DELIVERY AND INSTALLATION
Find out where the kit handover ends.
Does the lorry bring a complete pod, a stack of panels or a kit for you to assemble? Find out who gets it from the vehicle to the base and what work is left before you can use it.

Identify what is actually supplied
Ask the supplier to describe exactly what comes off the delivery vehicle. An assembled pod may bring a finished envelope. Panelised systems need assembly and weatherproofing at the plot. A flat-pack kit can be either a shell or a more complete insulated package. Ask for the largest piece, handling method, door dimensions after finishes and clear access past pinch points and turns.
Start with what the offer actually contains. U-Roof Bespoke 066 lists a light-gauge galvanised steel frame. Insulated Panel Store’s Medio kit is an insulated panel shell with its own design. Check the full floor, wall, roof, glazing and ventilation package for year-round work.
For the cost of an insulated flat-pack office, fill the dated system and inclusion matrix in the next section. Start at the kit price and add the base, door, handling, connections and fit-out needed to reach the same completed room.
Delivery can stop next to the vehicle. Confirm who unloads, who moves the room to its final base and who closes the shell and commissions services. Use the system and inclusion matrix to assign each stage to a named party.
Which work is included after delivery?
Compare factory work, base, transport, unloading, final placement, envelope, glazing, wiring, commissioning, waste and VAT. Hully’s delivery guide distinguishes crane-assisted delivery from owner-arranged onward placement for specified heavier pods. Check access and responsibility for the actual configuration.
For a supplied-and-installed quote, get a named party and an acceptance point at four handoffs. Record where the carrier unloads, who moves the room onto the base, who assembles or closes the envelope, and who connects, tests and commissions the finished room. Have the supplier mark each handoff in writing and assign any owner-arranged work to a contractor before comparing totals.
On 21 November 2026 Midbrook’s 4.4 × 3.3 m Medio listing showed £9,150 including VAT for the shell. Insulated roof, wall and floor panels, flashings and fixings were listed. A door and base are separate. Confirm delivery, site preparation and a measured finished doorway before comparing installed costs.
- Unloading. Name the carrier’s stopping point and what it sets down there.
- Final placement. Name the party that moves the load to the prepared base.
- Assembly and closure. Name who makes the room weatherproof and lockable.
- Commissioning. Name who connects, tests and hands over the services.
System and inclusion matrix
Use an actual dated quote for each row. Add the excluded work before comparing totals.
Download the system and inclusion worksheet
| Delivery form | Who unloads and places | Base and closure | Glazing and services | Price, VAT and warranty |
|---|---|---|---|---|
| Assembled pod | Name unloaded position and final placement owner | Confirm base, weatherproofing and lock | Confirm fittings, connections and testing | Enter dated quote and warranty scope |
| Panelised shell | Confirm handling and unloading party | Name base designer and assembly or closure owner | Confirm openings and handover | Enter dated quote and warranty scope |
| Flat-pack insulated kit | Confirm parts, weights and storage | Confirm base, crew, sealing and lock | Check door supply and commissioned services | Enter dated kit and completed costs |
| Installed and commissioned room | Get explicit handoff for unloading and placement | Agree completion condition and base responsibilities | Require connection and test responsibilities | Enter dated installed total, VAT and warranty |
Ask about durability and relocation
Ask whether the design can be moved in one piece or dismantled and relocated. Require an assessment of its condition, the intended handling points, safe transport and service isolation. At the destination ask who designs the new base, reconnects services and checks relevant permissions.
Midbrook’s Medio listing describes its panels as suitable for disassembly and reuse. Check whether your complete room can be moved, what can be recovered without damage, who handles the approved lift or disassembly and how services will be isolated and reconnected. Confirm what the warranty covers after the move.
Supplier questions
For each stage, ask who hands the work over, who accepts it and what written record you’ll get.
Download the supplier questions sheet
| Field | Your record |
|---|---|
| Site address and vehicle stopping point | — |
| Largest piece, dimensions and mass | — |
| Route width, turns and overhead obstructions | — |
| Route survey and responsibility for final placement | — |
| Base and other owner-arranged works | — |
| Relocation, service isolation and reinstatement | — |
| Warranty after relocation | — |
Related guides
Sources and checks
Named listings are dated supplier evidence. Compare quotes at the same weatherproof, fitted and commissioned finish. Ask for a site-specific access and lifting assessment.
- Midbrook: Medio supply-only shell offer — Medio supply-only shell offer Checked 21 November 2026.
- Insulated Panel Store: Medio kit and frame distinction — Medio kit and frame distinction Checked 21 November 2026.
- Hully: separate flat-pack and assembled delivery scopes — separate flat-pack and assembled delivery scopes Checked 21 November 2026.
- U-Roof Bespoke 066: steel-frame panel specification — steel-frame panel specification Checked 21 November 2026.
- Pent Haus: kit instructions and optional packages — kit instructions and optional packages Checked 21 November 2026.