Survey both directions
The return journey can change effort, visibility and operation. Keep the same station references and record untried conditions.
Make the route surveyPlan the whole journey
Walk or wheel the route from the house to the desk and back with the person who’ll use it, where practical. Record the turns, changes in level and the space they need at the office door.

At a glance
The return journey can change effort, visibility and operation. Keep the same station references and record untried conditions.
Make the route surveyRise, available run, landings, turns, drainage and door operation belong in one coordinated proposal.
Collect the design inputsNominal door size, effective opening, threshold levels and weather detail are separate pieces of evidence.
Complete the entrance checklistPlan a continuous journey from the chosen starting point to the working space and back. The house exit, path, turn, gate, approach and operated office door can each determine whether the route is useful. Begin with the person’s activities and preferences in the accessible-office brief, then give every outside constraint a named place in the survey.
The example below begins at the house. Extend the record to parking, a street entrance or another starting point when relevant. Add stations wherever the direction, surface, level or usable space changes; repeat the same station references on the return journey.
Repeat the same stations in reverse. Door actions, visibility, effort and assistance can differ on the way back. Add stations for extra segments and mark absent features “not present”. This is a check order, without measured route widths or levels.
Record the narrowest useful passage and the faces you measured between, not just a paving or gate’s advertised size. Note obstructions in their operating state: a gate leaf, latch, planting or stored item can change the available arrangement. Record the actual turn and the space the person needs to perform it; a line on the schematic has no width.
Separate the slope along the route from crossfall, the sideways slope across it. Mark both as unknown until measured. Describe the surface, edges, joints, covers and drainage as well as the levels. The approach and ramp sections of England’s Approved Document M Volume 2 consider surfaces, effort, stopping and door approaches together; the applicable design must be established for the actual building and person.
| Field | What to record |
|---|---|
| Station and direction | Station or segment ID, named start and end references, outward or return direction, and the activity being reviewed. Record: ____ |
| Length and clear width | Actual measured length, widths and narrow points, with measurement faces, units, method and measured, assumed or unknown status. Record: ____ |
| Levels and crossfall | Measured levels, rise, available horizontal run and crossfall at named positions; keep unsurveyed values unknown. Record: ____ |
| Surface and obstructions | Surface condition, joints, edges, drainage, covers, planting and other obstructions; record maintenance questions. Record: ____ |
| Turn, rest and assistance | Actual device or aid configuration, turning and carrying tasks, rest and help preferences, and the states still untried. Record: ____ |
| Light and exposure | Lighting, shelter and weather or seasonal conditions observed, with date and time; identify wet, dark, leaf or ice conditions not tested. Record: ____ |
| Evidence reference | Photograph, measured drawing or supplier record, revision and date, who recorded it and its measurement basis. Record: ____ |
| Action and verification | Responsible designer or installer, required action or evidence, confirmation date and status: observed, needs review or unknown. Record: ____ |
Illustrative record, not a real site observation: station 3 has a supplier-stated gate size, but its opening with the leaf and latch in use is unknown. Keep the nominal size as supplier-stated. Request the operating drawing or measurement, identify who will provide it and leave the passage question unresolved.
Record what was observed in daylight or dry conditions and what remains untried. Leaf build-up, ice, standing water, reduced light and fatigue on the way back are review questions, not invitations to test an unsafe route. Include who will inspect, clear and maintain the route after installation.
A ramp is one possible response to a level change. Its design needs the measured rise, available run and the space needed at each end. Extending a ramp can also move a landing, consume garden space or interfere with a gate and the office door. Resolve the whole arrangement before treating the ramp as an isolated item.
The design considerations in Approved Document M Volume 2, section 1 discuss effort, rest, weather and landings where doors are operated. They also recognise that a ramp is not necessarily convenient for everyone with walking difficulties. Use the person’s requirements and the project’s applicable guidance; this guide does not choose a universal gradient.
Ask for a measured level survey and an outline of the available footprint. A photograph or an estimated step height cannot establish the complete rise, crossfall or arrival arrangement. Keep unseen drainage and services as questions for the responsible survey or design work.
Draw the gate and office door in use alongside the proposed landing or approach. Include holding, unlocking, opening, waiting and returning. The person should not have to discover after installation that operating the door competes with the space they need to arrive.
Record the selected solution, its design owner and the drawing revision in the survey. Ask for the associated groundworks, drainage, finishes and maintenance scope in the price. The quote-comparison guide helps keep those responsibilities and unpriced items visible.
Ask for a drawing that shows the approach, the selected door and the finished floor together. Even a threshold that looks flush needs measured levels, enough room to pass through and a confirmed weather detail.

