Protect the dry route

Garden room bathroom layouts

One plan puts a WC and basin across the end of the room. The other adds a shower in a corner. Draw the fixtures, swing each door and trace a dry route back to the desk before deciding how much floor space to set aside.

Sources checked 21 November 2026

A changing seat and dry towel shelf beside a separate shower zone.

Compact WC and shower plans

On a fictional finished plan measuring 4 × 3 m, an end strip measuring 3 × 1.4 m reserves 4.2 m² and leaves 7.8 m² outside it. A 2 × 2 m corner reserve uses 4 m² and leaves 8 m². The 0.2 m² difference misses the useful distinction. The end strip makes room for a WC and basin with its door approached from the dry side. It uses the full depth of the left end. The corner option adds a shower and leaves a dry strip along the south side. Both keep a 1.20 × 0.60 m example desk and an assumed occupied-chair zone on the right. Draw and test your own work setup, including usable doors, paths and window positions.

For scale, the published Ideal Standard i.life S T459201 bowl projects 480 mm and is 355 mm wide. Its support and cistern need their own space. The wall-mounted Extra T373401 basin is 450 mm wide and projects 250 mm. The Mira Flight Low 1.1697.022.WH left-hand quadrant tray has a 1,000 × 800 mm enclosing rectangle. The exact curve and enclosure are separate specifications. The plans below place the body bounds inside their reserves. The shower plan marks an overlap between the illustrative shower enclosure operation and fixture approaches. Use the chosen enclosure’s drawing to check door travel and entry, then test movement, service access and cleaning with the proposed room. Check support, trap and duct sizes before agreeing the partition or floor. Ideal Standard bowl, Ideal Standard basin technical sheet, Mira Flight Low tray

Plan A · West end strip

Check the door and service wall

Dimensioned working example A with the west bathroom strip, bowl, basin and open leaves, plus illustrated routes.
Check the support duct, service wall, fixture approaches and effective opening in the completed strip. Open full-size diagram
Plan B · North-west corner

Check the overlap beside the shower

Dimensioned working example B with a corner shower, dry south strip and marked overlaps near the two fixture approaches.
The unverified shower operation rectangle overlaps the basin and WC approaches. Open full-size diagram

Fixture and approach positions

Use the same finished outer room in both plans: x = 0–4.00 m, y = 0–3.00 m. The origin is the inside north-west corner, x increases to the right, and y increases down the plan. The table specifies the body positions and illustrative service and approach areas, in metres. Body rectangles are solid. Dashed enclosures indicate unverified approach or operation areas. The reserve is gross to its outer line. Its partition thickness and finished WC or shower-room dimensions are open.

Fixture and approach coordinates in metres
Position or zoneA · WC and basin in the west end stripB · WC, basin and shower in the north-west corner
Gross bathroom reservex 0.00 to 1.40, y 0.00 to 3.00x 0.00 to 2.00, y 0.00 to 2.00
Wall-hung bowl body, front to southx 0.57 to 0.925, y 0.25 to 0.73x 1.38 to 1.735, y 0.25 to 0.73
Basin body, projecting east from west sidex 0.05 to 0.30, y 1.18 to 1.63x 0.05 to 0.30, y 1.14 to 1.59
Left-hand tray enclosing rectangleNo tray in this optionx 0.12 to 1.12, y 0.16 to 0.96. Tray bounds only.
WC support/cistern and services placeholderx 0.49 to 1.01, y 0.00 to 0.25, behind bowlx 1.24 to 1.93, y 0.00 to 0.25, behind bowl
Basin service wall and trap accessWest wall and below the basin. Wall thickness, tap/trap access and penetration positions openSame relation on the west wall. Confirm access alongside the shower design
WC user approach placeholderx 0.36 to 1.12, y 0.73 to 1.15x 1.22 to 1.89, y 0.73 to 1.35
Basin user approach placeholderx 0.30 to 0.85, y 1.18 to 1.63x 0.30 to 0.85, y 1.14 to 1.59
Shower enclosure operation and cleaning placeholderNo shower in this optionx 0.32 to 1.45, y 0.96 to 1.37, beyond the tray. Verify the actual screen/door, hand, threshold and cleaning access
New partition zoneEast reserve line x = 1.40 m, with the door gap below. Verify finished partition position and thickness inside the reserveEast and south reserve lines x = 2.00 m and y = 2.00 m, with the door gap in the south line. Verify finished partition position and thickness inside the reserve
Example bathroom door positionGap on x = 1.40 m, y = 2.05–2.85 m. Hinge (1.40, 2.85), opening into the office. Full-open leaf ends at (2.20, 2.85)Gap on y = 2.00 m, x = 0.88–1.68 m. Hinge (0.88, 2.00), opening into the office. Full-open leaf ends at (0.88, 2.80)
Remaining area outside the gross reserve7.80 m²8.00 m²

Both plans place the desk at x 2.55 to 3.75, y 0.15 to 0.75 and a hypothetical user-and-chair reservation at x 2.65 to 3.65, y 0.75 to 1.85. Both options keep that desk and its occupied rectangle outside the bathroom reserve. Use the same main entrance on y = 3.00 m from x = 2.65 to 3.55 m, hinged at (3.55, 3.00) and opening inwards to (3.55, 2.10). The figures show both quarter-circle sweeps and fully open leaf edges. The widths shown are nominal geometry, with effective opening and use still to confirm.

