Specify only what you use

Garden office kitchenettes

Choose a dry tea point, plumbed sink or cooking kitchenette. Record the fittings, working space and services you’ll ask trades to confirm.

Sources checked 21 November 2026

A compact sink and refreshment counter across a clear floor area from a writing desk.

Tea point, sink or kitchenette

A dry tea point needs a place for water, cups and cleaning. Adding a sink changes the service brief.

A water jug, cups and unplugged kettle on a short counter without a sink.
Compare four scopes and who confirms them
Intended activityWhat the brief should includeFirst question to resolveWho confirms?
Dry tea pointShelf or worktop, kettle or drinks machine, safe route with drinking water from the house and a plan for cups and cleaningWhere are hot drinks prepared and carried, and where are used items taken?User and electrician confirm water from the house, appliance load, steam and a safe cleaning routine.
Sink and refreshmentsSink and tap, serviceable trap, handwashing or drinking-water needs, cold storage if wanted, cupboard and cleaning spaceWhich connections and hot-water provision does the plumber need to specify?Room supplier and plumber confirm supply, hot water, drain, trap and service access. Ask about fridge power if specified.
Cooking kitchenetteExact cooking and storage appliances, preparation area, ventilation or extract and use of the roomWhat power, heat, ventilation and clearances are needed for the selected appliances?Room designer and electrician confirm electrical load, air and heat. Plumber confirms water and waste where used.
Utility or laundryAppliance door, safe loading, water, drainage and electrical requirements, containment/drying and access to the connectionsCan you use or maintain the equipment without blocking the room or its exit?Appliance installer and trades confirm supply, waste, drying, loading and maintenance envelopes and safe approach.

A WC and kitchenette can serve a day-use office. Draw food preparation, handwashing and the WC together so the designer can check their separation and the relevant requirements for the actual use. If a bathroom and kitchen accompany overnight stays or independent living, describe who will stay and how the room will be occupied. If a garden room also serves clients, include their access and what food, drink or other services they receive.

For England’s regulatory guidance, agree the applicable requirements with the designer. Approved Document G and householder planning guidance.

Worktop and storage

On the finished plan, sketch the unit body, open doors and drawers, someone working at the counter and the access needed to clean or reach services. Mark the units on the floor with tape beside a chair in its normal position. Include the door from the garden and any pass behind the seated user. Check wall structure, fixing locations and service space from the actual unit instructions.

As a size example, the IKEA SUNNERSTA mini-kitchen combination 791.396.88 has a published 112 × 56 cm width and depth envelope and an overall height of 139 cm. The 0.6272 m² rectangle covers the unit body. Measure the occupied work zone separately, allowing for doors, appliances, service access and a person standing at the unit. Check the actual worktop height, overhead space and fixing instructions. IKEA SUNNERSTA specification, checked 21 November 2026

Record the item and its working space

Use one row per item. Keep the listed body, space needed to operate and maintain it, and the supplier’s connected scope separate.

Example entry · IKEA SUNNERSTA combination 791.396.88

Listed 112 × 56 × 139 cm overall. The body occupies a rectangle of 0.6272 m². Ask the supplier or trades to verify finished worktop height, wall fixing, standing and working space, trap access and the connected supply and waste. The figure is the product body only.

Water, drainage, power and ventilation

Record each exact model and rating where established. Tell the electrician which items may be used at once, and give the plumber addresses for the water supply and foul connection to confirm, including supply suitability, hot water and shutdown in cold weather. Ask where a shut-off can be reached after the cupboard is fitted and how ventilation will handle heat, steam or odours. Agree which trade makes and seals each penetration and who reinstates finishes. For example, Green Retreats says the buyer arranges a plumber, and requests plumbing after the building is finished, with pipework through the walls. Record the selected supplier’s written entry and sequencing requirements before placing the unit. Green Retreats plumbing FAQ, checked 21 November 2026

What will it cost to fit the kitchenette?

Separate the purchased unit or cabinetry and appliances from delivery, assembly, supporting substrate and fixings. Add plumbing materials, ventilation, wiring, external service routes, approvals if applicable, testing, making good and the handover. A product combination may supply a sink and hardware, with the fitted and connected scope priced by others. Keep uncertain lines visible. Ask for a lead trade to check conflicts between the room dimensions, fixings and service entry before work starts.

Use the quote comparison guide to confirm what is included before adding the prices.

What would it cost to fit the kitchenette?

List the sink and appliances you want. Ask who will price the water, waste and power connections as well as the cabinets.

Open the private project planner

Sources and checks

The product listing gives the size of the unit itself and how it must be fixed. Measure the opening and working space and have the project team confirm the actual appliance, layout and service requirements.

  1. IKEA SUNNERSTA mini-kitchen 791.396.88 — Listed body dimensions, supplied set and wall-fixing instruction. Checked 21 November 2026.
  2. Green Retreats FAQ — Buyer-arranged plumbing and supplier-specific installation sequence. Checked 21 November 2026.
  3. England Approved Document G — Sanitation and handwashing considerations for the applicable use. Checked 20 November 2026.
  4. England household planning technical guidance — The intended incidental use and independent living context. Checked 20 November 2026.