Price the full support and finish

Concrete bases for garden rooms

Ask for the base drawing for your chosen room before requesting a price for the concrete work. It should tell the contractor which levels to work to, how to finish the edges and who signs off the work.

Sources checked 21 November 2026

The edge of a garden-room base beside the threshold and unfinished garden surface.

Read the base specification

A continuous slab, designed pads or blocks and a designed screw-and-frame system are possible arrangements. Ask what support the room accepts, how loads reach it and who designs it for the surveyed ground. Ask for the same ground and installed evidence if the room can use a selected system without a slab. Garden Affairs describes a slab, Oeco describes a pad-and-frame system, and RADIX shows a screw-and-frame arrangement for a Scottish lodge. Use the selected system’s own design and evidence.

Keep three measures separate. Record excavation to the formation, slab thickness between its top and underside, and the finished floor with its threshold. Before the builder prices the work, ask the designer to specify the footprint, materials and tolerances, and how to tell when the base is ready for the room.

What the base drawing should record

An unmeasured plan shows the support outline and service entry. The section separates formation, slab faces, finished floor, threshold and outside ground.
Example record — values by designer. Read the fields below for the scope behind the numbers in the drawing. Open the specification diagram
Read the numbered fields on the example record
Number and fieldWhat goes in the actual design record
01–03. Scope, revision and surveySelected room, drawing and revision. Enter bearing and ground evidence and who accepts it.
04. Support outlinePlan, designed footprint and the room support interface.
05. Excavated formationDepth from the agreed survey level to the excavated formation. Record sub-base separately.
06. Slab thicknessMeasure between the designed top and underside of the slab.
07. Finished floor datumAgree the finished level after the room floor build-up.
08. ReinforcementLink the designer’s reinforcement detail if specified.
09. Moisture and thermal junctionLink the moisture and insulation continuity detail.
10. Threshold and external levelTie the doorway and surrounding levels to the same datum.
11. Service entryIdentify entry location, interface, sealing and trade owner.
12. Signed acceptanceConfirm the inspection, release, signed drawing or as-installed record and date.

Price the complete concrete base

Price the base from the designer’s record

For each item, write down who will price it and which inspection must take place before the next stage can start.

Price survey, clearance, route protection and reinstatement as well as excavation, spoil, sub-base, formwork, any specified reinforcement, material delivery, placing access, labour and finish. Ask about pump or handling charges, curing and protection, inspection and remedy for deviations. Get the installed scope in writing.

Agree who assesses ground and buried services before work starts. See HSE excavation guidance for Great Britain.

Compare the priced work and pending items in the quote comparison.

How will the base meet the floor and keep out damp?

Ask the room supplier and base designer to align the footprint, moisture protection, edge details, insulation continuity, threshold and finished external levels. Establish how surface water moves away from the building, where services enter and which trade protects the junctions during installation. Check the required readiness and inspection evidence before the room is delivered. Ask what time and conditions are required by the selected concrete/detail.

Garden Affairs’ base guide asks for a footprint match. Hully’s model guidance describes a positive margin and a level concrete base for its glass-fronted models. Ask the chosen supplier and designer to approve the actual outline, edge and moisture details in writing.

For England, use Approved Document A for structural context and Approved Document C for site preparation and resistance to moisture where applicable.

What does the base contractor need from the room supplier?

Ask for the required finished level, support details and damp protection. Put both contractors’ responsibilities on the same drawing.

Open the private project planner

Sources and checks

The plan and section show fields to put into a quote request. The designers for the ground, foundation and room determine the levels, geometry, materials and inspection requirements for the selected project.

  1. Garden Affairs base guide — Supplier-specific footprint request. Checked 21 November 2026.
  2. Hully delivery and bases — Supplier-specific base margin and glazing-model requirements. Checked 21 November 2026.
  3. England Approved Document A — Structural loads and foundations in England. Checked 21 November 2026.
  4. England Approved Document C — Site preparation and protection from contaminants and moisture in England. Checked 21 November 2026.
  5. HSE excavation guidance — Great Britain context for ground, existing services and structures. Checked 21 November 2026.
  6. Oeco garden-office base description — Example of concrete pads and steel supports below a timber-framed room. Checked 21 November 2026.
  7. RADIX West Linton lodge — Provider’s example of an engineered screw-and-subframe arrangement. Checked 21 November 2026.