List what must keep running on a short winter workday and for how long. Work out the heating demand separately so you can see what happens to the battery requirement when the heater comes on.
Office equipment. Laptop 50 W × 6 h, screen 25 W × 6 h, router 10 W × 8 h and lights 18 W × 3 h use 584 Wh in a day.
Office plus two hours of heat. A 1 kW resistance heater at full draw adds 2,000 Wh and brings the day to 2,584 Wh.
Both examples use assumed loads and exclude system losses. Watt-hours measure energy over the day. Watts measure how much power equipment draws at a given moment. Record the maximum loads that can run together and any start-up demands separately. Include equipment on standby. Mark what must keep running and what you could switch off or use later.
Give each bidder the same schedule. Compare a mains cable to the office, grid-assisted solar and a standalone system to see which can cover the same hours of work and heat.
List the equipment you expect to run
Record measured watts where available. Use the fields as temporary notes, or download the editable worksheet to keep and share a copy.
50 W × 6 h + 25 W × 6 h + 10 W × 8 h + 18 W × 3 h = 584 Wh. __________
Timed heat example
Add assumed 1,000 W × 2 h = 2,000 Wh. Total 2,584 Wh before losses. __________
Device 1
Name; watts; start/stop; standby; peak; Wh; essential or can switch off.
Device 2
Name; watts; start/stop; standby; peak; Wh; essential or can switch off.
Device 3
Name; watts; start/stop; standby; peak; Wh; essential or can switch off.
Device 4
Name; watts; start/stop; standby; peak; Wh; essential or can switch off.
Device 5 or extra loads
Name; watts; start/stop; standby; peak; Wh; essential or can switch off.
Simultaneous power
Record time, equipment and peak W including any start-up demand.
Daily energy
Add timed Wh and standby Wh. Record essential and switch-off loads separately.
Winter work schedule
Hours of required work and heat, longest acceptable outage and fallback.
Check winter supply and backup
How much power will you have with and without heating, and after several dull days?
Winter office only. Can essential equipment run throughout the workday?
Office with scheduled heat. What changes when the heater and office equipment run together?
Several low-output days. What goes off, when, and what is the fallback?
Use winter daylight, the measured roof and shade record, and an hourly load schedule. Ask for the usable battery energy above the minimum reserve, the losses allowed, and hours when an essential load goes unmet. Enter generation estimates once a designer supplies a named model and inputs.
Winter office only
Hourly load
Record start and stop times for laptop, display, internet and lighting.
Hourly generation
Coventry PVGIS illustration: 1.07 kWh/day in December and 3.95 kWh/day in June. Actual hourly output ________ Wh.
Battery reserve
Record starting usable energy, cutoff and remaining reserve at close.
Lost load and fallback
Record hours and equipment affected. Agree when to use the indoor workspace.
Office with timed heat
Hourly load
Add planned heat-up and holding times, concurrent peak and cold-day assumptions.
Hourly generation
________ Wh by hour
Battery reserve
Record remaining reserve after both heating periods and whether it recovers.
Lost load and fallback
Agree whether heat can be deferred, how long the office can be used and when to change workspace.
Several low-output days
Time series
Use consecutive winter days. Show how loads and the battery change hour by hour.
Hourly generation
________ Wh by hour
Battery reserve
Report the starting reserve, lowest level and timing of recovery.
Lost load and fallback
Agree the longest tolerable interruption, which loads are lost, and when fallback begins.
PVGIS documents separate off-grid inputs including battery capacity, the cutoff, daily energy and hourly consumption. Ask which tool version, weather inputs and shade model your designer used. A Coventry household case describes importing electricity mainly in winter on an overnight rate, a feature of its grid-backed setup. JRC PVGIS documentation · Energy Saving Trust case
Coventry solar example for an office and timed electric heat
For a Coventry point (52.41° N, 1.51° W), JRC PVGIS 5.3 models a hypothetical 1 kWp crystalline-silicon array facing south at 35° with 14% system losses and the default terrain horizon. Its 2005–2023 SARAH3 radiation series and ERA5 meteorology give 33.08 kWh in an average December and 118.39 kWh in an average June. These are about 1.07 and 3.95 kWh per calendar day respectively, before modelling a battery, its additional losses or local shading. JRC Coventry model inputs and output
Office only. Compare the illustrative equipment load of 0.584 kWh on a working day with the December average. Only an hourly model can show whether it arrives when needed or can be stored until then.
Office and two hours of heat. A heater drawing 1 kW throughout those two hours adds 2 kWh. The combined demand of 2.584 kWh is about 1.52 kWh above the model’s average December day before storage losses. The June average would hide that winter gap.
Two days with no generation. An illustrative worst-case input gives 1.168 kWh for two office-only days, or 5.168 kWh for both heated days. Ask the designer to show battery energy above cutoff at the start, power and cold-weather limits, hourly shortfall and what happens when the reserve reaches cutoff. Record the separately authorised mains backup or when you would switch to an indoor workspace.
These calculations compare demand and indicative generation. Ask a qualified designer to confirm the actual shade, equipment, protection and usable reserve in an hourly standalone model.
Get a complete system quotation
Send measured roof area, orientation, pitch, seasonal shadows, the proposed equipment position, timed loads and acceptable outage window. Ask for the output by hour and the effect of a colder day, heavier heat demand and additional shade. Compare installation, groundworks, maintenance and expected replacement across the same work schedule.
Agree who assesses the roof and wind loads, electrical design and protection, isolation, access, ventilation, equipment environment and handover documents. Victron’s Lithium NG 51.2 V manual specifies a +5 °C lower charging limit for that family. Ask your designer how the selected equipment will operate in the proposed storage location in winter. Victron product manual, operating conditions
The device examples use assumed wattage and time. Generation, battery reserve and missing-load hours need a location-specific model and qualified design. We checked the JRC model documentation, the Energy Saving Trust case and the named battery manual.
JRC PVGIS off-grid model inputs — The JRC describes separate grid-connected and standalone calculations. The latter uses PV size, battery energy, cutoff, daily consumption and optional hourly consumption. Checked 21 November 2026.
Energy Saving Trust Coventry solar and battery case — The household reports importing grid electricity mainly in winter and using its overnight rate. The case concerns a grid-connected house. Checked 21 November 2026.
Victron Lithium NG 51.2 V operating conditions — The manual allows charging from +5 °C for this named battery family. Select and assess equipment for the actual storage environment. Checked 21 November 2026.
JRC PVGIS 5.3 Coventry scenario — Official PVcalc model with named coordinates, radiation and weather sources, mounting and loss assumptions, and monthly means. The output has no battery or observed site generation. Checked 21 November 2026.