What’s behind the cladding and around its edges?

Ask for a drawing that shows what happens at windows, corners and the bottom of the wall, including how water drains away and how the wall can dry. Check that the installer can reach each part, especially the side facing the boundary.

Sources checked 21 November 2026

A side wall and corner of a timber-clad room with a closed window and visible access route.

Which cladding system will the installer fit?

Get the product, profile and orientation on the drawing. For Millboard Envello Board & Batten+, compare the vertical installation guide and horizontal installation guide. The vertical system uses a cross-batten arrangement to preserve a vertical drainage and drying path behind horizontal support. Keep the correct supports, cavity and opening trims for the chosen orientation.

Reaction to fire describes how a product or tested build-up contributes to fire. Fire resistance describes how long an assembly meets specified performance criteria. Millboard’s fire and safety guidance describes its product evidence. Ask a qualified person to confirm what the actual wall, building and site require and whether the evidence covers that build-up.

For England, the current Approved Document B publication contains the 2019 edition with the 2020, 2022, 2025 and 2026 amendments and separately marked changes for 2029. Ask which volume and transitional edition apply. Identify the actual building and exemption status before applying requirements to its wall assembly.

Cladding system checklist

Get answers for the exact orientation, wall and scope before approving the order.

Download the cladding system checklist

Cladding system checklist
FieldYour record
Product, profile, orientation and manual revision—
Support, drainage, ventilation and membrane strategy—
Opening and edge details, fixings and trims—
Applicable nation and fire evidence edition—
Classification and complete tested wall scope—
Access and clearance owner—
Substitution, check and approval process—

Plan maintenance near boundaries

Draw the actual wall-to-obstacle distance and establish the title/curtilage question separately. Allow for installing trims and maintaining, removing or replacing parts later. Confirm where a person can inspect a wall and where usable working space must be reserved.

If the proposal depends on entering another property, agree how lawful access would work. Supplier build tolerances and care access can require different dimensions.

Get a dated dimensioned view showing the access gate, relevant wall faces and any obstacle outside your control. Keep the exact drawing with the care plan.

Compare defect and replacement proposals

For a warped board, open joint or moisture concern, ask what remains visible and what the installer needs to investigate. The source may be a board, an opening detail, support, drainage or movement. Compare repair and replacement diagnosis before choosing a cosmetic alteration.

Itemise safe access, strip and disposal, supporting-layer repair, compatible replacement boards and fixings, finishing and record photos. Confirm labour, VAT, potential hidden work and any impact on product or assembly warranty. Leave installed cost open until matched quotes arrive.

Replacement quotation sheet

Record what you can see. List separately the cost of opening the wall and any repairs the contractor can only price once it’s open. Ask all contractors to price the same areas.

Download the replacement quotation sheet

Replacement quotation sheet
Area and evidenceStrip and disposeSupport and new finishAccessWarranty and VATContingent works
Rear wall—————
Street face—————
Side return—————
Door or window surround—————

Before agreeing repair, record elevation and exposure, product and batch if known, installation date and finish history, and dated photographs showing symptom location and extent. Identify who will inspect support, fixings, openings and drainage and whether the installer or warranty provider needs to see the condition first.

Sources and checks

The applicable requirement depends on the build, the use, its exemption status and the applicable nation. The named manuals are orientation-specific. Get independent advice on the actual wall and site where required.

  1. Millboard Envello Board and Batten+ vertical installation guide — Millboard Envello Board and Batten+ vertical installation guide Checked 20 November 2026.
  2. Millboard Envello Board and Batten+ horizontal installation guide — Millboard Envello Board and Batten+ horizontal installation guide Checked 20 November 2026.
  3. Millboard fire and safety FAQ — Millboard fire and safety FAQ Checked 20 November 2026.
  4. Millboard 25-year limited structural Envello cladding warranty — Millboard 25-year limited structural Envello cladding warranty Checked 20 November 2026.
  5. GOV.UK England Approved Document B collection — GOV.UK England Approved Document B collection Checked 21 November 2026.
  6. Building Regulations 2010 regulation 9 — Building Regulations 2010 regulation 9 Checked 21 November 2026.
  7. GOV.UK title plans and boundaries — GOV.UK title plans and boundaries Checked 20 November 2026.
  8. Green Retreats FAQs: lifespan, care and construction clearance — lifespan, care and construction clearance Checked 20 November 2026.
  9. Wales outbuilding planning guidance — Wales outbuilding planning guidance Checked 20 November 2026.
  10. Scotland outbuilding planning guidance — Scotland outbuilding planning guidance Checked 20 November 2026.
  11. Northern Ireland planning application guidance — Northern Ireland planning application guidance Checked 20 November 2026.
  12. Welsh building-regulations documents — Welsh building-regulations documents Checked 20 November 2026.
  13. Scotland building warrant — Scotland building warrant Checked 20 November 2026.
  14. Building Control Northern Ireland — Building Control Northern Ireland Checked 20 November 2026.