For a wide garden-office door, ask what passage is available in the state you will actually use. A large frame, a double-door label or a fully opened promotional image does not specify the everyday opening with the chosen leaf, handles, stops and panels in position.
In Approved Document M Volume 2’s effective-clear-width guidance, the closing-side stop and hinge-side obstructions matter, along with approach and building context. Keep the nominal assembly or leaf dimension separate from the selected set’s effective opening. That measurement still does not settle the person’s reach, opening effort or approach.
| Operation | Review question |
|---|---|
| Inward hinged | Plot the full swing as well as the final open leaf. Compare the person opening it with the occupied inside arrival, furniture and return action. |
| Outward hinged | Plot the full swing on the outside approach. Check where the person waits and operates the handle, plus nearby boundaries, gates and other obstructions. |
| Sliding | Record the usable open position, parked panel, handles, track, opening effort and passage. A panel that slides away still needs an actual operating and threshold check. |
| Folding or double-leaf | Record the stack and any everyday single-leaf mode separately from the fully opened set. Confirm how each mode is unlocked, held and passed through. |
There is no universally best opening direction. The useful choice is the one supported by the person’s task sequence, both approaches and the actual selected mechanism. The adaptable interior concepts show why a door’s swing can collide with storage even when the final open leaf does not touch it.
Request a vertical section with the inside and outside finished levels on one datum. It should identify the track or upstand, seals, cill, floor build-up and drainage paths. A flush appearance alone cannot establish how that combination will perform or how the person will use it.
Origin’s manufacturer guidance distinguishes its weathered and non-weathered threshold arrangements and says surface-water drainage is site-specific. Its mobility-threshold wording concerns Single and French doors. These are source-specific distinctions, not proof about every flush threshold or a specification for an unselected bifold.
| Field | What to record |
|---|---|
| Selected set and revision | Manufacturer, exact door configuration, drawing revision, opening direction and intended usable operating state. Record: ____ |
| Nominal and effective opening | Record assembly or leaf size separately from effective clear passage at the selected open position, including stops, hardware and any parked panels. Record: ____ |
| Operation and effort | Leaf or stack projection, handle and lock actions, reach, grip and operating effort; include the intended single or double-leaf use. Record: ____ |
| Both approaches | Outside arrival area, turning and operated door space, plus occupied inside arrival and return; record actual user needs and untried states. Record: ____ |
| Finished levels and section | Selected threshold section with inside and outside finished levels, floor build-up, track, seals and cill on one datum. Record: ____ |
| Weather and drainage | Evidence for the selected system and exposure, drainage design and maintenance access, with responsible design and installation parties. Record: ____ |
| Safe review record | Conditions and actions safely tried with the person, preferences, outcomes and what was not tried; no claimed mock-up unless completed. Record: ____ |
| Confirmation before manufacture | Unresolved question, required selected drawing or site-specific professional input, responsible person and review date before ordering. Record: ____ |
No selected supplier drawing proving the effective opening, commissioned threshold system or installed floor junction has been supplied for this guide. Those are exact evidence requests in the checklist, not details that a generic example can fill in.
Bring the route survey and selected-door record together before manufacture. Each unresolved point needs an owner and a referenced answer: the person’s preference, a measurement, a selected drawing or the appropriate professional design input. Keep those evidence types distinct.
The New Garden Room Company’s Coventry project, completed in October 2022, describes connections between the house, garage and garden room for a powered-wheelchair user. It supports looking at the whole journey. Its reported ramp is a solution for that project, not a general gradient recommendation or our inspected result.
Dore’s case dated 2 July 2026 describes sliding entry with coordinated floor, threshold and drainage work. For your own office, you still need the route measurements, details of the opening you’ll order and a check with the person who will use it.
Use the correct national and building-use route. Approved Document M is England guidance, with separate volumes for dwellings and other buildings. Ask the responsible access or building designer to establish what applies; the permissions guide keeps planning, building control and private permissions separate.
No actual route survey, user or device requirements, safe mock-up, selected clear-opening detail or site-specific professional advice has been obtained here. The records identify what to gather and who should resolve it. An observation, a supplier statement and an approved design are different outcomes.
The editable text file repeats the six checkpoints, outward and return order, both eight-field records, level-change inputs, door-operation checks and review sequence. Complete and save your copy locally; downloading it sends no supplier enquiry.
The current England Approved Document M Volume 2 text was checked on 21 November 2026 for approach and ramp design considerations. The official clear-opening guidance, Origin threshold information and supplier case examples refer to the documents listed below. The original schematic depicts observation order only; it is not a measured site or design. No actual survey, selected door/floor detail, personal test or site-specific professional input has been obtained. Ask for a drawing of the selected door and finished floor levels, then check the whole approach with the person who will use it.