GARDEN ROOM PERMISSIONS: ENQUIRY BRIEF AND DECISION REGISTER Garden Building Guide | 20 November 2026 Save your copy of garden-room-permissions-worksheet.txt with your project records. This editable record is not a permission result, professional approval or certificate. Start with the property’s UK nation. Do not transfer planning or building-regulation limits between nations. Keep planning, building regulations or warrant, protected-site consents, private rights and service-owner questions separate. ENQUIRY BRIEF LINE: Property and authority Address, UK nation, relevant planning authority and building-control or building-standards contact. Record: LINE: Existing property and history House or other property type, previous conversions and extensions, planning references and conditions; mark unknown facts. Record: LINE: Actual use People, activities, hours, visitors, staff, deliveries, sleeping, letting and every proposed amenity, including later phases. Record: LINE: Site and drawings Scaled location and site plans, drawing date and revision, existing buildings, boundaries, levels and proposed dimensions; state the measurement basis. Record: LINE: Constraints and rights Known designations, protected features, title or lease restrictions, access rights and any records still needed. Record: LINE: Construction and services Proposed materials and build-ups, power, water, hot water and drainage routes, equipment and existing service assets. Record: LINE: Photographs and supporting records Dated views of the plot, neighbouring context, access and relevant features; attach supplier drawings as evidence, not approval. Record: LINE: Specific questions and next action For each separate check: recipient, exact question, evidence supplied, missing information, who obtains it and the next step. Record: DECISION REGISTER The starting status of each row is NOT CHECKED. Identify the actual recipient and replace the blank fields with evidence. CHECK: Planning route and use Who to approach: Relevant planning authority; a planning adviser can help prepare the enquiry. Evidence to prepare: Property history, intended use, site plan, dimensions and any proposed changes. Starting status: Not checked. Record the route, response and drawing revision. Actual recipient: Question sent: Date and reference: Drawing revision and use description: Response and its scope: Response type (informal advice / more evidence needed / application decision / certificate / other): Missing evidence or next action: Responsible person and review date: CHECK: Building regulations or warrant Who to approach: Applicable building-control body; Scotland’s council building standards department. Evidence to prepare: Construction, use, correctly defined floor area, services and relevant specifications. Starting status: Not checked. Record scope, application or exemption basis and outstanding evidence. Actual recipient: Question sent: Date and reference: Drawing revision and use description: Response and its scope: Response type (informal advice / more evidence needed / application decision / certificate / other): Missing evidence or next action: Responsible person and review date: CHECK: Protected site or additional consent Who to approach: Relevant authority or specialist team for the identified constraint. Evidence to prepare: Designations, listed status, trees, previous conditions or other site-specific records. Starting status: Not checked. Name each additional question rather than assuming one permission covers it. Actual recipient: Question sent: Date and reference: Drawing revision and use description: Response and its scope: Response type (informal advice / more evidence needed / application decision / certificate / other): Missing evidence or next action: Responsible person and review date: CHECK: Land and private rights Who to approach: Landowner, freeholder or other rights holder; legal adviser where needed. Evidence to prepare: Title, lease, covenants, access rights and any proposed work on another person’s land. Starting status: Not checked. Keep the consent or advice separate from the planning response. Actual recipient: Question sent: Date and reference: Drawing revision and use description: Response and its scope: Response type (informal advice / more evidence needed / application decision / certificate / other): Missing evidence or next action: Responsible person and review date: CHECK: Connections and service assets Who to approach: Relevant service owner or operator and the appointed competent designer or installer. Evidence to prepare: Proposed supply and discharge destinations, existing assets, routes and access for work. Starting status: Not checked. Record any required consent, design evidence and responsible party. Actual recipient: Question sent: Date and reference: Drawing revision and use description: Response and its scope: Response type (informal advice / more evidence needed / application decision / certificate / other): Missing evidence or next action: Responsible person and review date: BEFORE RELYING ON AN ANSWER Record the author, body, date, reference, drawing revision and use considered. Keep informal advice and formal decisions distinct. Check current submission requirements with the relevant body. Revisit the answer when the layout, heights, services or use change. A planning-lawfulness certificate does not settle other legal requirements. A supplier drawing, general online checker or this worksheet is not such a certificate. OFFICIAL NATIONAL STARTING ROUTES England planning: https://www.gov.uk/guidance/when-is-permission-required England building regulations: https://www.gov.uk/building-regulations-approval Scotland planning: https://www.mygov.scot/build-shed-garage-greenhouse Scotland building warrant: https://www.mygov.scot/building-warrant Wales planning: https://www.gov.wales/planning-permission-outbuildings Wales building-regulation documents: https://www.gov.wales/building-regulations-approved-documents Northern Ireland planning: https://www.nidirect.gov.uk/articles/planning-permission-when-apply Northern Ireland building regulations: https://www.finance-ni.gov.uk/articles/building-regulations-northern-ireland This ordinary text download does not send the brief to Garden Building Guide, a council or a supplier. Save and edit your own copy, then choose what to share.