Plan shared use

Multi-use garden offices

When work finishes, where will the chairs and laptops go so there’s room for the mat? Draw each activity as you’ll actually use the space, including any that happen together, before you buy a room or add a partition.

Sources checked 21 November 2026

Two desks and office chairs in a garden room with a clear doorway.

At a glance

Make the room work at each time of day.

Give each item a destination

Record where the chair, laptops and mat go during setup and reset.

See the move order

What stays in the room when the activity changes?

Draw the room in each state you actually need. A desk in use includes a seated person and the space to pull back, turn and leave. A hobby bench can include a workpiece that extends past the top, somewhere to dry a project and a separate place for tools. Dirty, dusty or fume-producing work needs its own suitability and ventilation checks before you plan to share a room with desks or books.

Example time and use matrix
Use and timeWhat changes and what to check
Two people working, weekday morningsOccupied state
Two desks, both chairs in use, possible overlapping calls
Changeover and storage
Both laptops on desks. Mat in house cupboard H3
Decide before buying
Check how both people reach the door and what each microphone picks up
Two-person meeting, Tuesday afternoonOccupied state
Both chairs face each other at the first desk. Second desk unoccupied
Changeover and storage
Take the first laptop set and notebook to H1. Hold C1 aside before moving the empty desk. Leave L2 closed on D2 and the mat at H3
Decide before buying
Check the chair holding position, empty-desk handling and speech privacy
Handcrafts, weekendsOccupied state
Bench, task light and space for the largest workpiece
Changeover and storage
Box work supplies and place unfinished craft on a dedicated shelf
Decide before buying
Define drying, cleaning and storage so the next work session can start
Reading or library use, eveningsOccupied state
Chair pulled out, shelf approached with a book in hand
Changeover and storage
Leave reading area set up if the shelf and chair clear work and exit routes
Decide before buying
Check book loads, anchoring into suitable backing and exposure to sun and damp
Seated games, eveningsOccupied state
People around a table or sofa, with cables and controls in use
Changeover and storage
Pack controls and leave the route clear
Decide before buying
If you want table tennis or pool, draw the specific equipment open and in storage, with a separate movement check
Yoga, after work or a meetingOccupied state
Mat out, both desk chairs parked
Changeover and storage
Store laptop sets at H1 and H2. From work, leave both desks at the wall. From a meeting, hold C1 aside before returning D1 to the wall. Fetch the mat from H3 and return it there when resetting for work
Decide before buying
Test both changeovers, overhead reach and room to move
Play, weekend morningsOccupied state
Play equipment in use with an adult present
Changeover and storage
Pack toys out of routes and secure furniture and cables
Decide before buying
Check supervision, opening and trip hazards. Schedule quiet calls elsewhere if play overlaps

The Manduka PRO standard mat example is 1.80 × 0.66 m. This is the mat footprint. Check your reach and movement around it. Manduka PRO comparison, 21 November 2026 evidence

For larger games, draw the equipment open, in use and in storage. Cornilleau lists the 500X open at 274 × 167 × 76 cm excluding the net. Two manufacturer sheets for the same Blue 113100 and Black 113400 models disagree about storage. In broad span × narrow depth × height order, the individual sheet shows 167 × 75 × 155 cm and the range comparison shows 165 × 75.3 × 155.5 cm. Ask for the current exact-model folded drawing before sizing storage or an access route. Allow separately for moving, unfolding and playing around the table. UK product specification, rechecked 21 November 2026, Individual sheet, 21 November PDF inspection, Range comparison, 21 November PDF inspection

Record your own changes in the setup and reset sequence.

Two workers and meetings

Both desks stay in the room. The chairs, laptops and mat change places when work ends.

The same office with the chairs parked to one side and the mat unrolled.

Three concepts use the same fictional 4.80 × 3.00 m finished interior, an area of 14.40 m². The two example desks each measure 1.20 × 0.60 m. Each chair’s published parked bounds are 0.71 × 0.71 m. The dashed areas are reservations for the example. Test the actual occupants and furniture in place, including standing up, backing away, walking out and opening the door. IKEA desk, rechecked 21 November 2026, IKEA chair, checked 20 November 2026

Two workers. Both desks face the top wall, with one chair reservation behind each desk. Check the view from each video camera, light on both screens and whether one person can walk out while the other is seated. Use the HSE workstation checklist to assess the real workstations, tasks, lighting and users where it applies. It supplies questions for assessment. HSE DSE checklist, checked 20 November 2026

Meeting instead of desk work. Both people sit on opposite sides of D1. D2 stays in place and work there pauses. If someone needs to keep working or visitors need a separate route, draw that occupancy before ordering. A separate meeting room needs a door, its own usable space and service checks.

Mat use. Both desks are at the wall and both chairs are parked together. Test overhead space and movement beyond the mat footprint in the actual room.

