MASONRY AND FRAMED OPTIONS
Will the brick carry the load or finish the wall?
Draw the indoor space you need, then compare the wall assembly, external footprint and work programme.

How much of the plot will the walls take up?
Compare the same clear room
Draw the external footprint and clear finished internal space separately. For example, start with a finished room of 4.00 × 3.00 m and an assumed wall envelope of 0.30 m per side. The external wall face rectangle would be 4.60 × 3.60 m before projections. A hypothetical 0.20 m envelope gives 4.40 × 3.40 m for the same internal room. Those wall thicknesses are assumptions for the drawing. Ask your designer how thick the finished walls would be.
Use a plan and elevation to test approach, door swing, daylight and views. Brick colour, bond or slips can suit the house while changes in external depth or a roof overhang alter fit. Ask which dimensions include trim and roof projections.
Compare LCS EcoBuild’s brick-and-block garden room with FAB Architects’ Hove Hidden Studios. The first describes structural masonry work after the foundations. The Hove design uses glazed brick slips over SIPs. Use their photographs and scope to compare visual impact, then request the wall thickness and opening details for your proposal.
Which jobs need to happen first?
Confirm that the location and use fit the applicable planning route. In England, Class E eligibility depends on much more than wall material. Ask building control about the actual proposal and any services. A contractor programme should cover access, ground investigation, foundations, walls, openings, roof, weather protection, drying and completion trades.
LCS EcoBuild’s project sequence describes site preparation, foundations and brick and blockwork on one build. Have the appointed structural designer take responsibility for ground assessment, foundations, walls and openings. Agree who designs thermal and moisture continuity at the base, roof and openings, and who coordinates service entries and commissioning. Name each party on the tender before work.
- England. Check Class E and building regulations exemptions
- Wales. Check outbuilding planning and building regulations
- Scotland. Check outbuilding planning and building warrants
- Northern Ireland. Check permission and district-council building control
Read the project’s obligations with the applicable building control route. In England, check regulation 9 where an exemption is proposed. Ask the building designer and specialist trades how their duties apply to the specific fabric and services, using the England dutyholder guidance when it applies.
Compare brick and framed alternatives
Compare the wall assembly and its role. Structural masonry carries loads in its designed system. A brick outer leaf has distinct support and junction requirements. Brick slips produce a brick surface as part of a system with a specific substrate and fixings. Timber frame is also a complete design including finishes, moisture control and junctions.
Ask specialists for comparable drawings showing finished wall thickness, foundation responsibilities, roof and window details, inspection and maintenance assumptions. FAB’s Hove project is an example of visual brick slips on a framed SIP assembly. Use an actual masonry package to compare structure or wall cost.
For masonry and frame quotes, compare the site programme at the same completion point. On the masonry quote ask for ground investigation, excavation, foundation and support checks, wall and opening stages, weather protection and drying where applicable, and the fit-out and inspection sequence. On the frame or panel quote ask for the actual factory lead time, prepared-base date, access and delivery, assembly and closure, services and final checks. Use each contractor’s dated dependencies. Leave durations open where the proposal does not establish them.
Masonry and frame comparison
Set one handover point for all bids. Ask the contractor to fill the dependencies and provide dated estimates.
Download the masonry and frame comparison
| Option | What carries load | Thickness and support evidence | Junctions and access | Delivery, dependencies and programme |
|---|---|---|---|---|
| Structural brick or block | Designed masonry | Request finished depth, load path and foundations | Confirm eaves, openings, moisture and access | Confirm excavation, foundations, opening work, drying and inspection dates |
| Frame with brick outer leaf | Designed frame. Ask how the outer leaf is supported. | Confirm wall depth, foundation and support | Confirm junctions, masonry access and maintenance | Confirm frame delivery, roof coordination and brickwork dependencies |
| Frame with brick slips | Designed frame with compatible slips and substrate | Confirm full build-up and fixing evidence | Confirm adhesive or fixings, trims and replacement | Confirm substrate readiness, weather, trims and closure |
| Timber frame with boards | Designed frame and cladding assembly | Confirm insulated junctions and base fixing | Confirm drying path, recoat access and replacement | Confirm factory state, access, assembly, service and inspection dates |
Related guides
Sources and checks
The drawings show at the same scale how two assumed wall depths change the outside footprint. Sources describe their own projects and applicable statutory routes.
- LCS EcoBuild: actual garden room construction sequence — actual garden room construction sequence Checked 20 November 2026.
- Preformed Substructures: masonry room in a root-protection area — masonry room in a root-protection area Checked 20 November 2026.
- FAB Architects: Hove Hidden Studios — Hove Hidden Studios Checked 21 November 2026.
- Current England GPDO Class E — Current England GPDO Class E Checked 21 November 2026.
- Building Regulations 2010 regulation 9 — Building Regulations 2010 regulation 9 Checked 21 November 2026.
- Wales outbuilding planning guidance — Wales outbuilding planning guidance Checked 20 November 2026.
- Scotland outbuilding planning guidance — Scotland outbuilding planning guidance Checked 20 November 2026.
- Northern Ireland planning application guidance — Northern Ireland planning application guidance Checked 20 November 2026.
- Welsh building-regulations documents — Welsh building-regulations documents Checked 20 November 2026.
- Scotland building warrant — Scotland building warrant Checked 20 November 2026.
- Building Control Northern Ireland — Building Control Northern Ireland Checked 20 November 2026.
- Building Safety Regulator: design and building duties — England client, designer and contractor duties and coordination. Checked 21 November 2026.