GARDEN OFFICE: ROUTE SURVEY AND SELECTED ENTRANCE RECORD Checked 21 November 2026. Blank local records, not a surveyed or approved route. Fill in and save your copy on your device. Downloading the record sends no supplier enquiry. SIX OBSERVATION CHECKPOINTS 1. House exit Observe the chosen exit, door actions, threshold and first outside surface. 2. Outside path segment Record clear dimensions, levels, surface, edges, drainage and obstructions. 3. Turn or gate Record the turn and any gate, latch, moving leaf and approach on both sides. 4. Level change and approach Identify any rise and available run, then the office arrival area and door operation. 5. Office door and threshold Check the selected operating state, effective passage and coordinated floor detail. 6. Inside arrival Connect to the occupied room brief and review leaving as well as entering. Outward checks: 1 → 2 → 3 → 4 → 5 → 6. Return checks: 6 → 5 → 4 → 3 → 2 → 1. Repeat the checks on the return journey; actions, effort, visibility and assistance may differ. Boxes are observation checkpoints, not physical spaces. Arrows show check order, not an approved route or movement clearance. Repeat a station for additional segments. Mark an absent feature not present; this example does not require a gate, level change or ramp. This schematic is unscaled. No path width, gradient, threshold height, landing size or personal movement envelope is supplied. Link each observation to the route survey and selected door record. Keep measured, supplier-stated, assumed and unknown information distinct. ROUTE SURVEY: repeat for each station and direction 1. Station and direction Station or segment ID, named start and end references, outward or return direction, and the activity being reviewed. Record: ____ 2. Length and clear width Actual measured length, widths and narrow points, with measurement faces, units, method and measured, assumed or unknown status. Record: ____ 3. Levels and crossfall Measured levels, rise, available horizontal run and crossfall at named positions; keep unsurveyed values unknown. Record: ____ 4. Surface and obstructions Surface condition, joints, edges, drainage, covers, planting and other obstructions; record maintenance questions. Record: ____ 5. Turn, rest and assistance Actual device or aid configuration, turning and carrying tasks, rest and help preferences, and the states still untried. Record: ____ 6. Light and exposure Lighting, shelter and weather or seasonal conditions observed, with date and time; identify wet, dark, leaf or ice conditions not tested. Record: ____ 7. Evidence reference Photograph, measured drawing or supplier record, revision and date, who recorded it and its measurement basis. Record: ____ 8. Action and verification Responsible designer or installer, required action or evidence, confirmation date and status: observed, needs review or unknown. Record: ____ LEVEL-CHANGE DESIGN INPUTS Surveyed start and finish levels on one stated datum, total rise and the horizontal space actually available. The intended person, aid or device, carrying, rest and assistance preferences, including the return journey. Landings, turns, passing or rest needs and door operation, with their position in the whole plot. Surface, drainage and weather exposure, plus the design of edges, handrails or protection where applicable. Existing walls, boundaries, planting, covers and services; responsibilities for surveys, design, installation and maintenance. The applicable nation, building use and approval route, with the responsible designer’s written decisions and selected details. DOOR-OPERATION CHECKS Inward hinged Plot the full swing as well as the final open leaf. Compare the person opening it with the occupied inside arrival, furniture and return action. Outward hinged Plot the full swing on the outside approach. Check where the person waits and operates the handle, plus nearby boundaries, gates and other obstructions. Sliding Record the usable open position, parked panel, handles, track, opening effort and passage. A panel that slides away still needs an actual operating and threshold check. Folding or double-leaf Record the stack and any everyday single-leaf mode separately from the fully opened set. Confirm how each mode is unlocked, held and passed through. SELECTED DOOR AND THRESHOLD CHECKLIST 1. Selected set and revision Manufacturer, exact door configuration, drawing revision, opening direction and intended usable operating state. Record: ____ 2. Nominal and effective opening Record assembly or leaf size separately from effective clear passage at the selected open position, including stops, hardware and any parked panels. Record: ____ 3. Operation and effort Leaf or stack projection, handle and lock actions, reach, grip and operating effort; include the intended single or double-leaf use. Record: ____ 4. Both approaches Outside arrival area, turning and operated door space, plus occupied inside arrival and return; record actual user needs and untried states. Record: ____ 5. Finished levels and section Selected threshold section with inside and outside finished levels, floor build-up, track, seals and cill on one datum. Record: ____ 6. Weather and drainage Evidence for the selected system and exposure, drainage design and maintenance access, with responsible design and installation parties. Record: ____ 7. Safe review record Conditions and actions safely tried with the person, preferences, outcomes and what was not tried; no claimed mock-up unless completed. Record: ____ 8. Confirmation before manufacture Unresolved question, required selected drawing or site-specific professional input, responsible person and review date before ordering. Record: ____ REVIEW SEQUENCE 1. Confirm the intended route, person’s preferences, drawing revision and any assistance to include. Identify which features are absent or repeated. 2. Collect measured route records and selected door drawings. Keep supplier statements and estimates separate from measurements, and leave missing values unknown. 3. Review the sequence in both directions with the person. Where chosen and safe, use an existing level space for a reversible full-size operation mock-up; do not trial an unfinished ramp, unstable platform or unsafe route. 4. Record the conditions and actions actually tried, difficulty or effort, assistance and untried states. Record hazardous weather or inaccessible conditions as untested rather than asking someone to prove they can manage them. 5. Ask the responsible access or building designer and installer to resolve the survey, selected-system and construction questions. Bind the answers to the drawing and revision before manufacture. 6. Check the installed route and entrance against that agreed evidence before acceptance, then review maintenance, seasonal conditions and changes to the person or equipment after use. OPEN PROJECT FACTS No actual surveyed route, user/device requirement, selected clear-opening detail, commissioned threshold, safe mock-up or site-specific professional input has been supplied. Record the missing evidence and responsible person; do not turn an unknown into a pass. SOURCE ROUTES https://www.gov.uk/government/publications/access-to-and-use-of-buildings-approved-document-m https://assets.publishing.service.gov.uk/media/66f6c5eec71e42688b65ee11/ADM__V2_with_2024_amendments.pdf https://origin-global.com/advice-centre/bi-folding-door-thresholds-faqs https://newgardenroomcompany.com/accessible-garden-room-coventry/ https://doregardenoffices.co.uk/wheelchair-accessible/ England guidance is not a universal UK route specification. Origin distinctions belong to its described systems. Supplier cases are reported examples; Coventry is a historical October 2022 project. No case-specific ramp or threshold is a general recipe.