A. Two people working

Check movement with both desks occupied

Fictional room plan showing both people seated at their respective desks, shelving on the right and the door swing at the bottom.
Desk work at both stations. The dashed areas combine an assumed seated person and chair. Open full-size diagram
B. A meeting replaces desk work

Check both approaches to the meeting desk

The same room with the first desk moved into the left area, a chair on each side and the second desk unoccupied.
The first desk becomes the meeting table. Work pauses at the second desk. Open full-size diagram
C. Clear down for mat use

Check movement around the mat

The desks are back at the wall, both chairs are parked to the left and the mat sits inside an illustrative activity reserve.
The chairs park to the left and the mat occupies the centre. Test reach separately. Open full-size diagram

Read the plans as coordinates

Use metres from the top-left inside corner, with x to the right and y down. The 4.80 × 3.00 m room, shelving, glazing and door geometry stay fixed. The shelf S starts at (4.41, 0.15) and is 0.39 × 0.765 m in plan. Top glazing runs from x = 1.55 to 2.25 m. P1 and P2 mark proposed power/data at x = 0.15 and 3.85 m along that wall. The bottom wall opening runs from x = 3.55 to 4.45 m, with a hinge at (4.45, 3.00). The 0.90 m inward leaf ends at (4.45, 2.10). The arc marks its sweep. Effective clear passage remains unknown.

Positions and product bounds in the three states
Room stateCoordinates and dimensions
A. Two people workingD1 (0.200, 0.100), 1.20 × 0.60 m
D2 (2.500, 0.100), 1.20 × 0.60 m
C1 (0.445, 0.800), 0.71 × 0.71 m
C2 (2.745, 0.800), 0.71 × 0.71 m
L1 (0.450, 0.260), 0.32 × 0.22 m
L2 (2.750, 0.260), 0.32 × 0.22 m
R1 reservation (0.300, 0.700), 1.00 × 1.10 m
R2 reservation (2.600, 0.700), 1.00 × 1.10 m
U1 and U2 face the top wall.
B. A meeting replaces desk workD1 (0.400, 1.200), 1.20 × 0.60 m
D2 (2.500, 0.100), 1.20 × 0.60 m
C1 (0.645, 0.350), 0.71 × 0.71 m
C2 (0.645, 1.950), 0.71 × 0.71 m
L2 (2.750, 0.260), 0.32 × 0.22 m
R1 reservation (0.450, 0.150), 1.10 × 1.05 m
R2 reservation (0.450, 1.800), 1.10 × 1.05 m
U1 and U2 face one another across D1.
C. Clear down for mat useD1 (0.200, 0.100), 1.20 × 0.60 m
D2 (2.500, 0.100), 1.20 × 0.60 m
C1 (0.200, 1.000), 0.71 × 0.71 m
C2 (0.200, 1.850), 0.71 × 0.71 m
Activity reservation (1.100, 1.000), 2.30 × 1.80 m
Mat footprint (1.350, 1.600), 1.80 × 0.66 m
Both chairs are unoccupied. The mat footprint is 1.188 m².

The dashed areas in A and B include both the chair and an assumed seated person. The dashed area in C is an illustrative activity reserve. Test all movement and occupied space in the actual room.

Move the chair before the desk

D1 is the first desk and C1 is its chair. The chair and desk change places on overlapping pieces of floor. Both people stop and stand clear while the furniture moves. In this example, move the empty chair C1 to a temporary holding position between the desks before moving D1. The holding rectangle is 0.71 × 0.71 m, with its top-left at (1.70, 0.35) m. Coordinates run from the top-left inside corner of the room, x to the right and y down. That rectangle sits 0.10 m beyond the furthest right edge of the drawn D1 move and 0.09 m short of D2. It stays clear of the drawn door swing. These are separations between drawn object footprints. Check the actual unloaded desk, chair turning, people, handling space and usable doorway before attempting the sequence.

A to B · Work to meeting

Stop work at both desks. Empty D1 and take L1, its adapter, disconnected lead and notebook to house desk H1. Close L2 on D2 and keep its lead clear of the move. Move C1 to the holding position, move the unloaded D1 to the meeting position, then move C2 and C1 to opposite sides. Leave the mat in house cupboard H3.

B to C · Meeting to mat

Leave the first laptop set and notebook at H1. Take L2, its adapter and disconnected lead to house desk H2. Clear D1 and put C1 in the holding position. Return unloaded D1 to the wall, then park C1 and C2 to the left. Fetch the mat from H3 after the moves are complete.

A to C · Work straight to mat

Both desks are already at the wall and stay there. Take the first and second laptop sets, with disconnected leads, to H1 and H2 respectively. Take the first desk’s notebook to H1. Park both chairs, then fetch the mat from H3.

C to A · Reset from mat use

Roll the mat and return it to H3. Reset C2 and C1 at their desks. Bring the first laptop set and notebook from H1 to D1 and the second laptop set from H2 to D2. Reconnect and arrange the leads for work and check the route before both people sit down again.

B to A · Reset from a meeting

Leave the mat in H3. Clear D1, hold C1 aside, return C2 to its work position, then return the unloaded D1 to the wall and reset C1. Return the first set and notebook from H1 to D1, reopen L2 at D2 and restore its lead. Check the route and both work setups before resuming.

