Do you need foundations?
The room needs a verified support arrangement suited to its loads and the ground. That does not automatically mean a full concrete slab.
Compare the proposed systemsGround and levels
Before comparing a slab, pads or ground screws, ask what will support your chosen room on this plot. Have the survey identify ground preparation and access work so you can see which costs sit outside the base price.

At a glance
The room needs a verified support arrangement suited to its loads and the ground. That does not automatically mean a full concrete slab.
Compare the proposed systemsThere is no universal garden-room depth. Obtain a design for the actual building and site, with a named person responsible for it.
Ask for the design evidenceA sound-looking slab, patio or deck does not establish suitability. Assess its support, condition and dimensions before counting reuse as a saving.
Follow the reuse checksA foundation carries the building’s loads into the ground. Site preparation makes the foundation and surrounding space practical to construct and use. One can be included in a package while the other remains unpriced.
For a garden office, establish the intended use and complete building specification before comparing bases. Include heavy storage, gym equipment, partitions or a different roof specification. Ask the supplier to explain how the proposed supports suit that room and your site, rather than choosing a base from a photograph.
| Proposed system | Ask the designer or supplier to establish | Keep in the quotation |
|---|---|---|
| Designed concrete slab | Ground suitability, the building’s support requirements, levels and the specified construction/detail. | Preparation, excavation, concrete access, spoil, drainage and making good. |
| Concrete pads or piles | The actual support system and how its locations, sizes and supporting frame transfer the proposed loads. | Who sets out and installs supports, handles obstructions and checks the completed base. |
| Ground screws | Suitability for the ground and loads, the specified screw/support arrangement, installation evidence and site limitations. | Access for equipment, service checks, alternatives for unsuitable ground and any extra supports. |
| Supplied foundation kit or proprietary system | The buildings and conditions it is designed for, installation requirements and who confirms this site is suitable. | Components versus labour, preparation, setting out, inspection and acceptance. |
These are commissioning questions, not interchangeable construction details. A foundation kit describes supplied components; it does not establish that the soil, support positions or drainage are suitable. Ask who takes design responsibility when the room, kit and groundworks come from different businesses.
Check the selected model’s current written requirements. A foundation statement on another range or older supplier page may describe a different package. None of these examples determines the right system for your garden.
Compare suitable, designed solutions for the same finished job. Include investigation, clearance, access, excavation, spoil, drainage, entrance levels and reinstatement as well as the supports. A smaller material bill or less excavation alone does not establish the lowest project cost. These sources do not establish a universal cheapest, best or lowest-carbon system.
Use the whole-project budget and quote comparison worksheet to mark preparation, foundation and surrounding work separately as included, priced extra, excluded or unknown.
Your sketch records observations and unanswered questions. It is not a verified services map, a ground investigation or a foundation drawing. Label approximate measurements and suspected routes honestly.
| Put on the sketch or photograph | Ask the surveyor to resolve |
|---|---|
| Existing surface and structures | Footprint, hardstanding, old sheds and visible defects. Who investigates below, removes obstacles and disposes of material? |
| Slope and finished levels | Mark the high/low sides and approximate fall. Confirm floor/roof levels, entrance access and any retaining, step, ramp or edge work. |
| Trees, wet areas and ground history | Record trees, persistent pooling and known filled areas. What ground investigation or specialist advice is needed? |
| Drain covers and services | Mark visible covers and known or suspected routes separately. How will services be identified, protected and kept accessible? |
| Vehicle and garden access | Sketch the complete route, gates, turns, steps and overhead restrictions. Can equipment and materials reach the site? |
| Building and equipment loads | Supply the selected specification and intended use. Have heavy items, partitions and other proposed changes been assessed? |
Give the sketch a date and a reference shared with the supplier. Add the proposed building position, house, boundaries and nearby structures. Number photographs so the surveyor can match each view to the sketch. Note what is unknown rather than inferring soil type, a service route or the condition of buried supports.
Photograph the area after wet weather as well as on a dry day, from safe accessible positions. Mark where water collects or runs. Ask how ground and roof water will be managed and who prices that work. A raised floor on a slope can require a different entrance from the level brochure setting.
There is no defensible universal depth, slab thickness, pad size or screw spacing for every garden room. The England Approved Document A covers structural loads and construction, including foundations. It is not a ready-made design for your plot; requirements elsewhere in the UK must be checked through the relevant national/local route.
Ask the named designer what building loads, soil, trees, water, slope, existing structures and services inform the proposal. Request a project-specific drawing identifying the proposed supports, levels, connection to the building and any investigation or installation evidence required. Record who checks the completed work before the room is assembled.
