirmed supply, connection scope and handover. The electrical compliance notes here apply to England.

Give every work package a written specification and named owner
Work packageSpecify in the quoteAsk who is responsible
Internal fittingsSocket/light positions, switches, heater, controls, internal wiring and data outlets.Who supplies and installs the selected fit-out, and what remains optional?
House supply survey and designExisting supply assessment, proposed equipment, agreed connection point and site-specific design.Who assesses capacity, designs the connection and confirms any necessary house-side work?
Final power connectionComplete connection, installer-designed protection and coordination with the room’s installation.Who connects each end and accepts responsibility at the handover between trades?
Groundworks and making goodService checks, route preparation, excavation where required and restoration of surfaces.Who agrees the design before work starts, carries it out and reinstates the garden?
Data equipment and configurationRoute from the actual router, equipment at both ends, desk connection and Wi-Fi provision.Who supplies, configures and tests the network?
Notification and electrical recordsApplicable notification route, inspection/test documents and compliance record.Who arranges each process and provides its documents?
Whole-system handover and aftercareAgreed equipment demonstration, network test, instructions and outstanding-item process.Who resolves a problem spanning the building, connection and data equipment?

Oeco’s installation process separates internal electrical work and subsequent electrician testing from the house connection, which can be separately quoted or arranged with your electrician. The Green Retreats quick-quote FAQ also excludes the electrical connection from its building quote and describes a survey for its price.

These are named supplier examples checked on 20 November 2026, not universal package definitions. Confirm the exact model and selected specification. Insulation, a heater and an electrical pack are separate attributes; none establishes the house supply capacity or a completed connection.

England: agree the compliance route before work starts

Approved Document P covers domestic outbuildings sharing a dwelling’s electricity. A small building’s general exemption does not remove those Part P requirements. Installing a new circuit is notifiable work.

The document’s certification section describes registered self-certification, registered third-party certification and building-control routes. Ask the installer to confirm the applicable route before work begins. Electrical inspection/test documents and the building-regulations compliance record are distinct deliverables; a vague promise of certification leaves the scope unclear.

The government’s competent-person guidance links to the Electrical Competent Person Register. If using that route, check the business and relevant scope. Scheme membership is not the only route or a guarantee of workmanship. Confirm requirements separately for Scotland, Wales or Northern Ireland rather than applying these England notes throughout the UK.

Describe the working day, not a cable specification.

The installer needs to know what will run together, for how long and where. Leave cable selection, protection, earthing, installation method and any consumer-unit changes to the competent designer assessing the actual site.

Power for computers, heating and everyday equipment

List computers, monitors, docking stations, network equipment, printers and lighting, then add heating, cooling, exercise equipment and any other planned loads. Record quantities, model/rating information if known, likely simultaneous use and working hours. A row of sockets is not evidence that all intended equipment can run together.

Include future changes before design: a second desk, a different heater or a water heater may alter the brief. Mark unselected equipment as unresolved and ask what information the installer needs. The worksheet records requirements; it does not calculate electrical demand.

A garden office with electricity and water

Tell the electrical and plumbing trades about any sink, WC, hot-water equipment, pump or other proposed service. Ask them to coordinate routes, entry points, access and sequence before groundworks begin. Water, drainage and any provider notification need their own assessment; an electrical quote does not establish plumbing feasibility.

Use the toilet and services guide for those questions. Do not assume that power, data and water can share one unplanned trench, or that one trade’s allowance pays for another’s connection.

What are the electricity supply options?

For a proposed mains connection, commission a survey of the existing supply and the route to the room. If considering an alternative supply, ask for an assessment of the actual loads, hours, reliability needs, storage and winter generation where relevant. An extension lead or an uncalculated solar kit does not establish a suitable permanent electrical installation.

Compare a complete designed arrangement and its operating assumptions. This guide supplies no universal cable size, trench depth, protective-device selection or alternative-system capacity.

Reusable power and data brief

Download services worksheet (text)

Project / selected room: ____; brief version / date: ____; supplier / installer contacts: ____; quotation reference: ____. Complete the fields below in print or edit the matching text file in your own document.

Record your requirements; site-specific design values remain with the installer
Brief fieldYour requirement / unanswered question
Use, people and working hours____
Devices used togetherDevice/model, quantity, known rating and simultaneous use: ____
Internal fittings and positionsSockets, lights, heating, controls and data outlets: ____
Water and future equipmentProposed services, equipment and unresolved trade questions: ____
Power, router and desk locationsSupply point to confirm; actual router and proposed desk positions: ____
Route, surfaces and accessSketch reference, approximate distances, obstacles and finish requirements: ____
Data workload and testDevices, simultaneous activities, wired/Wi-Fi needs and agreed test: ____

Repeat this record for each work package in the first section: agreed scope: ____; responsible party: ____; status (included / priced extra / excluded / unknown): ____; amount / VAT basis: ____; evidence reference/date: ____; outstanding action / owner / due date: ____. Keep unpriced work unknown rather than entering £0.

Keep the scope sheet alongside the private project brief. The planner records your requirements and questions; it does not design a circuit, price a connection or send details to a supplier.

Compare the complete routes before pricing the connection.

Put the power supply point, room connection point and router on the site sketch as separate locations. Have the relevant installers coordinate the proposal before excavation, landscaping or building assembly makes changes harder.

