Check the finished space

Garden golf rooms

Start with the golfer, clubs and simulator. Test all three against the finished room.

Sources checked 21 November 2026

An empty timber golf bay with a hitting mat, white screen and exposed beam above.

Will the tallest player have room to swing?

Start with the tallest player and longest club

Start in a clear, open area with a slow dry swing and no ball. Write down who’s tallest, which club is longest, whether players swing left- or right-handed and which shots they want to practise. On the proposed plan, mark the tee position and the top of the finished mat.

Ask the installer to check the backswing and follow-through against the final room section before any full swing indoors. Confirm a usable tee position for left- and right-handed players. Find out whether the monitor supports one tee or needs a second position or calibration. Mark the exit, waiting area and storage outside the active swing and ball paths.

Check finished width, depth and height

Find the controlling clear width

For every tee position, compare the measured player-and-club envelope on both sides with the selected enclosure and equipment installation envelope. Start with the larger width, then verify that both envelopes fit in the same positions. Padding, handles, frames and cupboards take up finished space. Keep circulation outside the active bay.

The Foresight SIM IN A BOX Pro Structure A2 lists a 3,684 mm outside enclosure width. Add the installation and equipment space it needs, then check the hitting position and the golfer’s full swing.

Draw the whole room section

Along the room, mark the rear wall, screen or net face, rear stand-off, tee, device zone and walking route. Measure clear height from the top of the mat to the lowest obstruction throughout the swing. Check roof slopes, beams, lights, mounts and projector.

A 4.60 m depth check

In an illustrative R10 layout, 8 ft from tee to net plus 6 ft from tee to monitor uses about 4.27 m. A 4.60 m finished room leaves about 0.33 m in total for space beyond the net and monitor. Compare that remainder with the actual enclosure and installation instructions before buying. Garmin Approach R10 manual

Check height and planning separately

A 2.50 m exterior cannot provide 2.50 m of usable swing height after the floor, mat and roof build-ups. In England, Class E includes a 2.5 m overall-height condition for an outbuilding within 2 m of the curtilage boundary, alongside other conditions. Ask the relevant authority about the actual proposal and intended use. England Class E

If the room fails the planned swing or containment check, change the building, enclosure or site. A more limited practice brief is an option only once the installer confirms the clubs, shots, equipment and containment it can accommodate.

Position the screen, tee and monitor

Compare the two layouts

Two target lines at the same horizontal scale. The R10 has a marked range behind the tee. The iO line shows the screen and tee, with the overhead position to be confirmed.
Read each axis from the net or screen through the tee. Both use the same horizontal scale. Open full-size diagram

Garmin R10 uses a rear floor position. Keep at least 8 ft from tee to net and 6–8 ft from tee to the monitor.

Trackman iO uses an overhead mount. Keep at least 2.50 m from tee to screen. Confirm the mount position for the chosen variant.

Ask for the actual screen or net stand-off and room clearances on the installer’s drawing.

Garmin Approach R10 floor layout

Garmin Approach R10 v4 target line. Indoor net at least 8 ft in front of the tee, and monitor 6–8 ft behind.
Approach R10, Garmin UK-English manual v4, January 2026. Along the target line the two lower limits total 14 ft from net to monitor. The room also needs confirmed space beyond those points. Open full-size diagram

Put the monitor behind the tee and align it with the tee and shot target. Keep its bottom edge above the mat. Check the net’s stand-off, the rear clearance and the unobstructed swing together. Garmin Approach R10 manual v4

Single Trackman iO Low overhead layout

Unscaled rear screen reserve and minimum 2.50 m between the screen and tee. A schematic section projects the overhead mount datum to the turf. A worked iO Low example is 280 cm from turf to ceiling and 96 cm horizontally from tee centre towards the screen to the bracket centre.
Single Trackman iO Low. Sources are the bay setup guidance, mounting-height guide and IN-0050 Rev 02.00. The plan marks an unscaled rear reservation. The overhead section shows a worked 280 cm height and 96 cm tee-to-bracket example. Confirm the actual selected-screen reservation and mounting geometry with the installer. Open full-size diagram

Trackman’s general setup guidance gives a minimum 2.50 m from tee to screen and a generic 2.85 m room minimum that varies by unit. The separate mounting guide gives the single iO Low a 270–290 cm calibration band from finished turf to ceiling. Get the installer to confirm the variant, bracket, projected mount datum and exact tee-to-mount offset. Also confirm the separate swing height and the stand-off or deflection allowed behind the screen. iO bay setup · Mounting heights · IN-0050 Rev 02.00

