What does installed include?
Check the building, base, delivery and assembly separately. Ground preparation, final connections and making good may remain outside the package.
See the complete cost stackPlan the complete project
Compare room prices, identify extra work and build your budget. These dated examples are not quotations for your garden.

At a glance
Check the building, base, delivery and assembly separately. Ground preparation, final connections and making good may remain outside the package.
See the complete cost stackMatch finished internal dimensions and the written specification. A smaller headline price can describe less space, fewer fittings or different site work.
Read the price and scope ledgerUse the same area definition. The same £17,325 offer works out at £1,443.75 per external m² or about £1,734.23 per internal m².
Check the calculationStart with a room that meets your intended use, then add each part of the work needed to use it on your plot. A pod, office or garden room label does not define an installed price.

| Budget line | Specify and price | Keep visible |
|---|---|---|
| Building | Model, finished internal size, outside dimensions, glazing, insulation and finishes. | VAT basis and the exact configuration behind a starting price. |
| Ground and foundation | Survey, clearance, removal of an old structure, excavation, base and spoil disposal. | A foundation inclusion does not establish that all preparation is included. |
| Delivery | Postcode coverage, travel, unloading, parking and the route into the garden. | Extra handling for narrow access, steps or restricted working space. |
| Assembly | On-site construction, selected fit-out, finishing and installation waste removal. | Any work left to you or a separately appointed trade. |
| Internal electrics and comfort | Sockets, lights, controls, heating, ventilation and any cooling provision. | Package allowances, selected upgrades and the intended loads. |
| Final services | House power, data, any water and foul drainage, routes, trenching and testing. | Connection capacity, distances, reinstatement and completion records. |
| Completion and use | Decorating, furniture, access steps/decking, making good and applicable application costs. | Responsibilities, allowances and unresolved survey findings. |
Ask for two prices: one for fittings inside the room and one for connecting the room to the house. Ask for the supply assessment, route, installation work, trenching, testing and reinstatement to be priced explicitly. Include data separately unless it is clearly part of that offer. Our electricity and broadband guide helps you describe those requirements without guessing a cable specification or a universal connection price.
Installation cost is also more than assembly labour. Postcode, access and ground conditions can change the scope. Use the access worksheet and foundation survey questions before treating an advertised installed figure as complete.
Price the complete floor, wall and roof construction, glazing, heating and ventilation. Describe winter occupancy, summer sun and the equipment used inside. An insulation label or heater inclusion alone does not establish comfortable year-round use or a running-cost figure.
Keep the construction budget and ongoing energy/maintenance budget separate. Ask suppliers to identify the proposed equipment and supporting performance information; do not assume that two insulated rooms offer equivalent comfort or operating costs.
Reduce the footprint only after testing the desk, occupied chair and storage. A cheaper small office pod that cannot accommodate your working day is not a useful saving. Compare its complete scope with the next suitable size.
Test the usable spacePrepare a materials and labour schedule, including tools, deliveries, waste, unfinished work and trades you will appoint. Record your own time separately. A kit price cannot demonstrate the saving against a finished, connected room.
Separate supplied and installed scopeAsk what design, unusual shape, glazing, finish or site constraint changes the quotation. Compare a standard configuration that meets the same need before deciding whether the bespoke features justify their cost.
Compare the written specificationCompare the projects you would actually build: a detached room and an attached orangery can involve different work to the existing house, structure, services, finishes and approvals. Obtain two quotations with usable size and complete scope identified. These garden-room offers cannot establish a numerical saving against an unquoted orangery.
UK costs also depend on location and the actual property/use checks. Ask the relevant authority what the proposal needs; our permissions starting points distinguish the UK nations. Include any required advice or application work in the budget.
This is a small ledger of published offers checked on 20 November 2026. The buildings are different sizes and specifications, so the figures are not a cheapest-to-best ranking. Use the same scope questions to obtain genuinely comparable quotations.
| Supplier and source | Published price | Size basis | Offer status |
|---|---|---|---|
| SDPH Porto | £9,980 including VAT. | 2.75 × 2m advertised; internal/external basis unspecified. | Promotional free-installation slots advertised. Confirm availability. |
| Little Green Rooms | £17,500 including VAT. | 2.3 × 2.5m external; internal size unconfirmed. | Guide price, subject to survey. |
| Garden Rooms and Lodges Eclipse | £17,325 including VAT. | 4 × 3m external; 3.7 × 2.7m internal. | Published starting example; confirm selected finish and site scope. |
| Oeco Premium Office, Cube | £16,524 advertised sale price. VAT treatment unconfirmed beside that headline. | Exact starting configuration and internal size to confirm. | Offer stated for orders before 30 November 2026. Recheck current terms. |
SDPH’s page also contains seasonal sale wording and describes installation as ordinarily £600–£1,200 but currently free. Obtain the selected price and installation terms together; do not subtract another promotion from the headline. Oeco’s unconfirmed VAT basis prevents treating its number as equivalent to the VAT-inclusive figures above.
Included below means stated in the selected source, not independently tested. Confirm means the checked page does not establish the complete inclusion; it does not mean the work is free or necessarily excluded.
| Work package | Porto | Little Green Rooms | Eclipse | Oeco Premium |
|---|---|---|---|---|
| Foundation | Base offered; confirm inclusion and price for Porto. | Site-appropriate foundation included. | Foundation stated included. | Foundation stated included. |
| Delivery and assembly | Installation promotion; postcode/delivery terms to confirm. | Eligible local installation; travel conditions below. | Request itemised installation and postcode scope. | On-site installation and UK mainland delivery stated included. |
| Inside electrics and heat | Integrated electrics; heater scope to confirm. | Lights, sockets and heater included. | Heating stated; electrical details to confirm. | Internal electrical pack; selected heater/offer scope to confirm. |
| House power and data | Hard-wired connection separately quoted; confirm data. | Standard connection separately priced; conditions below. | Not established by the listing. | House connection separate; confirm data. |
| Other site work | Obtain a surveyed scope for clearance, access, excavation, spoil, service routes and making good. None of these headline figures establishes every cost on your plot. | |||
The Little Green Rooms price guide gives this example for its 2.3 × 2.5m external room. Both amounts include VAT.
