What belongs in the quote?
The selected room, installation, site work, services, VAT and exclusions. Match finished internal space and specification first.
Check the scopeScope and pricing
Give both suppliers the same brief. Compare the total payable, the work each price includes and who will handle anything left out.

At a glance
The selected room, installation, site work, services, VAT and exclusions. Match finished internal space and specification first.
Check the scopeUse the expiry and conditions in that written quotation. Record revisions, survey assumptions and the version you accept.
Keep a quote registerMark it unknown. A buyer’s allowance can help with budgeting, but cannot turn unpriced work into a fixed supplier price.
Use the comparison worksheetGive both suppliers the same requirements, then ask them to identify every substitution and exclusion. Two products called a garden office can describe different space, construction and work.
| Requirement | Record in both quotations |
|---|---|
| Size and use | Finished internal dimensions, maximum outside dimensions, users, furniture, visitors and any heavy equipment or plumbing. |
| Building specification | Floor, walls, roof, insulation, glazing, doors, finishes, heating and ventilation; identify substitutions. |
| Ground and access | Survey assumptions, clearance, base, excavation, spoil, delivery route, travel and handling. |
| Assembly and services | Installation labour, internal fittings, final house power/data connection, any water/drainage, testing and making good. |
| Price and responsibility | VAT-inclusive payable amounts, priced extras, exclusions, provisional sums and who completes each part. |
For garden room prices including VAT, ask for the total payable for each selected line and its VAT basis. If a figure is ambiguous, have the supplier clarify it; do not silently add or remove tax. Keep the same basis across the comparison. This worksheet does not assess tax recovery.
A supply-only price needs a separate schedule for labour, tools, deliveries, foundation work, waste, finishing and final connections. Record your own time separately. An installed price still needs an inclusion list: assembly does not establish that the garden is cleared or the room connected.
For example, Oeco separates the house electrical connection from its internal electrical work. That is a scope boundary to check, not evidence about another supplier’s package. Use the whole-project cost guide to keep building, installation and site costs distinct.
Included needs a written specification and allowance. Name the package that contains it. Priced extra needs an amount, VAT basis and scope.
Excluded means someone else must price required work. Unknown means its scope or price is unresolved. A blank is unknown, not £0.
If work is not needed, record the reason agreed after the survey. Keep a supplier’s provisional sum labelled provisional, with its adjustment basis. Put your own allowance in a separate column; it is not a supplier commitment.
Every amount below is fictional and includes VAT. These are not supplier offers, customer invoices or market estimates. Assume the same finished internal space, insulation, glazing and fit-out have been matched. Both packages include the room, assembly, standard foundations and ordinary delivery.
| Cost line | Supplier A | Supplier B |
|---|---|---|
| Building package | £18,000 | £19,000 |
| Power/data connection | £1,200 priced extra | Included; matching route and equipment confirmed |
| Site clearance and removal | £600 priced extra | £600 priced extra |
| Agreed floor finish | £400 priced extra | Included; matching finish confirmed |
| Known comparable subtotal | £20,200 | £19,600 |
| Additional foundation work | Unknown pending survey | Unknown pending survey |
A’s headline is £1,000 lower. Adding the priced work gives A £18,000 + £1,200 + £600 + £400 = £20,200; B £19,000 + £600 = £19,600. B is now £600 lower on known scope. Neither subtotal is a complete fixed project total while the foundation issue remains unresolved.
Suppose, in a second fictional step, surveys price the same additional groundworks at £500 for A and £1,200 for B. A becomes £20,200 + £500 = £20,700; B becomes £19,600 + £1,200 = £20,800. A is now £100 lower.
The example demonstrates why resolving an unknown matters. It does not predict your foundation cost or establish which supplier offers better workmanship, terms or service.
Garden room quote validity depends on the written expiry and conditions of that offer. Do not assume a universal 30-day period or that an old price survives a specification change.
| Record | Supplier A | Supplier B |
|---|---|---|
| Supplier and contact | ____ | ____ |
| Quote reference / version | ____ | ____ |
| Issued date / valid until | ____ / ____ | ____ / ____ |
| Survey date / outstanding checks | ____ / ____ | ____ / ____ |
| Internal / external dimensions | ____ / ____ | ____ / ____ |
| VAT basis / dated specification | ____ / ____ | ____ / ____ |
| Superseded version | ____ | ____ |
| Accepted version / acceptance date | ____ / ____ | ____ / ____ |
Keep original quotations alongside this comparison. If a price changes, keep both quotes and mark which one is current. Ask what must happen before expiry to retain the offer, and get any extension in writing.
For each answer record Supplier A’s term/reference: ____; Supplier B’s term/reference: ____. Confirm who can authorise an extra, how it is priced and what written approval is needed before it proceeds. A buyer’s contingency does not authorise a supplier to spend it.
