Groundworks and room costs
Garden rooms in Sussex
On a sloping Sussex plot, show where the room’s floor will sit before you compare bases. Ask for one suitable base, any retaining work and the house connection to be priced separately from the room.

Check service and trade ownership
Ask for the full postcode and a named team
- Bakers. Lists East and West Sussex and Brighton & Hove. Ask who contracts the partner work.
- Sussex Crafted. Brighton and Sussex bespoke service. Confirm the site and build route.
Checked 21 November 2026. Ask both to price the same room, finish and surveyed route.
| Area or visit | Stated route | Confirm before quoting |
|---|---|---|
| East Sussex | Bakers and Sussex Crafted name East Sussex work. Bakers coverage · Sussex Crafted | Postcode, plot, access and named builder. |
| West Sussex | Bakers names West Sussex places and describes coordinated works. Bakers Sussex service | Postcode and separately priced groundworks, access and partner teams. |
| Brighton and Hove | Both are published leads for Brighton area. Bakers · Sussex Crafted | Borough, availability, quote and qualified work owner. |
| Bolney display | Bakers visit by appointment. Show Centre details | Named model, booking, current range and who can confirm the specification. |
Match the building, ground and services scope
Check inside space and finished floor level with your desk and door plan. Ask for wall, roof and floor construction and services that work at handover. Price any deck, canopy, access path, steps and slope work on separate lines. Identify the firm or partner responsible for regulated work. Bakers service scope · Sussex Crafted build routes
Compare two bases for the same Jay Office
Choose one base with the £14,522 building
- Concrete. £2,911 base gives £17,433 building-plus-base.
- Steel and timber. £3,080 base gives £17,602 building-plus-base.
July 2026 schedule, checked 21 November 2026. Both subtotals include VAT and exclude the additional service and finish lines below. Get a surveyed quote before choosing the base or assuming the standard house run applies. Bakers July 2026 Jay schedule (PDF)
| Scope line | Inc. VAT | Use in the quote |
|---|---|---|
| Building and full install | £14,522 | Includes the published EPDM roof. Confirm handling and fit. |
| Concrete base | £2,911 | One base option. Survey the plot and ask which pump or handling costs apply. |
| Steel-and-timber base | £3,080 | Alternative base option. Ask the supplier to assess ground and access. |
| Jay Office electrics | £2,563 | Published scope includes a house submain up to 30 m subject to survey. Ask about actual route and tested capacity. |
| Internet | £632 | Ask about router connection, actual length, termination and a demonstrated link. |
| Interior paint and fill | £625 | Ask what filling, surfaces and finish the option includes. |
Confirm a model before visiting Bolney
Bakers Show Centre
Units 28–29, Bolney Grange Business Park, Stairbridge Lane, Haywards Heath RH17 5PB. Book an appointment. The supplier’s pages give different building counts. Ask which exact Jay or other room, base or finish you can inspect and confirm the visit details. Official show centre and appointments · Contact and alternative counts
Show how the floor sits beside the slope
Mark the route, retained edge and proposed floor
Give the contractor a measured section with existing and proposed levels, the retention and drainage features, access and working space. Ask who assesses the existing support and who covers making good. For a South Downs National Park site, check the park authority’s process and who handles the enquiry. South Downs planning responsibility
Who handled changes after the survey?
Bakers describes the retaining wall at the Lindfield installation. We haven’t verified a dated customer review covering comparable Sussex work.
Use a dated owner account about slopes, access or connections. Check the actual site and scope, which work changed after survey and who returned after handover. Record whether the evidence comes from a selected supplier testimonial.
Supplier-reported Lindfield office and retaining wall
Bakers reports a 2.9 × 2.5 m Jay office in Lindfield with longer steel across a retaining wall and house power and data fitted afterwards. Ask which trade measures and approves the proposed support and services for your site. The account gives a site-specific sequence and no checked design for another plot. Bakers Lindfield case
Brighton and Hove installer and property checks
Use both businesses as postcode leads. Check current planning history and any applicable direction with Brighton & Hove for the address. Ask the authority to confirm the current constraint and the exact work it covers. Bakers Brighton service · Sussex Crafted · Brighton & Hove Planning Register
Garden Room Annexe reports replacing an old Brighton summerhouse with an office and playroom. It describes a deck built into the slope and front and rear windows. Use it to ask about levels and ventilation. The case gives no dated independent customer review, price or permission decision. Brighton supplier case
Send a level and service sketch
Give each bidder the same ground and fit-out brief
Attach photos of the route or a measured side view showing the ground levels. Request separate prices for one base, preparation, making good, electrical and data routes, deck and waste. Document responsibility for the design, installation and tests.
| Item | Your record |
|---|---|
| Work address and provider | Postcode, authority, supplier, site survey and partners. |
| Level section and retaining | Existing levels, proposed floor, retained edge, condition and survey owner. |
| Access, path and spoil | Estimate route, turns, unloading, preparation, removal and protecting existing works. |
| Single base choice | Type, ground scope, named designer and installer, base price and alternatives. |
| Building and outside finish | Fit, deck, canopy, roof, flooring, paint and making good. |
| House electrical route | Measured cable route, quoted limit, load checks, price and final certificate. |
| Data and final tests | Router-to-desk route, commissioning and named test owner. |
| Price and open work | VAT, date, waste, repair and any unquoted allowance with due date. |
Use the quote comparison guide to reconcile both surveys.
Related guides
Sources and checks
We checked local service areas, the July 2026 Jay schedule, the Show Centre and relevant authority routes. Two subtotals combine the building and one base at a time. We checked the conflicting show-centre counts and kept them open.
- Bakers Sussex service and partners — Names East and West Sussex and Brighton-area installations and describes work coordination. Checked 21 November 2026.
- Sussex Crafted service areas — Names Brighton and Sussex and describes bespoke build routes. Checked 21 November 2026.
- Bakers Jay July 2026 price list (PDF) — The Jay Office 2.9 × 2.5 m row separates six VAT-inclusive building, base, electrics, data and finish lines with survey conditions. Checked 21 November 2026.
- Bakers Bolney appointment display — Confirms physical address, appointment route and site parking. Lists 14 displays. Checked 21 November 2026.
- Bakers contact and visit — Contains conflicting display counts of 11 and 16 on the same page. Checked 21 November 2026.
- Bakers Lindfield Jay office — Supplier reports longer steel in the base spanning a retaining wall, followed by house power and data. Checked 21 November 2026.
- South Downs planning process — Identifies the National Park Authority and explains which service handles applications. Checked 21 November 2026.
- Brighton & Hove Planning Register — Address-specific council planning search. Confirm current direction with the council. Checked 21 November 2026.
- Garden Room Annexe Brighton office and playroom — Supplier reports the replacement, sloped-site deck and openings. No independently confirmed price or permission. Checked 21 November 2026.