INSULATED GARDEN ROOM SPECIFICATION COMPARISON Garden Building Guide | Worksheet version: 20 November 2026 Companion guide: Garden office insulation: compare the complete room. Edit this blank UTF-8 text file in your own text editor or document, or print it. Use the same comfort brief for both candidates. Keep quotations, drawings and evidence reports with this comparison. You decide who receives your document. This is not a thermal design, comfort guarantee or regulatory approval. 1. COMMON COMFORT BRIEF Project / brief version / date: ______________________________ Occupied hours and desired comfort (people, activities, season, schedule): ___ Location and exposure (site, wind, glazing orientation, shade): _____________ Heating and start time (when ready, proposed system, design questions): _____ Ventilation and moisture (activities, equipment, unresolved questions): ____ Summer use and equipment heat (solar gain, occupancy, devices, response): ___ Required finished internal space / clear height: __________________________ 2. COMPARISON RULES Compare the exact model, drawing and specification revision being quoted. For each answer record the specification, evidence reference/date, inclusion status, responsible party and unresolved question. Use Included, Priced extra, Excluded or Unknown. Missing evidence is Unknown, not a favourable score. Record amount/VAT basis/quote reference for extra costs. Keep material data, assembly evidence and whole-building claims separate. Material lambda is thermal conductivity in W/(m.K). Assembly U-value is thermal transmittance in W/(m2.K). A material datasheet is not a test of the installed room. A wall U-value does not establish indoor temperature, air leakage, running costs or compliance. For windows/doors, distinguish whole-unit from centre-pane glazing values. 3. PAIRED SPECIFICATION RECORDS LINE: Supplier, exact model and revision Candidate A specification / answer: ______________________________ A evidence reference/date / status / responsible party: ___________________ A unresolved question: ______________________________ Candidate B specification / answer: ______________________________ B evidence reference/date / status / responsible party: ___________________ B unresolved question: ______________________________ LINE: Delivered and installed scope Candidate A specification / answer: ______________________________ A evidence reference/date / status / responsible party: ___________________ A unresolved question: ______________________________ Candidate B specification / answer: ______________________________ B evidence reference/date / status / responsible party: ___________________ B unresolved question: ______________________________ Distinguish installed insulation, supplied material and a structure merely prepared for insulation. Identify work assigned to another trade. LINE: Wall, floor and roof assemblies Candidate A layers / thicknesses / named products: _________________________ A evidence reference/date / status / responsible party: ___________________ A unresolved question: ______________________________ Candidate B layers / thicknesses / named products: _________________________ B evidence reference/date / status / responsible party: ___________________ B unresolved question: ______________________________ Record structure, insulation, service zones, linings and exterior finishes. A cavity dimension is not an installed insulation specification. LINE: Windows and doors Candidate A units / dimensions / value basis: _____________________________ A evidence reference/date / status / responsible party: ___________________ A unresolved question: ______________________________ Candidate B units / dimensions / value basis: _____________________________ B evidence reference/date / status / responsible party: ___________________ B unresolved question: ______________________________ LINE: Performance evidence Candidate A subject / units / calculated-tested-supplier-stated: ___________ A method/standard / report / assumptions / date: __________________________ A status / responsible party / unresolved question: _______________________ Candidate B subject / units / calculated-tested-supplier-stated: ___________ B method/standard / report / assumptions / date: __________________________ B status / responsible party / unresolved question: _______________________ Check the claimed assembly matches the delivered construction. Do not infer whole-building performance from a material property or one component value. LINE: Junctions, draughts and moisture Candidate A details / responsibility: ______________________________ A evidence reference/date / status / responsible party: ___________________ A unresolved question: ______________________________ Candidate B details / responsibility: ______________________________ B evidence reference/date / status / responsible party: ___________________ B unresolved question: ______________________________ LINE: Heating, controls and ventilation Candidate A included / extra / design responsibility: _____________________ A evidence reference/date / status / responsible party: ___________________ A unresolved question: ______________________________ Candidate B included / extra / design responsibility: _____________________ B evidence reference/date / status / responsible party: ___________________ B unresolved question: ______________________________ Insulation does not supply heat. Record the response to the common comfort brief. An included heater does not prove suitability or an electrical connection. LINE: Finished dimensions and clear heights Candidate A finished dimensions / drawing reference: ______________________ A evidence reference/date / status / responsible party: ___________________ A unresolved question: ______________________________ Candidate B finished dimensions / drawing reference: ______________________ B evidence reference/date / status / responsible party: ___________________ B unresolved question: ______________________________ Confirm external measurement basis and any projections/overhangs. Use finished internal drawings for furniture and occupied-chair checks. LINE: Installation and warranty conditions Candidate A scope / exclusions / owner: ______________________________ A evidence reference/date / status / responsible party: ___________________ A unresolved question: ______________________________ Candidate B scope / exclusions / owner: ______________________________ B evidence reference/date / status / responsible party: ___________________ B unresolved question: ______________________________ 4. PRICE AND OPEN QUESTIONS Candidate A extra cost / amount / VAT basis / quote reference: _____________ Candidate B extra cost / amount / VAT basis / quote reference: _____________ Unpriced required work: ______________________________ Unresolved evidence / person responsible / due date: _______________________ Do not count included work twice or treat an Unknown cost as zero. Use the separate quote comparison worksheet for the complete project budget. 5. SCOPE OF STANDARDS AND CLAIMS Property location / intended use: ______________________________ Applicable requirement / edition / transition confirmed by: _______________ Evidence supporting any compliance claim: ______________________________ England Approved Document L distinguishes dwellings and other buildings and applicable regulatory editions. It is not a universal UK garden-office target. Confirm the actual project's route; product data is not building approval. 6. SPACE EXAMPLE: GEOMETRY ONLY The guide assumes a 3.00 x 3.00m square between external wall faces, excluding projections and overhangs. Whole-wall build-up includes structure, insulation, service space and finishes on every side. A: 3.00 - 2 x 0.15 = 2.70m; 2.70 x 2.70 = 7.29m2. B: 3.00 - 2 x 0.20 = 2.60m; 2.60 x 2.60 = 6.76m2. Difference: 7.29 - 6.76 = 0.53m2. These are hypothetical total wall thicknesses, not insulation specifications, recommended dimensions or thermal designs. Neither example has a stated performance value, and the thicker wall is not shown to be warmer or better. 7. BEFORE ACCEPTING THE SPECIFICATION Accepted specification / drawing versions: ______________________________ Substitutions and their evidence: ______________________________ Who checks the installed details / when: ______________________________ Outstanding questions / owner / date: ______________________________ For an existing room, first assess actual construction, condition, membranes, space and services. This sheet supplies no retrofit layer sequence or instruction to fill an unknown cavity. The Garden Building Guide planner records a private requirements brief. It does not calculate thermal performance, certify comfort or send supplier enquiries.