SHED OR SUMMERHOUSE TO GARDEN OFFICE — COMPARISON WORKSHEET Garden Building Guide · sources checked 21 November 2026 A commissioning record, not a condition survey, construction design, quote or permission to build. Safe accessible observations do not establish concealed condition, moisture causes, support capacity or suitability. List anything you can’t confirm for the person assessing the building. Do not climb onto a roof, lift an uncertain structure or open unidentified materials to fill this in. Arrange competent assessment where needed. EXISTING-BUILDING RECORD Use and existing building Shed / summerhouse / other; age and known alterations; people, tasks, hours, equipment and comfort/privacy needs: ____ Evidence and access limits Inspection date, safe accessible areas, photographs/documents, observer and areas not inspected: ____ Roof and weather entry Visible leaks, stains, damaged covering, junctions, gutters and openings; cause confirmed or unknown; assessor/action: ____ Walls, floor and base Visible distortion, softness, corrosion or movement; known construction/support and proposed loads; missing assessment: ____ Moisture and repair Observed sign versus diagnosed cause; proposed repair, drying/checks before covering, evidence and responsible person: ____ Existing internal faces Width/depth and height measurement faces; retained or removed layers, projections, lowest headroom and drawing/date: ____ Openings and routes Door/window operation, thresholds, working clearances, daily route and installation/removal access: ____ Services and permissions Known supply/data records, possible routes, nation/property/use/work, approval history and unresolved checks: ____ EVIDENCE TREE Can this structure meet your office brief? Define the use: People, tasks, hours and the space you need. 1. Is condition understood? Structure, roof, floor, base and moisture causes. Evidence recorded: continue to the next step. No / unknown — Investigate first. Commission assessment and identify repairs. Return with new evidence. 2. Does the finished space work? New linings, levels, furniture and openings included. Layout tested: continue to the next step. No / unknown — Revise or compare. Change the proposal or compare other options. Remeasure the revised layout. 3. Are dependencies scoped? Design, services, permissions and written costs. Dependencies recorded: continue to the next step. No / unknown — Resolve the questions. Name the evidence, responsible person and next action. Keep unknown costs visible. Compare written scopes: Conversion, repair and other options on the same brief. A next-step guide, not permission or approval to build. FINISHED-SPACE EXAMPLE — ALL DIMENSIONS FICTIONAL Existing room: 3.00m × 2.40m between the inward faces of existing wall linings which remain in place. New work projects 0.10m inward from each of those four faces. These are assumed intrusions, not recommended insulation thicknesses. Width: 3.00 − 0.10 − 0.10 = 2.80m. Depth: 2.40 − 0.10 − 0.10 = 2.20m. Area: 2.80 × 2.20 = 6.16m²; previously 7.20m²; reduction 1.04m². Separate flat-floor/flat-ceiling example: existing floor surface to existing ceiling underside 2.20m; new floor rises 0.08m, ceiling descends 0.06m. Result: 2.20 − 0.08 − 0.06 = 2.06m. These figures exclude skirtings, services, furniture and other projections. They are not comfort/access/headroom minima or regulatory floor-area decisions. Do not subtract a whole wall again from an already internal measurement. If layers are removed, name the new retained faces and record the net change. Map sloping/uneven heights where people actually sit, stand and move. COORDINATE THE PROPOSAL Roof/wall/floor weather and moisture protection, insulation, air/vapour strategy, junctions/openings, heating and deliberate ventilation need a coordinated design. No universal membrane position, layer thickness or ventilation rate is supplied. Insulation or a dehumidifier does not repair a leak. Diagnose and address causes and agree checks before covering. Ask the qualified electrician about actual loads, retained supply, internal work, house connection, testing and records. Identify the nation, property, use and work. England Part P/Planning Portal examples are not rules for Wales, Scotland or Northern Ireland. Planning, building control and other consents are separate questions. TWELVE WORK PACKAGES — REPEAT FOR EACH SHORTLISTED OPTION For EACH package below record its written scope and the following: Status: retained / included / priced extra / excluded / unknown Amount and VAT basis: ____ Quote/reference and date/validity: ____ Responsible person, evidence and next action: ____ A retained item still needs condition evidence. An unknown price is not zero. Survey and design Condition, structure/base, moisture diagnosis, measured drawings and coordinated proposed design: ____ Repairs and preparation Investigations, repairs, drying/verification, removal of unsuitable material and protection during work: ____ Base, structure and floor Retained supports, strengthening/replacement if designed, proposed loads, floor level and thresholds: ____ Roof, walls and weather protection Retained/replaced components, water shedding, junctions, openings and maintainable details: ____ Insulation and moisture control Roof/wall/floor build-ups, air/vapour strategy, junctions and resulting internal dimensions: ____ Doors, glazing and security Condition, structural opening changes, weather seals, operation, privacy/glare and security: ____ Heating and ventilation Occupancy, winter/summer needs, deliberate fresh-air provision, controls and maintenance: ____ Electricity and records Supply assessment, internal work, house connection, route/reinstatement, inspection/testing and applicable compliance records: ____ Internet and communications Existing-service tests, chosen connection route/equipment, installation and verification: ____ Permissions and professional fees Nation-specific planning/building-control route, design/application fees and other necessary consents: ____ Linings, finish and fit-out Finished faces/levels, flooring/decoration, furniture/equipment and safe installation requirements: ____ Access, waste and handover Temporary access/protection, waste/reinstatement, retained or salvaged items, instructions, guarantees and defects responsibilities: ____ FIVE OPTIONS — SAME WORK BRIEF Shed: condition, support, moisture, repairs and finished space; displaced storage. Summerhouse: same checks plus glazing, privacy/glare and winter/summer use. Garage: parking/storage lost, floor/moisture, openings/daylight, access, services, structural/envelope work and applicable approvals. Loft: stairs/access, structural/fire/building-control assessment, usable headroom, services and household disruption; roof volume is not usable office floor area. New detached office: finished internal plan, site/base/delivery/assembly/services, garden space, access and the future of the old building. Do not add an already owned shell's historic purchase price as new spending. Record genuine repairs, new work and disposal, and any evidenced salvage separately. Use the same VAT basis. Keep the non-duplicated quoted subtotal, buyer allowances and unpriced dependencies separate. No universal conversion price or saving. OPTION RECORD: SHED CONVERSION Option and scope Shed / summerhouse / garage / loft / new detached office; the same work brief, finish and usable-space basis: ____ Space and disruption Storage/parking/garden/house space surrendered, works access, temporary working arrangements and duration evidence: ____ Retained assets and new spending Existing items retained without adding historic purchase cost again; actual new quote lines and any evidenced salvage treatment: ____ Quoted subtotal and allowances Non-duplicated priced lines, quote date/validity and VAT basis; buyer assumptions totalled separately: ____ Unknowns and later costs Unpriced work, dependencies, maintenance/operating questions; amount if known, evidence owner and next action: ____ Decision and next evidence Investigate / revise / compare scoped options / defer; reason, responsible person, evidence needed and review date: ____ OPTION RECORD: SUMMERHOUSE CONVERSION Option and scope Shed / summerhouse / garage / loft / new detached office; the same work brief, finish and usable-space basis: ____ Space and disruption Storage/parking/garden/house space surrendered, works access, temporary working arrangements and duration evidence: ____ Retained assets and new spending Existing items retained without adding historic purchase cost again; actual new quote lines and any evidenced salvage treatment: ____ Quoted subtotal and allowances Non-duplicated priced lines, quote date/validity and VAT basis; buyer assumptions totalled separately: ____ Unknowns and later costs Unpriced work, dependencies, maintenance/operating questions; amount if known, evidence owner and next action: ____ Decision and next evidence Investigate / revise / compare scoped options / defer; reason, responsible person, evidence needed and review date: ____ OPTION RECORD: GARAGE CONVERSION Option and scope Shed / summerhouse / garage / loft / new detached office; the same work brief, finish and usable-space basis: ____ Space and disruption Storage/parking/garden/house space surrendered, works access, temporary working arrangements and duration evidence: ____ Retained assets and new spending Existing items retained without adding historic purchase cost again; actual new quote lines and any evidenced salvage treatment: ____ Quoted subtotal and allowances Non-duplicated priced lines, quote date/validity and VAT basis; buyer assumptions totalled separately: ____ Unknowns and later costs Unpriced work, dependencies, maintenance/operating questions; amount if known, evidence owner and next action: ____ Decision and next evidence Investigate / revise / compare scoped options / defer; reason, responsible person, evidence needed and review date: ____ OPTION RECORD: LOFT CONVERSION Option and scope Shed / summerhouse / garage / loft / new detached office; the same work brief, finish and usable-space basis: ____ Space and disruption Storage/parking/garden/house space surrendered, works access, temporary working arrangements and duration evidence: ____ Retained assets and new spending Existing items retained without adding historic purchase cost again; actual new quote lines and any evidenced salvage treatment: ____ Quoted subtotal and allowances Non-duplicated priced lines, quote date/validity and VAT basis; buyer assumptions totalled separately: ____ Unknowns and later costs Unpriced work, dependencies, maintenance/operating questions; amount if known, evidence owner and next action: ____ Decision and next evidence Investigate / revise / compare scoped options / defer; reason, responsible person, evidence needed and review date: ____ OPTION RECORD: NEW DETACHED OFFICE Option and scope Shed / summerhouse / garage / loft / new detached office; the same work brief, finish and usable-space basis: ____ Space and disruption Storage/parking/garden/house space surrendered, works access, temporary working arrangements and duration evidence: ____ Retained assets and new spending Existing items retained without adding historic purchase cost again; actual new quote lines and any evidenced salvage treatment: ____ Quoted subtotal and allowances Non-duplicated priced lines, quote date/validity and VAT basis; buyer assumptions totalled separately: ____ Unknowns and later costs Unpriced work, dependencies, maintenance/operating questions; amount if known, evidence owner and next action: ____ Decision and next evidence Investigate / revise / compare scoped options / defer; reason, responsible person, evidence needed and review date: ____ NEXT ACTION Unknown condition: commission assessment; do not assume reuse or demolition. Inadequate finished layout: revise or compare another option. Unresolved design/permissions: identify the adviser, authority and evidence. Incomplete cost scope: keep unknowns visible beside the subtotal. No checklist establishes year-round suitability or approves the actual work. Keep this record with drawings, assessments and written scopes. Nothing here sends an enquiry or calculates a personalised conversion result. PRIMARY SOURCES CHECKED 21 NOVEMBER 2026 Energy Saving Trust: home ventilation https://energysavingtrust.org.uk/advice/ventilation/ Scope: General relationship between insulation, airtightness and deliberate ventilation. Not a garden-office design rate or a diagnosis of an existing shed. Approved Document P: 2013 edition for England https://assets.publishing.service.gov.uk/media/5a802da7ed915d74e622ceed/BR_PDF_AD_P_2013.pdf Scope: Paragraphs 2.2–2.5 and section 3: domestic outbuilding scope, new-circuit notification and inspection/testing versus building-regulations records. No current wiring-standard edition or installation design is prescribed. GOV.UK: building regulations approval https://www.gov.uk/building-regulations-approval Scope: Approval checks for building alterations and distinction from planning permission. Use the relevant national route for the actual property and work. Planning Portal: garage conversion and building regulations https://www.planningportal.co.uk/permission/common-projects/garage-conversion/building-regulations/ Scope: England introductory guidance: converting a garage to habitable space normally requires building-regulations approval. Not a decision on this reader’s project. Planning Portal: loft conversion planning permission https://www.planningportal.co.uk/permission/common-projects/loft-conversion/ Scope: England planning conditions and exclusions; a loft alternative is not automatically approval-free. This source is not a structural or building-control design.