For a single iO Low, page 5 of IN-0050 Rev 02.00 gives tee-centre to bracket-centre distances of 92 cm at 270 cm from turf to ceiling, 94 cm at 275 cm, 96 cm at the recommended 280 cm, 98.5 cm at 285 cm and 100 cm at 290 cm. Ask the installer to confirm the correct variant, reference surfaces and bracket configuration. Put the confirmed screen stand-off and deflection space behind the screen plane on the same drawing. Trackman installation manual, page 5

Position the projector by model

Match the throw and image size to the chosen projector and actual screen. Put the lens reference and mount on the drawing, out of the full swing and away from likely ball impact. Check alignment, access and the screen lighting during play.

Plan the changeover for work or gym use

Draw both room states and show where the equipment goes between them.

A folded worktable lies against a timber wall beside an empty golf bay with a mat and white screen.

For office mode, show the opened desk, chair movement, call lighting and cable route. For gym mode, draw the equipment and the space for actual movements. In golf mode, mark where the chair, weights or treadmill will be stored and how the player enters and waits.

Check every fixed item, including a folded desk or rack, against both finished layouts. If two activities will happen at once, ask the installer to confirm their separation, containment and independent route out of the active golf bay.

Compare the room and simulator together

Ask each seller for the same finished drawing

As a UK buying lead, Green Retreats offers the A2 golf building and an enquiry route for its site survey and quote. Ask for the installed shell scope and price the simulator package and commissioning as separate lines unless the signed quote expressly includes them. Green Retreats A2 golf building

Make a simulator fit worksheet

Give the building supplier and simulator installer the same measured record. Ask both to mark unresolved items and accept the final plan before the order.

Simulator fit worksheet
ItemYour fit record
Player and clubTallest golfer, longest club, handedness and intended shots.
Dry swing and obstructionsTee for each side. Check low roof, beams, lights and other projections.
Finished measurementsUsable width and depth, mat top and lowest clear height above it.
Playing clearanceMeasured swing envelope on both sides, exit and waiting area.
Equipment clearanceEnclosure size, assembly access and operating space in the chosen room.
Model evidenceMonitor, screen, enclosure, mat and projector models. Manual revision.
Tee, target and monitorMark the tee, target line and exact floor or mount reference. For iO Low, record turf-to-ceiling height and the agreed tee-centre to bracket-centre offset.
Screen clearanceStand-off, deflection space and rear access with the bay inactive.
ProjectorLens position, throw, picture size, lighting and service access.
Delivery and changeoverLargest component, delivery route, stored equipment and other room mode.
Open items and acceptanceList unresolved clearances. Building supplier and installer signatures.

Use the quote planner to prepare the site brief and the quote comparison guide to check exclusions.

Sources and checks

We checked the named manufacturer instructions and the England planning source. The diagrams show the distances published for each model. Actual players, finished surfaces, the selected equipment and supplier clearances still need a coordinated fit check before ordering.

  1. Garmin Approach R10 indoor setup, manual v4 — January 2026 UK-English instructions for tee-to-net spacing, monitor placement, target line and mat datum. The 14 ft line in the guide is the sum of the two lower limits. Checked 21 November 2026.
  2. Trackman single iO bay setup — Gives a 2.50 m minimum from tee to screen and a generic 2.85 m room-height minimum with variation by unit. Checked 21 November 2026.
  3. Trackman iO mounting heights — Distinguishes Low, Mid and High. The single iO Low band uses 270–290 cm measured from turf to ceiling. Checked 21 November 2026.
  4. Trackman iO installation instructions, IN-0050 Rev 02.00 — Distinguishes installation table, mount types and calibration. Confirm the mount reference and tee-to-mount offset for the selected unit, finished turf and installation. Checked 21 November 2026.
  5. Foresight SIM IN A BOX Pro Structure — Lists a 3,684 mm width for the A2 enclosure. Its footprint is one input to the full room check. Checked 21 November 2026.
  6. England Class E permitted development — Sets conditions for qualifying incidental buildings in England including the 2.5 m overall-height condition within 2 m of the curtilage boundary. Checked 21 November 2026.
  7. Green Retreats A2 UK golf-building enquiry — Gives a named building product, published options and a quote route for the shell. Checked 21 November 2026.