GARDEN ROOM CONSTRUCTION — SCOPE AND HANDOVER SHEET Garden Building Guide | Sources checked 20 November 2026 Use this with the construction and installation guide to record who will do each job. Save your own copy. This is a coordination record, not a foundation, structural, excavation or lifting design, a required inspection, or approval of a construction method. Project / brief version: ____________________ Supplier and drawing reference: ____________________ Prepared by / date: ____________________ SEVEN WORK PACKAGES — COMPLETE FOR EACH PROPOSAL Use included / separately priced / buyer-arranged / unresolved for inclusion status. Unknown work and cost stay visible. A blank is not a zero-cost inclusion. PACKAGE: Base Inclusion status: ____________________ Supplier/installer: ____________________ Evidence reference: ____________________ Price or unresolved cost: ____________________ PACKAGE: Weatherproof shell Inclusion status: ____________________ Supplier/installer: ____________________ Evidence reference: ____________________ Price or unresolved cost: ____________________ PACKAGE: Insulation Inclusion status: ____________________ Supplier/installer: ____________________ Evidence reference: ____________________ Price or unresolved cost: ____________________ PACKAGE: Interior finishes Inclusion status: ____________________ Supplier/installer: ____________________ Evidence reference: ____________________ Price or unresolved cost: ____________________ PACKAGE: Assembly Inclusion status: ____________________ Supplier/installer: ____________________ Evidence reference: ____________________ Price or unresolved cost: ____________________ PACKAGE: Service connections Inclusion status: ____________________ Supplier/installer: ____________________ Evidence reference: ____________________ Price or unresolved cost: ____________________ PACKAGE: Completion records Inclusion status: ____________________ Supplier/installer: ____________________ Evidence reference: ____________________ Price or unresolved cost: ____________________ FOUR CHECKPOINTS CHECKPOINT: Survey and scope Site/use brief, drawings, specification, priced inclusions/exclusions and unresolved ground/access, permissions and design evidence. Evidence/version: ____________________ Responsible person: ____________________ Open item: ____________________ Next action and due date: ____________________ Response reference/date: ____________________ CHECKPOINT: Base and services Coordinated supports, levels, routes, entry points, sequence, inspection needs, readiness criteria and reinstatement scope. Evidence/version: ____________________ Responsible person: ____________________ Open item: ____________________ Next action and due date: ____________________ Response reference/date: ____________________ CHECKPOINT: Delivery and assembly Component/method plan, access, working space, protection, readiness, change/delay arrangements and making good. Name the competent lift planner where needed. Evidence/version: ____________________ Responsible person: ____________________ Open item: ____________________ Next action and due date: ____________________ Response reference/date: ____________________ CHECKPOINT: Inspected handover Agreed checks, records, instructions, final specification, defect/unfinished-work list and responsible parties with agreed resolution dates. Evidence/version: ____________________ Responsible person: ____________________ Open item: ____________________ Next action and due date: ____________________ Response reference/date: ____________________ HANDOVER RECORD — IDENTIFY WHICH ITEMS APPLY LINE: Final dimensions and specification As-built measurements / drawing version / approved changes: ____________________ Evidence / responsible person / outstanding action: ____________________ LINE: Building inspection and defects Agreed checks / photographs / defect or unfinished-work list: ___________________ Evidence / responsible person / outstanding action: ____________________ LINE: Installed products and instructions Models / manuals / controls demonstration / maintenance access: _________________ Evidence / responsible person / outstanding action: ____________________ LINE: Electrical and service records Relevant inspection/test and compliance records / commissioning / issuer: _______ Evidence / responsible person / outstanding action: ____________________ LINE: Other applicable approval records Required completion or other records / work covered / reference: ________________ Evidence / responsible person / outstanding action: ____________________ LINE: Care and maintenance Roof, drainage, cladding and finish care / intervals / responsibilities: __________ Evidence / responsible person / outstanding action: ____________________ LINE: Warranty and aftercare Written scope / exclusions / care conditions / claim contact: ___________________ Evidence / responsible person / outstanding action: ____________________ LINE: Making good and open actions Access repairs / reinstatement / waste removal / action owner / agreed date: _____ Evidence / responsible person / outstanding action: ____________________ DOCUMENT OR UNRESOLVED-ITEM FOLLOW-UP — COPY AS NEEDED Item: ____________________ Received reference/date: ____________________ Missing information: ____________________ Person responding: ____________________ Follow-up date: ____________________ Keep guarantees and care instructions for the actual products supplied. Supplier warranties are distinct from applicable building or service records. Confirm who owns design, inspection, protection, spoil removal, reinstatement and making good. No generic construction label establishes the complete scope or technical outcome.