Ask for comparable recent projects and verify relevant insurance and any claimed registration. Ask to see the warranty terms for the building and installation you’re being offered. Read the scope, terms and evidence alongside price; this guide does not rank or approve installers.
GOV.UK’s consumer-contract guidance explains the requirement for reasonable care and skill and the limits on terms that attempt to deny implied rights. Business contracts differ. For a specific problem, follow the government’s consumer-advice routes; this worksheet does not decide a cancellation, deposit or refund entitlement.
The downloadable text worksheet and the printable fields here use the same register, cost lines and evidence rules. Edit the file in your own text editor or document; no account or contact details are required to download it.
Project / brief version: ____. Intended use, users, visitors and equipment: ____. Finished internal size / maximum outside dimensions: ____. Construction, insulation, glazing, finishes, heating and ventilation: ____. Postcode, access and photographs: ____. Ground, power/data routes and optional plumbing: ____. Known constraints and unanswered questions: ____.
The private project planner helps you prepare these requirements. Attach the same brief and dated specification to both enquiries. Ask suppliers to identify differences, provide itemised amounts including VAT and return the four-status schedule. You choose who receives your brief; our planner does not contact suppliers.
For every supplier cell record status, amount, VAT basis, fixed/provisional basis, evidence reference/date and responsible party. Use Included, Priced extra, Excluded or Unknown. If another trade prices excluded work, identify that trade and quote separately. Do not enter the same amount again under the building package.
| Cost line | Supplier A record | Supplier B record | Buyer allowance |
|---|---|---|---|
| Building and selected finishes | ____ | ____ | A £____ / B £____ |
| Foundation | ____ | ____ | A £____ / B £____ |
| Clearance, excavation and spoil | ____ | ____ | A £____ / B £____ |
| Delivery, travel and access handling | ____ | ____ | A £____ / B £____ |
| Assembly and installation waste | ____ | ____ | A £____ / B £____ |
| Internal electrics, heating and ventilation | ____ | ____ | A £____ / B £____ |
| House power and data connection | ____ | ____ | A £____ / B £____ |
| Optional water and drainage | ____ | ____ | A £____ / B £____ |
| Making good, completion and required fees | ____ | ____ | A £____ / B £____ |
For every line add the matched requirement: ____; unresolved question: ____; person responsible / next action / date: ____. For each buyer allowance note the reason and review date. These are planning amounts you choose, not verified trade prices. Mark genuinely unnecessary work with the agreed reason; never hide it in a blank.
| Total or remaining question | Supplier A route | Supplier B route |
|---|---|---|
| Package plus priced extras | £____ | £____ |
| Required excluded work priced by other trades | £____ / quote refs ____ | £____ / quote refs ____ |
| Known comparable subtotal | £____ | £____ |
| Supplier provisional sums within that subtotal | £____ / adjustment basis ____ | £____ / adjustment basis ____ |
| Required work still unpriced | List ____ | List ____ |
| Separate buyer allowance subtotal | £____ / assumptions ____ | £____ / assumptions ____ |
A known subtotal containing provisional sums can still change. A complete fixed project total is not established while required work is unpriced or subject to unresolved adjustments. Keep buyer allowances separate; do not relabel subtotal plus contingency as a fixed quotation.
Before choosing, return to the quote register and commercial checks above. Resolve the foundation assumptions, access constraints and service responsibilities. If plumbing is proposed, complete the toilet feasibility questions before accepting a services allowance.
Check the document’s scope, assumptions and status, not just its title. A configurator can price selected options without resolving access, ground conditions or final connections on your plot.
A starting figure for a configuration or assumed job. Record the date and what remains to be checked.
A written offer for stated work. Identify survey conditions, exclusions, provisional sums, expiry and any specification differences.
Site findings are priced or explicitly resolved, responsibilities agreed and the accepted version recorded. Check remaining conditions before treating the total as fixed.
Noah describes its configurator result as an instant guide price; its team checks a submitted design before preparing a formal quotation. That supplier’s distinction illustrates why an online total should not be assumed to include every site cost. We have not submitted a design or obtained a quotation.
Our private planner prepares a requirements brief. It has no supplier pricing engine, sends no enquiries and does not provide an instant installation quote. Keep the downloaded comparison alongside your brief and request quotations directly. The Bristol supplier guide provides independent contact routes; no supplier referral agreement is in place.
Before comparing final offers, record Supplier A document status: ____; Supplier B document status: ____ (guide estimate, quotation with conditions or surveyed scope). Notes and unresolved differences: ____; person responsible / next review date: ____.
Garden Building Guide checked the linked primary sources on 20 November 2026. The A/B comparison is an original fictional teaching example with VAT-inclusive figures and matched-specification assumptions, not real quotations, customer invoices or a market-price estimate. The blank worksheet separates supplier evidence, provisional sums and buyer allowances. No supplier was contacted, no design submitted and no workmanship inspection or supplier approval undertaken. Obtain dated, site-specific written scope and terms before relying on a price.