The route from the main entrance to the desk is shown with the leaves fully open. The centreline runs from (3.10, 3.00) → (3.10, 1.95). For A the bathroom route turns past the desk approach and comes back to the east-facing bathroom opening: (3.10, 3.00) → (3.10, 1.95) → (2.35, 1.95) → (2.35, 2.45) → (1.40, 2.45). For B it stays on the wider dry strip to the south side and turns north through the bathroom opening: (3.10, 3.00) → (3.10, 2.75) → (1.28, 2.75) → (1.28, 2.00). These lines show the route choices on the unoccupied floor. A person, turning space, assistance, furniture movement and a door in motion require their own checks.

A: check whether the cistern/support duct, west-wall services, fixture approaches and door effective opening fit together inside the actual completed 1.40 m gross strip. B: the illustrated shower operation area and WC approach overlap in the part of the plan between x = 1.22 and 1.45 m, y = 0.96 and 1.35 m. The shower operation area also overlaps the indicated basin approach. Ask the installer to check with everyone who’ll use the room how the chosen shower door moves, where they’ll step in and how they’ll reach the other fixtures. If they conflict, change the enclosure arrangement, shift a fixture or enlarge the wet reserve before ordering. The combined installation and occupied fit remain unverified.

Accessible bathroom needs

Begin at the house or garden entrance and describe the actual route through to the fixtures. Ask the intended user what mobility aid or assistance they use, how they approach or transfer, where they need to reach and how to close the door in private. Check levels at the threshold and space for a visitor or helper where needed. Have an appropriate access adviser and designer confirm the use category, proposed equipment and applicable part of England’s Approved Document M when it applies. A successful paper fit still needs review with the intended person and the actual fixtures. The example reserve areas are comparison inputs only.

England Approved Document M

Where will you change after a ride or workout?

Give damp shoes and kit a place away from towels and clean clothing.

Wet cycling shoes on a drip tray across a threshold from folded clothes and a towel.

Record the trip from bike to desk

For the cycle-commute example, park the bike securely, leave wet shoes on a drip tray, collect a towel and keep dry clothes on a separate bench. Plan laundry and the route back to the desk.

Plan a dry side for the route back to the desk, including seating for changing and storage for clean clothes, towels and toiletries. Put wet shoes and clothing where runoff and odour will be managed and where they will dry without crowding doorways. Decide how laundry leaves the room and where the bike itself will be secured. Give the designer a normal week of use, including repeated showers and wet clothes on the coldest days, so drying, ventilation and hot water are sized around the real activity.

What the wet-room contractor needs to know

Give the wet-room contractor one brief for walls and floor, permitted penetrations, waterproofing and service access. Ask how the shower drains and can be cleaned, how the floor and waterproofing are supported, where extraction discharges and how replacement air enters while the door is shut. A heated towel rail can serve a drying task, with ventilation assessed separately. Have the plumber, electrician and room supplier agree the service layout before the lining closes. Collect commissioning, maintenance and product information at handover.

For a project in England, ask the designer which building category, Approved Document F volume and edition apply. The GOV.UK index distinguishes Volume 1 for dwellings and Volume 2 for buildings other than dwellings. England Approved Document F

Will the bathroom work with the door open?

Give the supplier the fixture positions, door swing and finished room dimensions. Mark where the water and waste connections need checking.

Open the private project planner

Sources and checks

The fixture sources supply selected body bounds. The plans compare fictional gross reserves and possible door motions on one finished room. An access adviser, designer and installers verify the actual people, assembled components, effective openings and service details.

  1. Ideal Standard bowl — Published selected product body bounds used in the fictional layouts. Checked 21 November 2026.
  2. Ideal Standard basin technical sheet — Published selected product body bounds used in the fictional layouts. Checked 21 November 2026.
  3. Mira Flight Low quadrant shower trays: line drawing and product dimensions — Published selected product body bounds used in the fictional layouts. Checked 24 November 2026.
  4. England Approved Document M — Separate access guidance volumes and applicability for the designer to confirm. Checked 21 November 2026.
  5. England Approved Document F — Ventilation scope and volume selection for the building category. Checked 21 November 2026.