GARDEN ROOM USES — ACTIVITY AND CHANGEOVER BRIEF Garden Building Guide | Sources checked 20 November 2026 Use this with the garden room uses guide. Fill in a copy for the activities you’re planning and choose who sees it. This is a requirements brief, not an equipment-fit test, building design, risk assessment or approval of a particular use. Project / brief version: ____________________ Prepared by / date: ____________________ Mark each measurement confirmed, estimated or unknown. Attach model instructions and occupied layouts, including a second layout where the room changes use. LINE: People, activities and hours Primary/secondary uses / users / visitors / occupied hours: ____________________ Evidence reference or open question: ____________________ LINE: Simultaneous use and changeover Activities together or separate / items moved / storage / reset: ______________ Evidence reference or open question: ____________________ LINE: Equipment and operating space Model / manufacturer dimensions and instructions: ____________________ Movement / ceiling needs: ____________________ Evidence reference or open question: ____________________ LINE: Furniture, storage and access Retained items / work in progress / accessible routes: ____________________ Delivery and maintenance: ____________________ Evidence reference or open question: ____________________ LINE: Structure, floor and surfaces Equipment loads / impact / floor finish / wet or dusty processes: ______________ Evidence reference or open question: ____________________ LINE: Services and comfort Power / data / water / drainage / ventilation / heating / lighting: _____________ Evidence reference or open question: ____________________ LINE: Noise, privacy and neighbours Sound sources / timing / people affected / performance to assess: _____________ Evidence reference or open question: ____________________ LINE: Use, permissions and responsibilities Nation / actual use / clients / facilities / assessor / unresolved actions: _____ Evidence reference or open question: ____________________ CHANGEOVER CHECKLIST — COPY FOR EACH PAIR OF ACTIVITIES Mode A / occupied layout reference: ____________________ Mode B / occupied layout reference: ____________________ CHECK: Timing Which activities happen together? Which need the room empty first? _____________ CHECK: Movement What moves, who moves it and does the product permit that method? ______________ CHECK: Storage Where does every displaced item go, clear of circulation/required spaces? ______ CHECK: Connections What happens to cables, power, data and hoses? ____________________ CHECK: Surfaces What protection, cleaning or drying is needed before the next activity? ________ CHECK: Noise and light What music, exercise, lighting or screen-glare conflicts need resolution? _______ CHECK: Reset Who restores the first layout, with what real effort and time? _________________ Unresolved changeover action / owner: ____________________ SUPPLIER RESPONSE — COPY FOR EACH RESPONSE OR WORK ITEM Drawing/specification version: ____________________ What is included: ____________________ Assumption or exclusion: ____________________ Evidence or test proposed: ____________________ Responsible person: ____________________ Open action and due date: ____________________ Keep manufacturer evidence attached to the actual model. An equipment footprint is not necessarily its space with clearance for use. No generic room minimum is assumed. Describe sleeping, independent occupation, staff and client visits explicitly where proposed; a multi-purpose label does not resolve permissions. The private project planner can hold requirements and open questions. It does not test golf swings, specify floor loads, assess acoustics or approve an activity.