GARDEN ROOM POWER AND DATA WORKSHEET Garden Building Guide | Worksheet version: 20 November 2026 Companion guide: Garden room electricity and broadband: connect the whole job. Fill this in on your device or print a copy to mark up. Keep it alongside the original quotations, route sketches and installer records. You choose who receives it. It is a requirements brief, not a circuit, cable, trench, network or plumbing design. Site-specific design values remain with the responsible competent installer/designer. 1. PROJECT RECORD Project / selected room: ______________________________ Brief version / date: ______________________________ Supplier / installer contacts: ______________________________ Quotation reference: ______________________________ 2. ACTIVITIES, DEVICES AND SERVICES Use, people and working hours: ______________________________ Devices used together (device/model, quantity, known rating, simultaneous use): ________________________________________________________________________ Include computers, monitors, docking/network equipment, printers, lighting, heating, cooling, exercise equipment and other proposed loads as relevant. Socket count is not a supply-capacity calculation. Internal fittings and positions (sockets, lights, heating, controls, data): ________________________________________________________________________ Water and future equipment (services, equipment, unresolved trade questions): ________________________________________________________________________ Include any proposed water heater, pump or later changes. Water/drainage and provider notification need their own assessment. Coordinate trades before works. Power, router and desk locations: Supply point to confirm: ______________________________ Actual router location: ______________________________ Proposed desk / data outlet positions: ______________________________ Route, surfaces and access: Sketch reference / date: ______________________________ Approximate distances / surfaces / obstacles: _____________________________ Finish and reinstatement requirements: ______________________________ Data workload and test: Actual devices / simultaneous activities: ______________________________ Wired desk / Wi-Fi needs: ______________________________ Employer network requirements, if relevant: ______________________________ Agreed finished-building test / responsible person: _______________________ The guide's two simultaneous calls and wired desk device are an example only. No internet speed or performance is guaranteed by this blank brief. If considering an alternative electricity supply, ask for a separate assessment of actual loads, hours, reliability, storage and winter generation where relevant. An extension lead or uncalculated solar kit does not establish a suitable permanent electrical installation. This worksheet specifies no cable, protection, earthing, consumer-unit changes or trench depth. 3. CONNECTION-SCOPE RECORDS Use Included, Priced extra, Excluded or Unknown. Unknown is not £0. Record amount and VAT basis consistently. Do not count included work twice. LINE: Internal fittings Agreed scope (sockets, lights, controls, heat, wiring, data outlets): ________ Responsible party: ______________________________ Status / amount / VAT basis: ______________________________ Evidence reference/date: ______________________________ Outstanding action / owner / due date: ______________________________ LINE: House supply survey and design Agreed scope (capacity, proposed loads, connection point, required work): ___ Responsible party: ______________________________ Status / amount / VAT basis: ______________________________ Evidence reference/date: ______________________________ Outstanding action / owner / due date: ______________________________ LINE: Final power connection Agreed scope (complete connection, design, protection, trade handover): _____ Responsible party: ______________________________ Status / amount / VAT basis: ______________________________ Evidence reference/date: ______________________________ Outstanding action / owner / due date: ______________________________ LINE: Groundworks and making good Agreed scope (service checks, preparation, excavation, reinstatement): _____ Responsible party: ______________________________ Status / amount / VAT basis: ______________________________ Evidence reference/date: ______________________________ Outstanding action / owner / due date: ______________________________ LINE: Data equipment and configuration Agreed scope (router-to-desk route, equipment, setup, wired/Wi-Fi): _________ Responsible party: ______________________________ Status / amount / VAT basis: ______________________________ Evidence reference/date: ______________________________ Outstanding action / owner / due date: ______________________________ LINE: Notification and electrical records Agreed scope (applicable route, inspection/test, compliance documents): ____ Responsible party: ______________________________ Status / amount / VAT basis: ______________________________ Evidence reference/date: ______________________________ Outstanding action / owner / due date: ______________________________ LINE: Whole-system handover and aftercare Agreed scope (demonstration, network test, instructions, outstanding items): __ Responsible party: ______________________________ Status / amount / VAT basis: ______________________________ Evidence reference/date: ______________________________ Outstanding action / owner / due date: ______________________________ Internal fit-out does not prove a final house connection is included. Keep written handover points between the room supplier and other trades. 4. ROUTE COMPARISON FOR YOUR SITE Use actual installer-assessed alternatives; these fields contain no lengths. Both power options must identify the agreed start and end points. Power supply point / room connection point: ______________________________ Power route A Sketch reference / approximate route length: _____________________________ Surfaces and obstacles: ______________________________ Service checks / required groundworks / making good: ______________________ Feasibility decision / designer / date: ______________________________ Quoted scope / price / VAT / reference: ______________________________ Unknowns / owner / next action: ______________________________ Power route B Sketch reference / approximate route length: _____________________________ Surfaces and obstacles: ______________________________ Service checks / required groundworks / making good: ______________________ Feasibility decision / designer / date: ______________________________ Quoted scope / price / VAT / reference: ______________________________ Unknowns / owner / next action: ______________________________ Data route: actual router/network connection to desk and equipment locations: ________________________________________________________________________ Coordination, entries, suitable protection and separation to be confirmed by the responsible designers: ______________________________ The guide's fictional A=18m (14m lawn+4m paving) and B=29m perimeter have the same power endpoints; B is 11m longer. They are not survey results or cable order lengths. Neither route is approved or priced. The data route requires its own router-to-desk assessment. Do not buy cable or commission excavation from the example; shorter distance does not establish lower total cost. 5. HANDOVER RECORDS For each record identify the responsible person, reference, scope and date. Electrical inspection and test documents Internal installation and final connection scope: ________________________ Responsible person / reference / date: ______________________________ Building-regulations compliance record Applicable route, covered work and document: ______________________________ Responsible person / reference / date: ______________________________ Data setup and agreed test result Equipment, devices, workload and outcome: ______________________________ Responsible person / reference / date: ______________________________ Instructions, aftercare and open items Controls, contacts, unresolved work and due dates: ________________________ Responsible person / reference / date: ______________________________ Accepted brief and drawing versions: ______________________________ Changes / outstanding work / person checking completion: __________________ Electrical inspection/test documents and building-regulations records are distinct. Confirm the applicable notification/certification route before work. The companion guide's Part P discussion applies to England; confirm the relevant requirements separately for the actual location. Keep both sets of records. The Garden Building Guide planner records a private requirements brief. It does not design a circuit, price a connection or send details to a supplier.