MASONRY AND FRAME COMPARISON Set one handover point for all bids. Ask each contractor what has to happen before work can start and when they expect to finish. Ask them to date their estimate. Option | What carries load | Thickness and support evidence | Junctions and access | Delivery, dependencies and programme Structural brick or block | Designed masonry | Request finished depth, load path and foundations | Confirm eaves, openings, moisture and access | Confirm excavation, foundations, opening work, drying and inspection dates Frame with brick outer leaf | Designed frame. Ask how the outer leaf is supported. | Confirm wall depth, foundation and support | Confirm junctions, masonry access and maintenance | Confirm frame delivery, roof coordination and brickwork dependencies Frame with brick slips | Designed frame with compatible slips and substrate | Confirm full build-up and fixing evidence | Confirm adhesive or fixings, trims and replacement | Confirm substrate readiness, weather, trims and closure Timber frame with boards | Designed frame and cladding assembly | Confirm insulated junctions and base fixing | Confirm drying path, recoat access and replacement | Confirm factory state, access, assembly, service and inspection dates Same completion point ____________________________________________________________ Named designer ____________________________________________________________ Evidence date and source ____________________________________________________________ Named dependencies and realistic elapsed time ____________________________________________________________ Unconfirmed durations and party to resolve ____________________________________________________________ Named lead for ground/foundations/structure _____; thermal and moisture junctions _____; utilities, penetrations and commissioning _____; approvals and hold points _____.