Two fictional power routes with the same endpoints

For this comparison, both routes start at the same agreed electrical supply point and finish at the same connection point in the room. Route A is 18m: 14m across lawn plus 4m through paving. Route B is 29m around the perimeter. These are invented route assumptions, not survey results, cable purchase lengths or electrical designs.

Fictional power route comparison between the same endpoints: Route A is 18 metres, including 14 metres of lawn and 4 metres of paving; Route B is 29 metres around the perimeter. Feasibility and costs are unknown.
Original schematic, not to scale. A: 14m lawn + 4m paving = 18m. B: 29m perimeter. Difference: 29 − 18 = 11m. Both connect the same assumed power supply and room points. Neither route is approved or priced; these are not cable order lengths. Data needs a separate route assessment from the actual router to the desk. Open full-size diagram
Distance alone cannot select the suitable or cheaper route
QuestionRoute A: 18mRoute B: 29m
Surface and route assumptions14m lawn and 4m paving.Longer perimeter route; entries and obstacles need assessment.
Groundworks to priceService checks, any required excavation, lifting/relaying paving and lawn reinstatement.Route suitability, any excavation or supports, vegetation clearance and making good.
Electrical decisionInstaller assesses supply, route and complete design.Installer assesses the longer run and complete design.
Data coordinationCheck the actual router-to-desk route separately.Check data entry points and route separately.
Feasibility and costUnknown until assessed and quoted.Unknown until assessed and quoted.

B is 11m longer, but A involves paving work. That does not establish which costs less. A perimeter route is not automatically acceptable either. Ask the electrician to confirm feasibility and agree the design before buying cable or commissioning excavation; this illustration gives no digging depth or installation method.

For each route on your own site record: agreed power endpoints: ____; sketch reference / approximate length: ____; surfaces and obstacles: ____; service checks, groundworks and making good: ____; feasibility decision / designer / date: ____; quoted scope / price / VAT / reference: ____; unknowns / owner / next action: ____.

Define what internet included must deliver

A useful example brief is two simultaneous video calls, a wired desk device and Wi-Fi for a phone. Replace that example with your actual workload, including any employer network requirements. Ask for equipment, configuration, installation and a finished-building test, not just a data socket.

A wired network connection feeding an access point in the room and a device repeating the house’s wireless signal are different approaches. TP-Link’s access-point documentation explains those modes and notes that materials, obstacles, network conditions and client devices affect actual throughput and coverage. It illustrates the technology, not a recommendation of that model, outdoor suitability or guaranteed performance.

Ask the network installer to assess a wired option while groundworks are being planned. If considering wireless, test the proposed location and agree a repeat test in the finished room using the actual work devices. Record the workload, result and who resolves a shortfall. A successful test in an open garden does not establish the finished room’s connection.

The electrical and data designers should coordinate routing, suitable protection, entries and any required separation. The data path begins at the router or agreed network connection, which may be elsewhere in the house than the power supply point. Do not copy the 18m or 29m power distance into a data-cable order.

Keep the handover records distinct

Ask who supplies each record, what it covers and when
RecordResponsible person / reference / date
Electrical inspection and test documentsInternal installation and final connection scope: ____
Building-regulations compliance recordApplicable route, covered work and document: ____
Data setup and agreed test resultEquipment, devices, workload and outcome: ____
Instructions, aftercare and open itemsControls, contacts, unresolved work and due dates: ____

Confirm that responsibilities join up where different trades meet. Record the accepted brief and drawing versions, changes, outstanding work and who checks completion. Keep electrical and building-regulations documents together without treating them as the same document.

Use the quote worksheet to reconcile connections and reinstatement with the building price. Coordinate excavation with the foundation survey and equipment movement with the access plan. The cost guide shows why a room’s advertised price cannot establish every site cost.

Sources and checks

Garden Building Guide checked the linked primary sources on 20 November 2026. The electrical compliance discussion is limited to England; obtain the applicable route for the actual property and work. This is a commissioning brief, not electrical, network or plumbing design. The 18m and 29m routes and example data workload are invented planning illustrations, not surveys, cable schedules, quotations or performance tests. Supplier statements require confirmation for the selected model. No installer was contacted and no professional approval or installation test is claimed.

  1. GOV.UK: Electrical safety, Approved Document P — The current official England document and its scope covering domestic electrical safety. Checked 20 November 2026.
  2. Approved Document P: 2013 England guidance PDF — Domestic outbuildings sharing a dwelling supply, new-circuit notification, certification routes and distinct inspection/test and building-regulations records. No installation dimensions or equipment selections are inferred. Checked 20 November 2026.
  3. GOV.UK: competent-person schemes — Registered self-certification and the link to the Electrical Competent Person Register; confirm the relevant work scope. Checked 20 November 2026.
  4. Oeco: ordering and installation — Internal electrical installation/testing and the separate final house connection, subject to the selected quotation. Checked 20 November 2026.
  5. Green Retreats: quick-quote FAQ — House electrical connection excluded from the building quotation and assessed separately through a survey. Checked 20 November 2026.
  6. TP-Link: access-point and extender modes — Difference between a wired network feeding Wi-Fi and repetition of a wireless signal, plus limits on throughput and coverage. Technology illustration only. Checked 20 November 2026.