Furniture waypoints used in the example

Use the waypoints as the technical equivalent for the example worksheet. Each pair indicates the top-left of the furniture footprint. Each arrow connects positions along one axis, and each step starts where the item stood at the previous step or in the starting plan.

Illustrative furniture waypoints
TransitionTop-left coordinates in metres
A → BC1 (1.70, 0.80) → (1.70, 0.35). Then D1 (0.40, 0.10) → (0.40, 1.20). Then C2 (2.745, 1.95) → (0.645, 1.95). Then C1 (0.645, 0.35).
B → CC1 (1.70, 0.35). Then D1 (0.20, 1.20) → (0.20, 0.10). Then C1 (1.70, 1.00) → (0.20, 1.00). Then C2 (0.20, 1.95) → (0.20, 1.85).
A → CC1 (0.20, 0.80) → (0.20, 1.00). Then C2 (2.745, 1.85) → (0.20, 1.85).
C → AC2 (2.745, 1.85) → (2.745, 0.80). Then C1 (0.20, 0.80) → (0.445, 0.80).
B → AC1 (1.70, 0.35). Then C2 (2.745, 1.95) → (2.745, 0.80). Then D1 (0.40, 0.10) → (0.20, 0.10). Then C1 (1.70, 0.80) → (0.445, 0.80).

Walk through the changeover with both people. Where will each person stand, who will move the desk, and can you still open the door? Time the changeover and reset. Check the rolled mat size, the space at H1–H3 and the route between the house and garden room. If equipment or furniture intrudes on the real route, change the storage or layout before relying on it.

Open the room plans you want to include before printing.

Partitions and flexible furniture

An open layout keeps the room easy to reconfigure, but calls, play and hobbies share the same air and sound. Moveable furniture can mark off a reading or meeting area. Use the furniture maker’s fixing instructions, and ask what is behind the wall lining before relying on a loaded bookcase. The illustrated shelving unit uses a 76.5 × 39 cm product footprint, with fixing and load capacity to be checked in the actual building. IKEA shelf dimensions and fixing guidance, checked 20 November 2026

A full partition affects both sides. On a 3 m span, a hypothetical 100 mm wall takes 0.30 m² before allowing for linings, doors, swings and their approaches. Place windows, ventilation, heat, sockets and data on the drawing for each side. Ask the supplier for evidence for the complete partition and door assembly if speech privacy matters. Before proposing a separate entrance, walk the outdoor route people will use and allow for the door to open.

Occasional guests

Tell the supplier and the relevant authority about intended nights, occupants, cooking and bathroom facilities while the design is still changeable. In England, Class E permitted development concerns incidental use of the home, and government guidance distinguishes that from primary living accommodation. A detached building containing sleeping accommodation falls outside the ordinary small detached building exemptions in Schedule 2 Class 6 paragraphs 1 and 3. Confirm the proposal with planning and building control before buying a room intended for overnight stays. For the separate England checks, use the planning guide and building regulations guide. GOV.UK householder guidance, rechecked 21 November 2026, England Class E order, checked 20 November 2026, Building Regulations Schedule 2, rechecked 21 November 2026

Take your time/use matrix, marked-up room states and unresolved checks into the quote planner. Ask for the proposed finished internal dimensions, the layout as drawn and written confirmation of what the supplier will install.

Take the resulting scope into the quote comparison. Separate the room price from connections and site work using the whole-project cost guide. For the wider room and supplier decision, use the Office buying guide.

How will you change from one use to the other?

Draw the room in both arrangements, including what moves and where it goes. Mention overnight guests if that’s one of the intended uses.

Open the private project planner

Sources and checks

Published equipment data supplies object sizes. Plans, room positions and occupied reservations are worked assumptions. The two folded table-tennis specifications disagree. The England legal links support the scoped planning and building-regulations discussion. Confirm the current model drawing, the people and tasks, actual room measurements and the proposed use before ordering.

  1. Manduka PRO comparison — Standard PRO mat footprint used in the worked example. Checked 21 November 2026.
  2. UK product specification — The open 500X envelope and the exclusion of the net. Checked 21 November 2026.
  3. Individual sheet — Individual 500X sheet for the two folded model references. Checked 21 November 2026.
  4. Range comparison — Range comparison sheet with a different folded envelope. Checked 21 November 2026.
  5. IKEA desk — Desk top dimensions used in the plans. Checked 21 November 2026.
  6. IKEA chair — Chair product bounds used in the plans. Checked 20 November 2026.
  7. HSE DSE checklist — Workstation, task and user assessment. Checked 20 November 2026.
  8. IKEA shelf dimensions and fixing guidance — Shelf size and fixing instructions. Checked 20 November 2026.
  9. GOV.UK householder guidance — England guidance on incidental use and primary living accommodation. Checked 21 November 2026.
  10. England Class E order — Current England Class E framework. Checked 20 November 2026.
  11. Building Regulations Schedule 2 — England Schedule 2 Class 6 exemptions and sleeping accommodation. Checked 21 November 2026.