Price the connections
Garden room toilet costs
A price for a WC and basin may leave you to pay for the water and foul-drain connections. Ask for separate prices for the fittings and both routes, and find out who will arrange any unpriced work.

What the toilet price includes
Check whether the price provides a usable WC and basin, a bare compartment, or fittings with pipe ends left ready for another trade. Ask for separate lines and owners for power and data from the house, the clean-water feed and the foul connection. Ask for the enclosure, door, finishes, sanitaryware and lighting to be itemised. Check the ventilation, cold and hot water, and any electrical work for a water heater, extractor or pump. Outside, ask where the clean water comes from, where foul water goes, what is being dug up and who puts it back. For an existing office, ask separately about opening and repairing finished walls or floor, getting services through the structure and protecting the existing warranty.
A listed toilet or bathroom upgrade can be useful for comparing one supplier’s packages. It is the price of the stated upgrade. Keep the building, survey and connections visible until the supplier confirms those lines in writing.
For whether the room is feasible in the first place, use the garden office WC guide.
Eden’s general specification describes a power and data connection, while its guide-price note excludes groundworks and service connections. Ask for a named owner and written inclusion or price for house-to-room power/data, clean water and foul work separately. Eden’s WC guide
Two service-route examples
One supplier, Luxury Garden Buildings, separately lists a £900 plumbing pack, a £550 WC-and-sink combination, £200 per metre for the drainage run to the nearest manhole, and £50 per metre for the water supply run. These are the supplier’s published upgrade prices including VAT and fitting, checked 21 November 2026. The supplier confirms the final price after a site visit. The examples apply those published rates to invented route lengths. Luxury Garden Buildings upgrade schedule, checked 21 November 2026
Compare the listed subtotals
- Short routes
- £2,950
- Longer routes
- £7,150
- Difference
- £4,200
Only the four listed upgrade lines are priced. Both examples include VAT and use the same published rates.
| Route assumption | Price lines and open items |
|---|---|
| A. Water 6 m and foul 6 m | Plumbing pack £900, WC and basin £550, water £300 and foul £1,200. Priced subtotal £2,950 including VAT. |
| B. Water 18 m and foul 24 m | Plumbing pack £900, WC and basin £550, water £900 and foul £4,800. Priced subtotal £7,150 including VAT. |
| Unpriced work in both cases | Confirm the building, enclosure, finishes, hot water, pump, special groundwork, reinstatement, testing and applicable fees after survey. |
The £2,950 and £7,150 figures are pre-survey subtotals of the four published upgrade lines applied to these invented lengths. Luxury Garden Buildings upgrade schedule, checked 21 November 2026
Neither route establishes that the nearest manhole is suitable, that the necessary falls are available, or that separate tariffs cover the same stretch of trench without overlap. The difference of £4,200 illustrates the effect of the two lengths on this supplier’s rates. Ask the surveyor to measure the actual water and foul routes independently. If the foul outlet is lower than an available gravity connection, obtain a separate design and price for a suitable alternative and its running and maintenance costs. Give the supplier photos of surfaces and obstacles while keeping the measurement and connection decision with the surveyor.
WC versus shower or kitchenette
A WC with a basin needs suitable supply, drainage, finishes and ventilation. A shower changes hot-water demand, moisture, floor details and electrical coordination. A kitchenette adds an appliance schedule and may need different ventilation, worktop, storage and hot-water capacity. Ask what is already included in a combined package before adding separate fixture prices. Discuss the intended use if the room will also serve for sleeping or independent living.
What to ask each bidder to price
Send every bidder the same list of fittings and the same site sketch. Ask them to mark each line as a fixed price, an allowance, separately contracted or unresolved. An allowance should show the assumed quantity and what can change the price. Record VAT status on every line, and retain an unpriced line until a bidder has named the owner and decision date.
| Line to price | Confirm in writing |
|---|---|
| Building and finished enclosure | Base, partition, door, floor/wall finishes, openings and service entries |
| Fittings and internal plumbing | Fixture model, connections, hot water and access to maintain it |
| Water route | Start/end, surveyed length, ground assumptions and testing |
| Foul route | Verified destination, survey, gravity or designed alternative, inspection/access responsibility |
| Mechanical and electrical | Ventilation, any heater or pump, electrical design and handover evidence |
| Groundworks | Identify which routes are included, who digs and disposes of spoil, and exactly which paving, planting or other surfaces will be reinstated |
| Fees, testing and handover | Approval responsibilities, certificates, commissioning, manuals and warranty boundary |
Add each priced item once. Below the subtotal, list the work still to be priced. Check both bidders have allowed for the same jobs before comparing their totals.
Related guides
Sources and checks
One supplier’s dated published upgrade rates supply the arithmetic. Both lengths are invented. Unpriced work stays visible, and the supplier and project team must confirm the site-specific scope, VAT, connection and approval responsibilities.
- Luxury Garden Buildings upgrade schedule — Published VAT-and-fitting-inclusive pack, WC/basin and metre rates, with site visit confirmation. Checked 21 November 2026.
- Eden’s garden room with toilet guide — The published specification and guide-price exclusion need written scope reconciliation. Checked 21 November 2026.
- Approved Document G — England sanitation, hot water safety and water efficiency guidance for the designer to scope. Checked 21 November 2026.
- Approved Document H — England drainage guidance for the design and connection team. Checked 21 November 2026.