MASONRY COSTS
Get the masonry work priced line by line.
Give each contractor the same drawings and ask who pays for each part of the finished room.

What should every masonry quote cover?
Send the same drawing and specification to each contractor. Describe excavation and waste, foundations and slab, wall and insulation systems, openings, roof and rainwater, services, interior finishes and making good. Record which party resolves the ground conditions, drainage and structural decisions.
Break out design, approvals and investigation separately. Ask what allowances cover unknown ground or service work, what evidence triggers a variation and who agrees it. Confirm the listed VAT treatment and quote expiry.
Compare dated project or supplier costs
List the contractor’s total and the excluded work separately. Beside each cost per square metre, write which floor area you used. A 12 m² finished usable area and a larger gross wall-defined footprint can give different unit prices from the same quote. For a purely arithmetic example, £24,000 ÷ 12 m² is £2,000/m². The amount is hypothetical.
Nick Hill Architects’ Notting Hill Garden House, built in London in 2018–2020, had a reported £240,000 construction cost and a gross internal area of 58 m². Its London stock-brick walls enclose a living and working studio with a small kitchen, WC and bath or shower room. Dividing the reported cost by that gross internal area gives about £4,138/m². The Architects’ Journal project data also give 58 m² internally. Its separate 67 m² figure includes external floor area, giving £3,582/m² on that basis. The VAT treatment and the split between site work, services and finishes remain unconfirmed. Use this as a historical example of that specification. Ask bidders for current prices on the drawings for your own room.
FAB Architects’ Hove Hidden Studios reports a £80,000 design-and-construction budget including VAT for two 4 × 3 m bespoke SIP studios with glazed brick slips in 2022. The architect does not specify internal versus external dimensions or a cost split. The package is excluded from a structural masonry price comparison. LCS’s brick-and-block garden-room project describes the sequence and gives no price. Neither project supplies a price for a smaller structural masonry office with your proposed specification.
How much will a block-built garden office cost? Ask the contractor to price a separate wall package naming the block and wall build-up, insulation, outer finish, labour and the junctions with the slab, openings and roof. Classify each item as fixed, provisional, excluded or still unconfirmed. Get the missing scope priced before comparing totals.
Masonry cost breakdown
Classify each price and write down the assumption, owner and anything awaiting confirmation.
Download the masonry cost breakdown
| Cost item | Fixed | Provisional | Excluded | Assumption and responsible party | Awaiting confirmation |
|---|---|---|---|---|---|
| Investigation, design and approvals | — | — | — | — | — |
| Access and enabling | — | — | — | — | — |
| Excavation and spoil | — | — | — | — | — |
| Foundation and slab | — | — | — | — | — |
| Structural masonry, insulation, finish, labour and interfaces | — | — | — | — | — |
| Roof and drainage | — | — | — | — | — |
| Openings | — | — | — | — | — |
| Utilities and testing | — | — | — | — | — |
| Finishes and making good | — | — | — | — | — |
| VAT and contingency | — | — | — | — | — |
Ask bidders to price the structural masonry wall package and give a complete stated-VAT price using the same site, finished internal area and exclusions. Compare only bids with a recorded date and specification.
What to give each contractor
Ask for itemised numbers rather than one allowance labelled ‘build’. Request VAT-inclusive and net figures where relevant, provisional allowances, named exclusions, expected variation mechanism and projected span. Compare contractors using the same drawing revision and finished-area basis.
Treat any blank item as an unknown to resolve. If a quote uses a different size, service package or foundation, ask for a revised tender before ranking it on total price.
Contractor quotation brief
Send the same finished specification and drawing revisions to each bidder.
Download the contractor quotation brief
| Field | Your record |
|---|---|
| Site and actual use | — |
| Drawing revisions and floor-area denominator | — |
| Ground investigation and building specification | — |
| Line prices, VAT and allowance assumptions | — |
| Exclusions and responsible party | — |
| Change, variation and approval point | — |
| Programme dependencies, care and handover | — |
| Quote date and validity | — |
Related guides
Sources and checks
The London brick garden house has a published construction cost and gross internal area. The Hove budget covers two SIP studios with brick slips. The £24,000 example illustrates the calculation only. Check the date, which floor area was measured and what each price still leaves out. Obtain a current itemised quote before comparing costs.
- LCS EcoBuild: actual garden room construction sequence — actual garden room construction sequence Checked 20 November 2026.
- Preformed Substructures: masonry room in a root-protection area — masonry room in a root-protection area Checked 20 November 2026.
- FAB Architects: Hove Hidden Studios — Hove Hidden Studios Checked 21 November 2026.
- Building Regulations 2010 regulation 9 — Building Regulations 2010 regulation 9 Checked 21 November 2026.
- Nick Hill Architects, Notting Hill Garden House — Designer-reported construction cost, gross internal area, project dates, masonry and scope for one London garden house. Checked 21 November 2026.
- Architects’ Journal, Notting Hill Garden House project data — Separate internal and combined internal/external areas, reported contract cost and the published unit cost on the larger area basis. Checked 21 November 2026.