GARDEN BUILDING SITE-SURVEY WORKSHEET Blank buyer information record — not a technical design or approval. Keep this sheet with the dated drawing, route sketch and photographs it refers to. For EVERY entry record: measured / supplier-stated / assumed / unknown; units; evidence date and source; who will confirm it and when. Write ‘unknown’ for a measurement or cost you haven’t confirmed. Only enter zero if it’s the measured value or the confirmed cost. 1. RECORD AND EVIDENCE Visit date: ______ Recorded by / broad site reference: ______ Drawing or photo reference and revision: ______ Status / units / evidence date and source: ______ Responsible person / next action / due date: ______ 2. USE AND OCCUPANCY Activities, people, equipment and hours of use: ______ Seasonal use: ______ Changes to discuss: ______ Status / units / evidence date and source: ______ Responsible person / next action / due date: ______ 3. OUTSIDE ENVELOPE Proposed outside width × depth and overall height, with units: ______ What those dimensions include: ______ Roof projection / maintenance space to check: ______ Status / units / evidence date and source: ______ Responsible person / next action / due date: ______ 4. REQUIRED INTERNAL SPACE Finished usable width × depth and ceiling height: ______ Desk or equipment rectangle and movement space: ______ Supplier drawing / office-checker assumptions: ______ Status / units / evidence date and source: ______ Responsible person / next action / due date: ______ 5. OPENINGS AND PLOT Door position, clear opening, swing, thresholds and window positions: ______ Boundaries, trees, drains, existing structures and retained access: ______ Status / units / evidence date and source: ______ Responsible person / next action / due date: ______ 6. GROUND AND BASE Visible surface and level changes; existing base facts: ______ What cannot be established by this visit: ______ Who will assess suitability and drainage: ______ Status / units / evidence date and source: ______ Responsible person / next action / due date: ______ 7. COMPLETE DELIVERY ROUTE Unloading point, narrowest clear width and height with units, turns, steps, slopes and total carry: ______ Route photos / sketch: ______ Handling, protection or neighbour permission still to agree: ______ Status / units / evidence date and source: ______ Responsible person / next action / due date: ______ 8. POWER, DATA, WATER AND DRAINAGE Wanted services and likely endpoints: ______ Route surfaces and measured / assumed distances: ______ Separate power and router-to-desk data questions: ______ Capacity, feasibility and responsible trades still to confirm: ______ Status / units / evidence date and source: ______ Responsible person / next action / due date: ______ 9. PERMISSIONS AND RESTRICTIONS Nation / local authority and actual intended use: ______ Known planning, building-control, landowner or title questions: ______ Responsible person and next enquiry: ______ Status / units / evidence date and source: ______ Responsible person / next action / due date: ______ 10. SCOPE, COST AND NEXT ACTION Supplier inclusions / exclusions and VAT basis: ______ Buyer budget: ______ Unpriced items, evidence needed, responsible person and due date: ______ Status / units / evidence date and source: ______ Responsible person / next action / due date: ______ EXAMPLE OF LABELLING UNCERTAINTY — ENTIRELY FICTIONAL Outside width 3.2 m, assumed for discussion; finished inside width unknown; supplier drawing requested. This is not a recommended room size. USING THIS RECORD Add the relevant observations to your planner answers. Generate a fresh brief, check it, then decide whether to copy, download or share it. The brief's device date records generation, not the date of this survey or the evidence above. Your buyer budget is not a cost estimate. Ask suppliers to itemise VAT, scope, exclusions and unpriced work, and to confirm feasibility and responsibilities in writing. This sheet does not establish safe handling, ground suitability, service design, planning permission or building-control approval. The worksheet does not submit or save your answers to the website. If you edit or share this downloaded file, manage those copies separately from any saved planner answers in your browser.