GARDEN ROOM BUILDING REGULATIONS — PROJECT INFORMATION CHECKLIST Garden Building Guide | Sources checked 20 November 2026 The accompanying building-regulations guide explains the detailed rules for England. Check which nation and regulatory route apply to your property. This is an editable evidence brief, not an application, exemption certificate, professional review, design or approval. Save your own completed copy. Project / brief version: ____________________ Prepared by / date: ____________________ Drawing and specification version: ____________________ Mark each fact measured, estimated or unknown. Keep supporting documents attached. LINE: Nation, address and building-control contact Full address / jurisdiction / chosen body or enquiry contact: ___________________ Evidence reference and date: ____________________ Open question / action owner / due date: ____________________ LINE: Property and proposed use Existing property type / activities / sleeping / clients or staff: ______________ Future changes: ____________________ Evidence reference and date: ____________________ Open question / action owner / due date: ____________________ LINE: Finished floor area Scaled plan / every floor: ____________________ Internal finished dimensions or open floor edges / calculation: ________________ Evidence reference and date: ____________________ Open question / action owner / due date: ____________________ Use the statutory area basis, not the external catalogue footprint or clear desk space. Do not round uncertain measurements down to fit a threshold. LINE: Detached status, storeys and boundaries Connections to other buildings / elevations: ____________________ Nearest-point curtilage distances: ____________________ Evidence reference and date: ____________________ Open question / action owner / due date: ____________________ LINE: Construction and materials Wall, roof, floor and finish build-ups: ____________________ Evidence for non-combustible claims: ____________________ Evidence reference and date: ____________________ Open question / action owner / due date: ____________________ LINE: Ground, foundations and loads Survey / ground and load evidence: ____________________ Proposed slab or screw system / designer: ____________________ Evidence reference and date: ____________________ Open question / action owner / due date: ____________________ LINE: Services and associated work Water and hot water / drainage / electricity / ventilation: _____________________ Source and destination / house work: ____________________ Evidence reference and date: ____________________ Open question / action owner / due date: ____________________ LINE: Design, editions and submission route Designer and installer roles: ____________________ Applicable requirements and editions / route / unresolved evidence: ____________ Evidence reference and date: ____________________ Open question / action owner / due date: ____________________ LINE: Inspections and handover records Stages / who arranges checks: ____________________ Expected records / responsible issuer / delivery point: ____________________ Evidence reference and date: ____________________ Open question / action owner / due date: ____________________ RESPONSE RECORD — COPY FOR EACH WORK ITEM Building / service / associated work: ____________________ Assessor and role: ____________________ Drawing/use version: ____________________ Conclusion and basis: ____________________ Requirements or route: ____________________ Evidence still needed: ____________________ Reference and date: ____________________ Record exactly which work the response covers, not just the word exempt. RESPONSIBILITY RECORD Who designs each part: ____________________ Who makes required submissions or notifications: ____________________ Who calls for inspections: ____________________ Who resolves design/use changes: ____________________ Deliverables included in the quote / exclusions: ____________________ HANDOVER RECORD — COPY FOR EACH EXPECTED DOCUMENT Document or certificate expected: ____________________ Work covered: ____________________ Issuer: ____________________ Due date: ____________________ Received reference/date: ____________________ Identify the records applicable to this work and route. An exempt small building does not automatically receive a whole-building completion certificate. Keep electrical inspection/test records and relevant compliance records distinct. Include installation instructions and final drawings where appropriate. BEFORE RELYING ON THE RECORD Check whether floor area, sleeping use, structure, position or services have changed. Obtain assessment of the revised brief where needed. Building-regulations and planning decisions are separate. Ground screws and insulation marketing labels do not create an exemption or demonstrate complete compliance. OFFICIAL STARTING POINTS England: https://www.gov.uk/building-regulations-approval Current regulations: https://www.legislation.gov.uk/uksi/2010/2214/data.html Retained service requirements: https://www.legislation.gov.uk/uksi/2010/2214/regulation/9/data.html Wales: https://www.gov.wales/building-regulations-approved-documents Scotland: https://www.mygov.scot/building-warrant Northern Ireland: https://www.buildingcontrol-ni.com/regulations For a real or borderline project, give the complete brief to the relevant competent designer/adviser and building-control body. No fee, timing or outcome is assumed.