Keep the written terms
Find out who covers each part.
If the roof leaks, who investigates and who pays for access and repairs? Get the written cover and care instructions for the frame, roof, installation and fittings before you buy.

Who pays for the part, labour and access?
Put the component, workmanship and access costs on separate lines. Confirm who would respond to each problem.

Put the structure, roof covering, installation, base, glazing and hardware, finishes and equipment on separate lines. For each one, copy the responsible business, start and end dates and the remedy. Ask who pays for diagnosis, labour, access and making good. Mark a missing written answer as ‘unconfirmed’. A pod delivered to an owner-prepared base can split responsibility between the manufacturer, installer and base contractor.
Check where the cover applies, the most it will pay, any excess and who pays to reach the fault and put things back afterwards. Keep the title and version of the document beside each answer.
Compare the promises before the years
- Framework. Noah describes ten years for its main framework, subject to its conditions. It describes a separate EPDM manufacturer term where that roofing is supplied. Noah guarantee and warranty.
- Materials. PermaRoof describes material-only cover for eligible work by its trained contractors. Ask whose guarantee applies to the exact membrane and installation. PermaRoof’s named material cover.
- Workmanship. BMI Icopal’s named schemes differ in labour scope and what happens to workmanship cover when the contractor ceases trading. BMI’s comparison of named schemes.
Record what your quote promises
The roof membrane has a stated term in the quote. Labour and access remain unconfirmed until the certificate is issued. Mark other missing answers as unconfirmed and request the issued documents at handover.
| Component | Named guarantor | Document and version | Start and end | Materials, labour and access | Exclusions and maintenance | Transfer | Contractor-failure trigger |
|---|---|---|---|---|---|---|---|
| Main frame | — | — | — | — | — | — | — |
| Base and groundworks | — | — | — | — | — | — | — |
| Roof membrane or system | — | — | — | — | — | — | — |
| Installation workmanship | — | — | — | — | — | — | — |
| Glazing, locks and hardware | — | — | — | — | — | — | — |
| Finish or cladding | — | — | — | — | — | — | — |
| Electrical and mechanical equipment | — | — | — | — | — | — | — |
Keep the evidence you would need for a claim.
Log the handover, care tasks and first observation so the guarantor can identify the building and the relevant terms.
At handover, keep the quote and revisions, invoice, installation date, certificates, product identifiers, and a copy of the maintenance requirements. Record completed care and retain receipts or photos. Ask where to notify a suspected defect, what evidence to attach and whether the guarantor needs an opportunity to inspect before repairs are undertaken.
Ask who covers diagnosis, labour, access and reinstatement. Keep date-stamped correspondence and photographs. Arrange appropriate urgent safety help where needed before collecting evidence or waiting for an inspection. Follow the actual reporting terms before starting elective third-party work.
For qualifying consumer goods guarantees, section 30 of the Consumer Rights Act 2015 requires plain claim information, details of the guarantor and the term and territory. Statutory rights remain alongside the guarantee. Section 49 includes a reasonable care and skill term for consumer services. Seek advice for a disputed contract, applicable remedy or deadline. Consumer Rights Act section 30 Section 49.
Record care and claims together
Use a separate dated entry each time you perform care, report a defect or receive an inspection response.
Download the maintenance and claim record
| Field | Your record |
|---|---|
| Order and site reference | — |
| Handover and date basis | — |
| Certificate and policy IDs | — |
| Care task, owner, due date and evidence | — |
| First observation and records | — |
| Notification date and reference | — |
| Inspection requested and response | — |
| Sale or transfer consent and deadline | — |
| Contractor cessation record | — |
| Insurer failure record | — |
Who handles a claim if the contractor closes or you sell?
Identify the contractor, guarantor and insurer by their legal names before following a claim, transfer or creditor route.
Three situations to check
- Selling the property. Ask about transfer consent, fee, deadline and remaining term.
- Contractor ceases trading. Check component cover, the issued policy’s trigger and the applicable insolvency route.
- Insurer fails. Check eligibility with FSCS for the policy and insurer.
An insurance-backed guarantee has its own policy trigger, exclusions, insured party and claim process. Ask who underwrites it, when the room will be registered and when you receive documents. Check whether the contractor must have ceased trading within the policy definition and whether the work at issue was included. Policy cover and deposit protection are separate questions. Check the legal contractor and complete policy dates against the order and registration. IWA’s example policy process.
For a sale, read the original guarantee and any insurance policy separately. IWA’s example requires an application and an originally transferable contractor guarantee. A fee may apply. Check the terms and remaining period for your own documents. IWA transfer conditions.
If the contractor ceases trading, identify the legal entity and check which guarantors and insurers remain available. In England and Wales the GOV.UK creditor route applies after a bankruptcy or winding-up order. Being listed as a creditor does not guarantee payment. Scotland and Northern Ireland have separate guidance. Creditor registration Insolvency Service jurisdiction links.
If the insurer itself has failed, check your policy and eligibility with the Financial Services Compensation Scheme. The scheme can help eligible customers of insurers regulated by the Prudential Regulation Authority, subject to its conditions and limits. FSCS insurance protection conditions.
Complete the matrix against the quote, then obtain the issued documents at handover. Keep any open cover question alongside the scope of the quote.
Related guides
Sources and checks
We compared published UK supplier and scheme information with statutes and official guidance. The named examples illustrate how written terms differ. Eligibility, transfer, dates, liability and remedies depend on the issued documents, facts and jurisdiction.
- Noah framework guarantee and reporting procedure — Separate framework and EPDM terms and an example of notification. Checked 21 November 2026.
- PermaRoof RubberCover FAQ: inspections and separate warranties — An example of material-only cover tied to eligible installation. Checked 21 November 2026.
- BMI Icopal named guarantee comparison — Differences in labour and workmanship scope across the named roof schemes. Checked 21 November 2026.
- IWA FAQ: issued policy, transfer and failure triggers — Named example of policy registration, conditions and transfer. Checked 21 November 2026.
- Consumer Rights Act 2015 section 30 — Disclosure requirements for qualifying consumer goods guarantees. Checked 21 November 2026.
- Consumer Rights Act 2015 section 49 — The reasonable care and skill term for consumer services. Checked 21 November 2026.
- GOV.UK creditor registration — Formal creditor registration after a court order in England and Wales. Checked 21 November 2026.
- FSCS insurance protection — Eligibility and limits for customers of a failed PRA-regulated insurer. Checked 21 November 2026.
- Insolvency Service help and jurisdiction links — Links to separate insolvency routes in Scotland and Northern Ireland. Checked 21 November 2026.