Prepare a detached-room budget
Garden room cost calculator
Compare up to two detached garden room budgets using your own quotes. Enter the base, delivery and connections alongside the room price. You’ll see which costs you can total and which still need a figure.

Enter your quote figures
Record quotes, allowances and open costs
Start with scenario A. Add scenario B to compare the same scope. Enter your own figures and name each source. Your entries stay on this page. Download a record before leaving if you want to keep it.
How the calculator handles different build options
Ask for scope that fits the construction route
| Route | Cost evidence to ask for |
|---|---|
| Self-build | Materials, quantities and waste, bought-in trades, delivery, tools, base and services. |
| Kit | Exact model, material bundle and delivery. Price assembly, a suitable foundation, labour and completed services separately. |
| Installed timber | Named model and configuration, survey, installed work and handover. Confirm base, freight, painting or finishes, and connection. |
| Brick or masonry | Measured site and structural schedule, ground and drainage, brickwork, roof, openings, labour and approval scope. Obtain separate masonry evidence. |
Green Retreats lists a B1 Lite size and price matrix with VAT, installation and delivery within its stated zone, plus a separately selectable foundation upgrade. The Pent Haus Cedar listing includes levelling hardware for an existing suitable base and lists installation as an option. The work that remains differs between the products. B1 Lite scope · Pent Haus kit scope
Work through a sample budget
Fictional 4 × 3 m room, 12 m² externally. Scenario A enters a £12,000 written room quote including VAT, with work labels “room, base”. A second line marked “Included in another line” uses “base” and records no extra charge. A £1,000–£1,500 connection allowance before VAT becomes £1,200–£1,800 at the example rate of 20%. The resolved subtotal is £13,200–£13,800, or £1,100–£1,150 per m² of external footprint. Unknown site work stays open.
Scenario B could use the same work labels with a separately priced base. Resolve the site work in both scenarios before comparing totals.
See each line’s entered price, VAT basis, inclusion and source in the budget record.
What still needs a written price?
Compare dated and scope-matched written prices for the build route. Check each line for VAT, validity, exact configuration and survey conditions. If base, delivery or connection appears in a package and an extra line, confirm who owns it and count it once. A sample quote or a supplier’s headline figure cannot establish a market estimate.
Use the quote comparison guide and project planner to collect evidence for missing items.
Related guides
Sources and checks
The calculator sums validated written quotes and allowances in pounds, including entered VAT. It flags overlapping work labels and keeps unresolved costs out of the subtotal. Example figures are fictional.
- Green Retreats B1 Lite official listing — Provides model-specific measured dimensional options, a price matrix, installation and delivery limits, and foundation options. Checked 21 November 2026.
- Pent Haus Cedar kit official listing — Identifies the named 3.0 × 2.6 m kit, base levelling kit and optional foundations and installed service. Checked 21 November 2026.