Planning and building control

Garden room planning in Wales

Measure from the proposed room to the house and to each boundary. Give those distances, the roof shape and the heights to your Welsh planning authority. Ask building control separately about the construction and services.

Sources checked 21 November 2026

A small timber garden room between a rendered house wall and a side boundary fence, with the gaps visible.

Check the Welsh planning route

Apply the two height bands to the parts they cover

Welsh Class E provides a route for qualifying purposes incidental to a dwellinghouse. Ask planning whether the property retains these rights and whether the intended use qualifies. Give the planned activity, visitors, services and any overnight use.

Check the principal elevation of the original house and any side elevation that affects proximity to a highway. Record the single-storey proposal, raised platforms and protected status. Listed-building curtilage is outside this Class E route. Designated land and World Heritage Sites have additional siting and coverage restrictions.

For E.1(a), divide ground covered by the qualifying buildings, enclosures, raised platforms, pools and containers by the total curtilage area after removing the original house footprint from both sides of the calculation. Check the result against the 50% limit and have planning confirm what belongs in each area. Welsh statutory Class E substitution · Welsh Government outbuildings guidance · Technical guide, section 11

Mark the two bands and adjoining ground

A dashed house band and dotted boundary band cross a proposed room. The coverage diagram removes the original house footprint from the plot area.
Schematic. A lies in the house band, B in the boundary band. The shaded part of the room is inside both. Open the distance bands diagram
Two roof sections show separate measurements from the ground adjoining parts A and B, with eaves and roof marked in both.
Schematic. Give planning a measured section for each affected part and a separate eaves check. Open the height diagram

Check building control and services

Use the measured floor area and specification

Send building control the floor area, storeys, materials, distances, intended use, design and services. Schedule 2 Class 6 includes two relevant categories.

Regulation 9 can retain certain water requirements. For a Class 6 building receiving electricity from a source shared with or inside a dwelling, it retains Part P. Ask the electrician and building control which Welsh notification and certification route applies to the work. Building Regulations 2010, regulation 9 and Class 6 · Welsh outbuildings guidance · Welsh Approved Document P and amendments

What to show on your Welsh site plan

Send one measured drawing pack

Include the original house, proposed and existing works, ground levels, heights and roof type, internal floor area, property history, actual use, services and proposed certifiers. Ask the planning team and building control to reply separately in writing, each referring to the date on your drawing. Find your planning authority · Find a building control body

Welsh garden room enquiry checklist
ItemYour record
Property and useExisting rights, house type, working, visitors, overnight use and drawing revision.
Plan and frontageOriginal house, principal and side elevations, roads, curtilage and other works.
Distinct 2 m bandsMark affected house and boundary portions and any overlap.
Height and groundRoof form, eaves and height at each affected part from its adjoining ground.
Coverage calculationInclude qualifying existing and proposed work. Exclude the original house footprint.
Protection and other worksListed or designated land, rights removal and balconies or raised platforms.
Building controlFloor area, storeys, sleeping, shortest boundary gap and construction materials.
Services and evidenceElectrics, supply origin, water and drainage. Record responsible trade and certification.
Named issue ownersPlanning, building control, electrician, reviewer, scoped decision and follow-up date.

Official source register

Keep the written replies from planning and building control with your drawing, including who answered each question.

Planning · Welsh Class E and outbuildings guidance

Check E.1(a) to (j), E.2 and E.5 for coverage, siting, heights, protected settings and the eaves definition. The local planning authority confirms property rights and applies the tests to the actual drawing. Welsh territorial substitution · Government checklist · Technical guide, section 11 (PDF)

Building control · Class 6 and regulation 9

Check Class 6 paragraphs 1 and 3 and retained water and power requirements in regulation 9. Give the measurements, materials and intended use to the building control body. Regulations · Welsh outbuildings guidance

Electrical work · Welsh Part P

The electrician and building control agree which safety, notification and certification requirements apply. Check the Welsh guidance and linked amendments. Welsh Approved Document P

Who to ask · Welsh authority directories

Planning authority for site rights and siting. Building control body for construction and services. Local planning authority · Building control body

Keep your written responses with the specification in the quote planner.

Sources and checks

The Welsh Government’s outbuildings guidance and technical guide explain the Welsh Class E planning rules. Give your local planning authority the roof shape, heights and distances from the house and boundaries. Ask building control separately about the proposed construction and services.

  1. Welsh Class E territorial substitution — Schedule, Part 1, Class E identifies qualifying uses, E.1 siting and height tests and E.2 protected-area conditions. Checked 21 November 2026.
  2. Welsh Government planning permission for outbuildings — Summarises the separate house and boundary bands, flat roof and eaves checks, frontage and other limits. Checked 21 November 2026.
  3. Welsh Government householder technical guide (PDF) — Section 11 reproduces the Class E tests and explains the roof, eaves and immediately adjoining ground. Apply E.1(f) and E.1(h) separately. Checked 21 November 2026.
  4. Building Regulations 2010, regulation 9 and Schedule 2 Class 6 — Defines the no-sleeping small detached building categories and retained water and electrical requirements under regulation 9. Checked 21 November 2026.
  5. Welsh Government building regulations for outbuildings — Summarises common detached-building cases and the separate approvals question. Checked 21 November 2026.
  6. Welsh Approved Document P — Presents Welsh electrical safety guidance and its amendments. Checked 21 November 2026.
  7. Welsh local planning authority directory — Identifies the authority to ask about rights and measured drawings. Checked 21 November 2026.
  8. Welsh building control directory — Identifies local authorities and registered building control approvers. Checked 21 November 2026.