GARDEN ROOM ACCESS WORKSHEET Garden Building Guide | Worksheet version: 20 November 2026 Companion guide: Restricted garden access: measure the whole journey. Fill in a copy on your computer or print it and take it along the delivery route. Keep it with your numbered route sketch, photographs and supplier confirmation. You choose who receives it. It is not proof of fit or a safe-handling plan. There is no universal minimum gate width. Record the complete vehicle-to-site route and obtain confirmation for the actual selected components and method. 1. PROJECT RECORD Project / selected model: ______________________________ Route sketch version / date: ______________________________ Supplier / survey contact: ______________________________ Proposed unloading point: ______________________________ Quote reference: ______________________________ 2. COMPLETE ROUTE MEASUREMENTS Give each pinch point a number on the sketch. Photograph it in both directions. Use clear dimensions between obstructions, including hinges, handles, drainpipes, eaves and thresholds. Record the door/gate position used. Label unknown or approximate information rather than filling gaps by assumption. Road and unloading: record restrictions, available space, surface, permitted times and distance to the first opening. Obtain vehicle, unloading/staging and permission requirements from the supplier. Notes: ______________________________ Gate or doorway: record clear width, height, threshold and projections. Confirm handling clearance and any authorised temporary removal. Notes: ______________________________ Passage or turn: record widths before/after each corner, turning space, headroom and overhead obstacles. Ask what site check/template is appropriate. Notes: ______________________________ Steps or slope: record step count, each rise and tread, widths, landings, slope, surface and overhead restrictions. Obtain the planned handling method. Notes: ______________________________ Garden/work area: record remaining carry distance, soft ground, planting, storage/staging and working space. Confirm assembly, waste and later access. Notes: ______________________________ REPEAT THIS RECORD FOR EVERY NUMBERED POINT Point number / location: ______________________________ Clear width / height: ______________________________ Door or gate position / threshold / projections: __________________________ Turn: passage widths on both sides / turning space: _______________________ Steps: count / each rise and tread / width / landings: _____________________ Slope / level change / surface: ______________________________ Overhead restrictions: ______________________________ Distance to next point / remaining carry distance: ________________________ Photograph reference: ______________________________ Installer decision / outstanding check: ______________________________ Evidence reference / confirmed by / date: ______________________________ A measurement records geometry; it does not certify safe handling. 3. COMPONENT AND HANDLING REGISTER Repeat for every part that may limit the route. The longest, widest and heaviest component may be different items. Flat pack does not prove fit. Component and model: ______________________________ Packaged length x width x thickness: ______________________________ Weight / carrying frame or other equipment: ______________________________ People, handling space and method: ______________________________ Route check / unresolved point: ______________________________ Evidence reference / confirmed by / date: ______________________________ Ask whether a site visit or additional evidence is required. Supplier-specific representative panel dimensions are not your selected model's final schedule. Report changes to gates, parking, landscaping, the product or the agreed route. 4. POSSIBLE ROUTE AND ITS CONDITIONS Proposed approach: side route / through house / agreed neighbouring or shared route / professionally assessed lift / another supplier-assessed proposal Description and unresolved conditions: ______________________________ Through-house checks: front entrance, internal doors, turns, ceilings, flooring transitions, stairs if relevant and final exit. Identify staging, protection, furniture moves, permitted removals/refitting and occupant access. Notes: ______________________________ Neighbour/shared route: establish actual rights and required written agreement, limits, timing, protection and damage/reinstatement responsibility. Notes: ______________________________ Proposed lift: obtain competent feasibility and planning, relevant permissions, responsibilities and site-specific quotation. This sheet does not select equipment, prescribe a lift or estimate capacity/cost. Notes: ______________________________ 5. PROTECTION, CONSENT AND COST RESPONSIBILITIES For every line record the scope, named owner, evidence and price status. Use Included, Priced extra, Excluded or Unknown. Unknown is not £0. Keep amounts on a consistent VAT basis; ask suppliers to clarify ambiguity. LINE: Parking, unloading and permissions Scope (location, times, vehicle, permissions): ____________________________ Responsible party: ______________________________ Permission or document reference/date: ______________________________ Status / amount / VAT basis: ______________________________ Unresolved action / owner / due date: ______________________________ LINE: Additional carrying labour and equipment Scope (method, people/equipment, carry route): ____________________________ Responsible party: ______________________________ Permission or document reference/date: ______________________________ Status / amount / VAT basis: ______________________________ Unresolved action / owner / due date: ______________________________ LINE: Temporary removals and reinstatement Scope (items, authority, removal/refitting, completion standard): __________ Responsible party: ______________________________ Permission or document reference/date: ______________________________ Status / amount / VAT basis: ______________________________ Unresolved action / owner / due date: ______________________________ LINE: House and garden protection Scope (floors, frames, surfaces, planting, furniture, damage procedure): ____ Responsible party: ______________________________ Permission or document reference/date: ______________________________ Status / amount / VAT basis: ______________________________ Unresolved action / owner / due date: ______________________________ LINE: Occupants, working hours and route availability Scope (access arrangements, staging, route availability): _________________ Responsible party: ______________________________ Permission or document reference/date: ______________________________ Status / amount / VAT basis: ______________________________ Unresolved action / owner / due date: ______________________________ LINE: Waste, clean-up and later access Scope (waste route/disposal, clean-up, making good, maintenance): ___________ Responsible party: ______________________________ Permission or document reference/date: ______________________________ Status / amount / VAT basis: ______________________________ Unresolved action / owner / due date: ______________________________ Send the route information to groundworks and electrical contractors too. Panels are only part of the job; soil/waste, tools and later replacement materials also need a route. Do not count the same included charge twice. 6. WRITTEN CONFIRMATION BEFORE RELYING ON DELIVERY [ ] Selected components and handling proposal checked against dated route. [ ] Protection, removals, consent, reinstatement and owners recorded. [ ] Extra labour, equipment, parking and waste costs have status/VAT basis. [ ] Unresolved checks have owners/dates; permission/feasibility not assumed. [ ] Quote records change approval and delay/aborted-delivery terms. Accepted route / component version: ______________________________ Written confirmation reference / date: ______________________________ Outstanding conditions: ______________________________ Change and aborted-delivery terms reference: ______________________________ Resolve remaining conditions before relying on the proposed arrangement. An accessible route is not necessarily included in an advertised price. Keep the accepted access plan with the order and tell the supplier if it changes. The Garden Building Guide planner records a private requirements brief; it does not send enquiries or measurements to installers.