HOUSEHOLD BAR PLANNING
Plan the bar with the doors open.
Draw the fridge and cupboards open, the seats occupied and the path to the door clear before you fix the counter in place.

Counter, seating and circulation
Dry and wet room layouts
| Option | Inside the room | Counter | Extra check |
|---|---|---|---|
| Dry | 3.60 × 2.80 m | 1.80 × 0.60 m | Appliance door and occupied-seat route |
| Wet | 4.80 × 3.40 m | 2.40 × 0.65 m | Sink, drainage and retained seating route |
A fictional small dry bar uses 3.6 × 2.8 m of finished internal space and a 1.8 × 0.6 m wall counter. The plan shows how much space the loose seats take up when people are sitting on them. A larger fictional room at 4.8 × 3.4 m adds a 2.4 × 0.65 m wet counter with sink reserved, with a separate route to the seating. Use these to redraw your actual equipment and door swings.
A pub-inspired bar can use a perch and shelves, a modern bar can use a long flush counter, and an office with a bar can put the work surface in a distinct area. Draw the party and work settings, including changed furniture and access routes, before deciding where fixed fixtures go.
Record counter working height from the finished floor, seat height, knee and approach space, and the clear working aisle with the fridge or cupboard open. Check the path at an occupied stool and with a seated or wheelchair user who will use the room. Decide dimensions after trying the actual seating and access needs.
Record counter and seat heights from finished floor. Enter measured knee and approach space alongside the route tests. Use your actual users and equipment in the trial.
Interior and decor examples
For a modern bar, try flat cabinet fronts, a wipeable solid-colour counter and concealed LED task light at the serving edge. For a pub-style room, try warm timber fronts, a dark wipeable counter and warm shelf lighting with a task fitting at the work surface. Check glare and spills with both lighting levels on the materials and mirror you plan to use.
Robertson’s Rochford bar and store and Bakers’ Essex bar and games room are supplier-reported examples. Check what storage, services and finished floor space each real quote includes and where access will fall with furniture occupied.
Sink, fridge, power and air
For a wet bar, ask the designer and relevant sewerage provider about water and acceptable sink drainage. In England Approved Document H gives drainage guidance where applicable. Record the selected fridge’s nameplate, connection, door sweep and cabinet ventilation. Beko’s UL4584 specification gives a 16°C minimum operating ambient temperature for that model.
For year-round use, plan comfortable heating and fresh air when several people occupy the room. Ask whether external service runs, suitable lighting and appliance circuits are in the quote. For a business or public activity, get the intended operation checked for planning and licensing rather than borrowing a household scenario.
Draw a fresh-air path for actual occupancy and ask the designer to size and commission it. Keep appliance airflow and connection specific to the selected manual. The Beko UL4584 energy data lists 90 kWh per year on the label. Price that label example as 90 × your unit rate. Ask the installer to size the supply from equipment and nameplate data. Actual consumption and winter heating vary.
For a proposed regulated activity, check the current GOV.UK alcohol licensing guidance and speak to the relevant authority about the actual operation.
For a new domestic circuit in England check Approved Document P with the installer. Plan use hours and sound reaching neighbours. Kensington and Chelsea’s nuisance guidance illustrates one council’s service in England. Use the local authority for the actual site and any licensing enquiry.
What will the bar cost to fit and run?
Price the basic room, bar joinery, fridge, electrical jobs, water and drainage, furnishings and fitting separately, including VAT and allowances. A dry and wet bar quote can share the same shell but diverge at the trench and connections.
Keep appliance running conditions and heating expected for winter use in the ongoing budget. Record who accepts the completed service scope and hands over instructions.
The installed total is quote-only. For a worksheet example, enter the same surveyed shell, counter, sockets, fridge, ventilation and finish for dry and wet options. For the wet option add the quoted water supply, drainage, trench, reinstatement and commissioning. Mark every unpriced line awaiting quote and leave the total open. Add only VAT-inclusive lines on the same basis and track winter heating separately.
Wet and dry bar scope
Request VAT-inclusive prices for the same shell and fit-out. Confirm the wet-only line items and keep the total open until they are priced.
Download the wet and dry bar scope
| Task or fixture | Dry option | Wet option | Supplier or installer | Price or allowance | Evidence |
|---|---|---|---|---|---|
| Surveyed shell and finish | Match the finished shell, counter and fittings | Use same specification | — | — | Dated revision |
| Cold appliance | Confirm operating range and open door | Use the same specified model | — | — | Manual, annual label kWh and tariff |
| Ventilation and heating | Ask for ventilation with room closed | Add any needs for wet activity | — | — | Air paths, heat and seasonal use |
| Lighting and power | Confirm lighting and socket scope | Add applicable wet service details | — | — | Electrical design and testing |
| Sink and water | Leave out by scope | Price supply and sink installation | — | — | Water design and commissioning |
| Drainage route | Leave out by scope | Price route, trench and connections | — | — | Discharge and maintenance checks |
| Counter, access and fixtures | Record seat height, knee space and approach | Use same access test with sink and fridge | — | — | Actual measurements |
| Reinstatement and handover | Confirm the common site work | Price additional trench reinstatement and service commissioning | — | — | Acceptable finish and records |
Related guides
Sources and checks
Room and counter dimensions are fictional finished measurements. Try opening the cupboards and moving past the seats with the people and fittings you plan to have there. Use verified appliance and supplier documents.
- Robertson Garden Rooms: Rochford bar and store case 56 — Rochford bar and store case 56 Checked 20 November 2026.
- Bakers Garden Buildings: Essex bar and games room — Essex bar and games room Checked 20 November 2026.
- Beko UK: UL4584 model dimensions and operating ambient range — UL4584 model dimensions and operating ambient range Checked 21 November 2026.
- Beko UK: generic fridge low-temperature FAQ — generic fridge low-temperature FAQ Checked 20 November 2026.
- RBKC: official noise and nuisance guidance — official noise and nuisance guidance Checked 20 November 2026.
- GOV.UK: alcohol licensing — alcohol licensing Checked 21 November 2026.
- Bristol Water regulations — Bristol Water regulations Checked 20 November 2026.
- Approved Document H 2015 PDF — Approved Document H 2015 PDF Checked 20 November 2026.
- Approved Document P 2013 PDF — Approved Document P 2013 PDF Checked 20 November 2026.
- England Approved Document L editions — England Approved Document L editions Checked 20 November 2026.
- GOV.UK: when permission is required, home working — when permission is required, home working Checked 20 November 2026.
- Current England GPDO Class E — Current England GPDO Class E Checked 21 November 2026.