Put the structure, covering, edges and rainwater route side by side. Ask the supplier to mark each one on its drawing.
Mark the structure and deck, insulation position, covering, edges and penetrations, and gutter or outlet. Show where water leaves the roof. A brick garden room still needs a separately designed roof and a drawn wall-to-roof junction.
Low-slope membrane roof
Elevate RubberCover EPDM is the membrane example here. Ask for a designed fall, support, substrate, edge and outlet drawing. Open full-size diagram
The elevation marks the supported roof edge. In the plan, normal runoff travels towards the outlet and downpipe. Ask the designer to identify the receiving point and separately show where overflow would go. Check substrate compatibility and details at corners, trims and pipe openings. Elevate’s UK RubberCover guidance.
Pitched tiled roof
Marley smooth Edgemere 2.0 is the tile example here. Ask for support, ridge, verge, eaves and gutter details. Open full-size diagram
The ridge divides runoff between the eaves. Mark each gutter, downpipe, receiving point and overflow route. Marley’s smooth Edgemere 2.0 table pairs a minimum pitch of 22.5° with 75 mm headlap and 17.5° with 100 mm headlap. These are figures for that tile. Ask the designer to specify the pitch, headlap and support for the actual roof. Marley Edgemere 2.0 technical table.
For EPDM versus felt, write down the exact product and system in each quote. Compare how the installer proposes to finish corners, outlets, seams and pipe openings, who supplies the warranty and whether it covers labour. An EPDM membrane and a reinforced-bitumen roofing system may carry very different obligations even when the quotes use the same words about durability. Ask for the proposed assemblies’ fire, load and moisture evidence where relevant. BMI’s examples of different labour and product cover.
Ask the installer for the care sheet for the exact roof system. Elevate’s UK RubberCover EPDM FAQ recommends a yearly roof inspection for that named product. Ask who will check the outlet and edge details, how often, and how they will arrange safe access. Record gutter, trim and debris checks as separate items in the care schedule. Treat any surface that requires roof access as a task for someone competent to assess it. Elevate’s named-product maintenance guidanceHSE fragile-roof guidance (Great Britain)HSENI roof-work guidance (Northern Ireland).
Follow the water beyond the downpipe
Find out who owns each connection. Ask where rainwater normally goes and what happens if the outlet blocks or the storage fills.
Trace the intended water route and document the overflow separately. The drawing leaves the receiving point for the site design. Open full-size diagram
Follow the water on paper from the roof to the gutter or outlet, through the downpipe, then to the agreed receiving point. Ask what happens when a leaf blockage or very heavy rain sends water past the usual route. If the quote ends at the downpipe, ask who finishes the next section and how it will be priced.
A water butt fills. Draw the connection for its overflow as well as the storage inlet. Ask for the basis of any proposed soakaway or connection and identify who confirms capacity, suitability and consent locally. Observe from the ground after rain and record any repeated overflow, discharge near the base or water that runs towards an adjoining plot.
Give the designer the roof area, local rainfall context, ground conditions and any existing connection records. Leave capacity and any necessary permissions open until the receiving point is confirmed. Keep your observations to safe ground-level viewpoints.
Example scope check
Quote A ends at the downpipe. Final connection and overflow are unpriced. Ask the supplier to mark where its work stops and confirm who will design and price the remaining connection.
Roof and rainwater maintenance checklist
Identify the system. Record the roof type, product, drawing revision, care sheet and warranty.
Trace normal runoff. Mark the gutter or outlet, downpipe and visible water route. Name who will confirm the receiving point, capacity and permission.
Record overflow separately. Note the proposed route if a gutter blocks or a water butt fills.
Keep a ground-level record. Note date, rainfall, viewpoint and any repeated overflow or discharge near the base. Ask a competent person to inspect hidden details or work at height.
Assign the care tasks. Record gutter, outlet, trim and debris checks separately. Enter the product-specific inspection interval, next date and who arranges safe access.
Keep quotes comparable. Record exclusions, VAT and the approval point for concealed deck repairs.
Example inspection entry. Elevate recommends a yearly roof inspection for RubberCover EPDM. Confirm the care guide for your installation, name the competent inspector and agree safe access. Record gutter and outlet checks separately. Manufacturer’s inspection note.
Ask the designer to identify the existing build-up before changing insulation, vents or the roof covering.
Cold roof
The insulation sits below the deck. Ask where the roof void is, how any designed airflow passes structural obstructions, and how air and vapour control is detailed around the ceiling and edges. Have the existing strategy assessed before sealing any vents.
Warm roof
The main insulation is above the deck. A conversion or overlay needs an assessment of what will be retained, compatibility and moisture risk. Ask how a change in build-up affects roof height and junctions.
Fresh air for a person working in the room is a separate design decision. A wall grille or open window does not demonstrate airflow through a roof void. Before insulating or sealing an existing roof, get the present build-up identified and a designer’s drawing of what will change.
What should the roof survey establish before you ask for a repair price?
Before you ask for a price, tell the surveyor where the roof seems to leak and what you know about the deck underneath.
Ask the surveyor to establish the likely leak path, deck condition and whether the materials are suitable for a local repair, compatible overlay or strip and replacement. An expected membrane life is a product claim. The service life of this roof also depends on the deck, junctions, drainage, workmanship, access and inspection history.
For a replacement cost, ask each contractor to price access, temporary weather protection, removal and disposal, waterproofing and edge details, drainage work and reinstatement. Ask for a separate provisional amount for repairs to the deck that can’t be seen yet. Agree when the contractor must get approval to do them. Compare totals including VAT and record every excluded item. A matched installed price is still needed for your roof.
Ask what the survey established and what remains concealed. Confirm whether the quote is for repair, overlay or replacement.
Request separate lines for access, temporary protection, removal, disposal, deck work, waterproofing and trims, insulation or moisture work, drainage and making good.
Record net cost, VAT, total, exclusions, the variation approval point and written care and warranty documents.
We compared dated UK manufacturer information and official guidance with the questions readers can take to a designer or installer. England is the scope for Approved Document C and HSE guidance applies in Great Britain. The diagrams compare questions and deliberately omit fixing details, structural sizes and a universal layer sequence. A project-specific moisture strategy, structural and drainage design, safe access plan and matched replacement quotes still need confirmation.