GARDEN ROOM SERVICE-ROUTE WORKSHEET Use this record for the building supplier and the electrical, plumbing and drainage team. Mark what you still need to find out. Leave the survey fields for the responsible professional. PROJECT AND PLAN Address / drawing revision / survey date: Sketch space or attached plan reference: Fixture / outlet and intended occupancy: Power, data, clean-water, foul and rainwater endpoints: Route length and obstacles / pavement / reinstatement for each service: Proposed wall or floor entry for each service: Designer, electrician and plumber or drainage contractor: Agreed sequence and any shared route / separation / protection decision: RESPONSIBLE PROFESSIONAL SURVEY Common datum and measured spot levels: Outlet and receiving connection level: Location and status of existing buried services: System and ownership confirmed or unresolved: Retained route alternatives, reasons and practical access: Discharge capacity, gravity or designed alternative and maintenance: Applicable building control and separate undertaker connection / build-near decisions: Private-drain owner or rights holder and permission reference: Who supplies, tests, reinstates and hands over each connection: WATER AND OPERATION Water source / available pressure and flow: Fixture list / simultaneous use / hot-water and temperature needs: Hot-water equipment / electrical coordination: Winter shut-off, frost protection and recommissioning agreed: Fault response and maintenance owner: Plan, survey or permission supporting this record: Open decision, owner and date: