GARDEN OFFICE HEATING DECISION SHEET Garden Building Guide | Worksheet version: 20 November 2026 Companion guide: Garden office heating: choose for your working day. Edit this blank UTF-8 text file in your own text editor or document, or print it. Give each proposed supplier/installer the same occupancy and warm-up brief. Keep written proposals, drawings, product manuals and commissioning records. You decide who receives your document. It is not a heat-loss calculation, heater-size recommendation, installation design or approval of an operating mode. 1. PROJECT RECORD Project / brief version: ______________________________ Selected room drawing: ______________________________ Assessor/contact: ______________________________ 2. OCCUPANCY AND WARM-UP BRIEF Finished room and construction Internal dimensions/height, assemblies, glazing, drawing reference: ________ Occupied hours and desired comfort People, activities, days/times, ready-to-work time: ________________________ Exposure and ventilation Site, weather exposure, glazing orientation, ventilation provision: _______ Warm-up evidence Starting/target conditions, system, test or estimate basis: _______________ Location and clearances Furniture, finishes, usable space, manufacturer-required clearances: ______ Supply and other equipment Proposed loads used together, supply assessment, future changes: __________ Unused periods and vulnerable items Absence dates, water/services, stored items, required protection: __________ Ask who checks the brief, designs the system and confirms its model, mounting, controls and supply. Do not fill gaps with generic watts-per-square-metre or warm-up-minute assumptions. Record conditions for any estimate or test. 3. CATEGORIES TO DISCUSS - Portable direct-electric heater: supervised occupied use only; placement, suitable supply, clearances and product controls need checking. - Fixed electric panel/radiator: mounting, supply, compatible controls and selected-product permitted operation need confirmation. - Electric underfloor: complete floor/system and finish compatibility, installation sequence, sensing and response need assessment. - Selected reversible air-to-air heat pump: heating/cooling need, equipment siting, routes, supply, controls, performance conditions and maintenance. These categories are not a universal best/cheapest ranking. Electric underfloor is not necessarily a water-pipe system. Separate electrical input from delivered heat output; a heat pump's heat-output rating is not its electricity input. 4. PAIRED DECISION RECORDS LINE: Model, category and suitability Proposal A details / answer: ______________________________ A evidence reference/date: ______________________________ A unresolved action / owner / due date: ______________________________ Proposal B details / answer: ______________________________ B evidence reference/date: ______________________________ B unresolved action / owner / due date: ______________________________ LINE: Electrical input and heat output Proposal A figures / operating conditions: ______________________________ A evidence reference/date: ______________________________ A unresolved action / owner / due date: ______________________________ Proposal B figures / operating conditions: ______________________________ B evidence reference/date: ______________________________ B unresolved action / owner / due date: ______________________________ LINE: Location, mounting and clearances Proposal A drawing / manual / required space: _____________________________ A evidence reference/date: ______________________________ A unresolved action / owner / due date: ______________________________ Proposal B drawing / manual / required space: _____________________________ B evidence reference/date: ______________________________ B unresolved action / owner / due date: ______________________________ LINE: Controls and warm-up evidence Proposal A model / scenario / commissioning check: ________________________ A evidence reference/date: ______________________________ A unresolved action / owner / due date: ______________________________ Proposal B model / scenario / commissioning check: ________________________ B evidence reference/date: ______________________________ B unresolved action / owner / due date: ______________________________ LINE: Supply and installation scope Proposal A included / extra / responsible party: __________________________ A evidence reference/date: ______________________________ A unresolved action / owner / due date: ______________________________ Proposal B included / extra / responsible party: __________________________ B evidence reference/date: ______________________________ B unresolved action / owner / due date: ______________________________ LINE: Unused-period strategy Proposal A approved installed mode / vulnerable services plan: ____________ A evidence reference/date: ______________________________ A unresolved action / owner / due date: ______________________________ Proposal B approved installed mode / vulnerable services plan: ____________ B evidence reference/date: ______________________________ B unresolved action / owner / due date: ______________________________ LINE: Commissioning, instructions and maintenance Proposal A records / contact / schedule: ______________________________ A evidence reference/date: ______________________________ A unresolved action / owner / due date: ______________________________ Proposal B records / contact / schedule: ______________________________ B evidence reference/date: ______________________________ B unresolved action / owner / due date: ______________________________ Proposal A installed price / VAT / exclusions: ____________________________ Proposal B installed price / VAT / exclusions: ____________________________ Unpriced required work: ______________________________ An included heater does not establish an included final house connection. Keep Unknown costs visible; do not enter zero without supporting scope. 5. YOUR OCCUPANCY AND CONTROLS SCHEDULE Repeat this record for each occupied or unused period. Day/period: ______________________________ Occupied hours: ______________________________ Ready-by time: ______________________________ Starting/target conditions: ______________________________ Approved installed mode/start strategy: ______________________________ Departure/absence action: ______________________________ Manual or installer reference: ______________________________ Check/review date: ______________________________ The guide's fictional schedule is only an occupancy example: - Monday/Thursday 09:00-17:00: full working day, ready at 09:00. - Tuesday 18:00-20:00: short occupied evening session. - Other hours/days: unoccupied. - A week away: no normal occupancy or daily check. It supplies no temperature, preheat duration or approved control setting. Automatic preheat/unoccupied operation requires a suitable installed system and a manufacturer/installer-approved plan. A timer does not make unattended portable heating acceptable. 6. PORTABLE SAFETY AND UNUSED PERIODS Electrical Safety First advises stable, level placement, at least one metre from combustible materials, no clothing drying on/close to the heater, no unattended or asleep use and no extension-lead supply. Follow the actual manual and any stricter clearances. Do not use an unattended portable heater for frost protection. Ask for a selected installed-system and property-specific unused-period plan. Room-air conditions do not automatically protect every pipe, appliance or item. Record water/services and storage requirements separately. Heating alone does not resolve moisture or ventilation questions. 7. OPTIONAL ENERGY ARITHMETIC RECORD Actual metered electrical energy / period: ______________________________ Actual tariff / date: ______________________________ Other loads and standing-charge treatment: ______________________________ Weather, occupancy and control assumptions: ______________________________ Fictional illustration only: 1.0kW electrical input drawn continuously for 4 hours = 4kWh. At fictional £0.25/kWh, that energy costs £1.00. This is not a tariff quote, heater-size recommendation, operating schedule or room forecast. Thermostat cycling and variable input alter actual consumption. Heat-pump output is not electricity input. Standing charges/other loads are excluded from the example. Real estimates need appropriate measurement/modelling. 8. HANDOVER Accepted model / control settings / record date: __________________________ Warm-up check conditions and result: ______________________________ Operating instructions / override / absence operation: ____________________ Maintenance requirements / aftercare contact: ____________________________ Outstanding items / owner / due date: ______________________________ The Garden Building Guide planner records a private brief. It does not size a heater, approve a safe operating mode or contact installers.