For a brick or other masonry garden room, use a separate structural brief. Do not borrow a screw or pad arrangement from a lightweight timber model. Give the designer the proposed wall, roof and equipment specification and ask who assesses the ground and designs the support system before ordering.
Imagine a 4m-long by 3m-deep footprint with a straight, uniform 0.3m fall along its 4m length. The volume between that slope and a horizontal reference at its higher end is a triangular wedge: 4 × 3 × 0.3 ÷ 2 = 1.8m³.
This calculation does not propose removing that wedge. A designer may consider a different level or support arrangement. Actual works depend on the selected detail, working space, ground contents and disposal arrangements; loose excavated material is not described by this geometric figure.
Ask each bidder how their proposal deals with the support, any voids or exposed edges, drainage, the entrance level, landscaping and retaining work. Compare the work needed to finish the site as well as the support height and quantity of soil.
| Decision or task | Ask for this record |
|---|---|
| Design and site investigation | Named responsible designer, required investigations, agreed building specification and drawing revision. |
| Preparation and services | Clearance, access, service identification/protection, excavation planning and any restrictions before work begins. |
| Installation and base acceptance | Who installs, who inspects, the supplier’s acceptance criteria and written handover before assembly. |
| Completion and changes | Spoil, drainage, making good, entrance work, records, payment stages and written approval of extras. |
HSE’s excavation guidance identifies ground stability, nearby structures, services and water as issues that must be addressed before and during work. Ask the contractor how it will plan and manage these risks. A homeowner’s sketch does not establish that digging is safe; this article does not provide excavation or temporary-support instructions.
Identify the actual water and sewerage providers for the address. For a Wessex Water area, its minor public sewer process describes a three-metre proximity check and standard criteria. Meeting its applicable criteria can provide a consent route; cases outside them need its stated procedure. Verify the live criteria for the actual asset. This is not a universal clearance rule, foundation approval or permission for a new foul connection.
Planning and building regulations are separate checks. For a Bristol City Council property, use its building-work approval guide, which also flags tree protection and other permissions. Elsewhere, start with the relevant authority. Record who obtains required advice, applications, inspections and completion records.
Keep the sketch and photographs alongside your brief. The private planner records requirements and questions; it does not inspect the ground, design a base or contact a supplier.
You may be able to reuse an existing surface. Have it assessed and get the room supplier’s written acceptance before counting it as a saving. Appearance alone tells you little about what it can support.
| Existing surface | What must be established | What to request |
|---|---|---|
| Concrete slab | Dimensions, condition, construction, ground support, levels and compatibility with the proposed room. | Physical assessment and written acceptance of the support arrangement, drainage and warranty position. |
| Patio or paving | What lies below the visible surface, how loads would be supported, movement/condition, levels and drainage. | A decision on the complete supporting arrangement. Pavers alone do not verify a structural foundation. |
| Decking | The load path through boards, joists, beams and supports into the ground, including condition and capacity for the proposed room. | Assessment of the whole structure and supplier acceptance. An apparently sound walking surface is insufficient. |
A slab that carried a shed may be too small or have unsuitable construction for a different room. A patio may conceal uncertain preparation. A deck may have inaccessible or deteriorated supports. These are questions for assessment, not findings about your garden.
Specify any investigation, repairs, adaptation, drainage or other required work. Obtain accepted dimensions, level tolerances, support locations and warranty conditions in writing.
Describe removal, disposal, access and the new designed solution separately. Keep the cost unknown until quoted; do not assume replacement is free or inevitable.
Agree who decides, what evidence is needed and the decision date before the new building arrives. If your groundworker provides a base for another company’s room, have the supplier check the drawing and agree the handover process before installation.
Send the same site information to each bidder and ask for clearance, foundation, excavation, spoil, service protection, drainage and finished access to be itemised. The comparison worksheet keeps unknown groundworks separate from buyer allowances. Use the restricted-access guide if machinery or materials face a difficult route, and the services guide to coordinate final connections.
Garden Building Guide checked the linked official and supplier sources on 20 November 2026. This is guidance for commissioning a survey and comparing responsibilities, not a site investigation, structural design or professional approval. The slope diagram and calculation are original hypothetical geometry with a uniform fall; no excavation or foundation is specified. Supplier statements describe their named systems or product conditions and are not independent performance tests. Wessex Water wording was checked through current primary-domain indexed text in the services research; direct access returned HTTP 403, so verify its live criteria for the actual asset. Consequential site-specific design requires the responsible competent practitioner.