Both figures include VAT; source checked 20 November 2026. The selected connection conditions still apply.
Your complete project total is not established. Keep survey findings, upgrades and other unpriced work separate. An unknown cost is not zero.
| Budget item | Amount | Evidence status |
|---|---|---|
| Room | £17,500 | Published supplier figure. |
| Standard power/data connection | £950 | Published supplier figure; conditions apply. |
| Known example subtotal | £18,450 | Supplier’s stated example, not a customer’s paid invoice. |
| Survey findings and selected extras | Unpriced | Resolve for the actual site; do not enter zero. |
| Your complete project total | Not established | Cannot be calculated while required work is unpriced. |
Price-guide assumptions: under one hour from BS7 8TL; standard connection within 30m of the source; survey qualification; no upgrades or extra site work. Furniture, decking and any required application work also need budgeting.
The price guide specifies 30m; the FAQ says 40m. The price guide’s VAT-inclusive travel charges are £750 for 1–2 hours, £1,500 for 2–3 hours and a quotation beyond three hours. The FAQ instead states £1,500 for more than two hours.
These discrepancies remain unresolved by supplier contact. This worked example follows the price guide. Ask for the connection allowance, measured route, travel band and any additional work in the selected written quotation.
For small garden office pod prices, the Porto provides a dated compact example, but its usable internal dimensions and base inclusion still need confirmation. A lower advertised amount cannot identify the cheapest usable office until those gaps and final services are resolved.
To investigate cheaper options, ask suppliers to price the same essential brief with and without discretionary features. Keep any saving separate from work deferred to another trade or to yourself. We have not established a universal budget band, a matched market minimum or a bespoke/DIY saving from these four offers.
The area underneath the division matters as much as the price on top. Use finished internal area to understand usable space, and keep the same cost scope in every calculation.
The Eclipse listing states £17,325 including VAT, 4 × 3m externally and 3.7 × 2.7m internally. Using that one published offer:
4 × 3 = 12m².
£17,325 ÷ 12 = £1,443.75 per external m².
3.7 × 2.7 = 9.99m².
£17,325 ÷ 9.99 ≈ £1,734.23 per internal m².
The room and price have not changed. Only the area basis has. These calculated rates describe the published offer, not a complete surveyed installation. They cannot be used to price an arbitrary larger room by multiplication.
Do not calculate an internal-area rate for Porto, Little Green Rooms or Oeco from the advertised dimensions above: the necessary finished internal measurements are not established in this ledger. Request a dimensioned drawing and test furniture, door movement and any partitions before deciding how much of that area is useful.
For a fair two-quote comparison, use the same finished internal dimensions, specification and identified project costs. If one quote excludes a connection or has an unresolved allowance, keep that difference visible beside its rate. Our usable-size guide explains the difference between room dimensions and space around it.
Copy this worksheet into your own document or print the page. Give each amount an evidence label and a person responsible for resolving it.
A dated supplier price or option. Record the source and conditions; it is not yet your site quotation.
A supplier or trade’s price for the stated scope. Record its date, VAT, exclusions, validity and survey assumptions.
A provisional amount you choose while work remains unresolved. Keep it labelled and replace it with evidence; it is not a verified trade cost.
| Line to complete | Amount / VAT basis | Evidence, owner and unresolved scope |
|---|---|---|
| Selected building and fit-out | £____ / ____ | Model, internal size, included work: ____ |
| Preparation and foundation | £____ or included in ____ | Survey, access, excavation, spoil: ____ |
| Delivery and assembly | £____ or included in ____ | Postcode, travel and site conditions: ____ |
| Power, data and other services | £____ / ____ | Connection routes, trades and reinstatement: ____ |
| Comfort, finishes and furnishings | £____ / ____ | Heating, ventilation, decoration and equipment: ____ |
| Approvals, site extras and making good | £____ / ____ | Required work, decision and responsible person: ____ |
| Additional allowance you choose | £____, labelled provisional | Reason, remaining uncertainty and review date: ____ |
| Known subtotal | £____ | List any unpriced requirements beside it: ____ |
Add each cost once. If the room price includes its heater, foundation or assembly, mark the relevant line included rather than adding a second amount. Use a consistent VAT basis; ask the supplier to resolve an ambiguous price rather than silently adding or removing tax. This worksheet does not assess VAT recovery or tax treatment.
Before ordering, reconcile scope with the two-quote comparison guide. Confirm payment stages, quote validity, cancellation/change terms, guarantees, who authorises extras and what handover records you will receive.
The private planner records your requirements and questions; it does not calculate an installation quotation or contact suppliers. Keep this budget worksheet alongside the brief. If the project needs plumbing, use the toilet feasibility guide before accepting a services allowance.
Garden Building Guide checked the linked supplier pages on 20 November 2026. The ledger is a small sample of unmatched published offers, not a market average, price ranking, workmanship inspection or set of customer invoices. The Little Green Rooms example is attributed to its price guide and retains conflicting FAQ conditions. The area calculations use the dimensions in the Eclipse listing. No supplier referral agreement is in place. Check current prices and promotions, then ask for a dated quote for your plot that says whether paving and landscaping are included.