GARDEN ROOM THERMAL ASSEMBLY AND SUPPLIER EVIDENCE CHECKLIST Project, use and selected room: Drawing revision, designer and supplier: Record the complete finished wall, floor, roof/ceiling and opening build-ups. COPY FOR EACH ASSEMBLY OR JUNCTION Selected assembly or detail and revision reference: Which part does each U-value or other thermal figure cover? How was it tested or calculated? Structural path, support, connections and design evidence: Insulation product and extent, panel depth and finished assembly dimensions: Finished lining and junction with base, wall, roof and penetrations: Base, sill, frame, seals, threshold and their continuity details: Whole-window/door data, glass-only data, glare, opening and cleaning notes: Weather protection, ground moisture and vapour-control roles: Air-control continuity and separate occupant ventilation plan: Inspection, build-stage photos and record before work closes: Agreed service changes and who verifies the updated details: Open evidence, named designer or supplier and due date: